Extension of streets within the voivodship road 450 on the section from ‘Rogatka’ to the border of the city of Kalisz – stage I (Q2718070)

From EU Knowledge Graph
Revision as of 12:28, 4 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q2718070 in Poland
Language Label Description Also known as
English
Extension of streets within the voivodship road 450 on the section from ‘Rogatka’ to the border of the city of Kalisz – stage I
Project Q2718070 in Poland

    Statements

    0 references
    0 references
    27,265,000.0 zloty
    0 references
    6,061,009.5 Euro
    0.2223 Euro
    0 references
    55,114,210.64 zloty
    0 references
    12,251,889.03 Euro
    0.2223 Euro
    0 references
    49.47 percent
    0 references
    28 February 2020
    0 references
    31 December 2021
    0 references
    MIASTO KALISZ
    0 references
    0 references

    51°44'50.6"N, 18°4'46.6"E
    0 references
    Zakres inwestycji obejmuje rozbudowę drogi wojewódzkiej nr 450 w ciągu ul. Nowy Świat i odcinka ul. Częstochowskiej (od km 0+000 - "Rogatka" do km 2+521 - rejon skrzyżowania ul. Częstochowskiej z ul. Kubusia Puchatka) wraz z konieczną przebudową i budową uzbrojenia technicznego. Przewidziany do rozbudowy odcinek DW 450 o długości 2521 m kończy się w rejonie skrzyżowania ul. Częstochowskiej z ul. Kubusia Puchatka. Z uwagi na zaprojektowane do budowy rondo na skrzyżowaniu ulic Częstochowska-Budowlanych zachodzi potrzeba dostosowania połączenia geometrii nowego skrzyżowania z istniejącą geometrią ul. Częstochowskiej zlokalizowaną poza zakresem projektu.W ramach projektu przewidziano następujące etapy realizacji inwestycji:- Przejęcie gruntu za odszkodowaniem (w celu realizacji przedmiotowego projektu uzyskano decyzję ZRID zezwalającą na realizację inwestycji, po uprawomocnieniu decyzji właścicielem działek będzie województwo wielkopolskie, a zarządcą Prezydent Miasta Kalisza);- Roboty budowlane (rozbudowa odcinka drogi wojewódzkiej nr 450 w pasie ulic Nowy Świat i odcinka ul. Częstochowskiej tj. przebudowę skrzyżowań, sygnalizacji świetlnej, chodników, infrastruktury około drogowej).- Realizacja działań z zakresu nadzoru inwestorskiego;- Promocja projektu.W rezultacie przeprowadzonych działań inwestycyjnych rozbudowane zostanie 2521 metrów drogi wojewódzkiej, zwiększając efektywność infrastruktury wraz ze wzmocnieniem i dostosowaniem nawierzchni jezdni do przenoszenia obciążeń zgodnie z dyrektywą 96/53/WE tzw. dyrektywą naciskową tj. 115 kN/oś.Wśród odbiorców projektu znajdują się wszyscy mieszkańcy Miasta Kalisza, a zarazem całej Aglomeracji, uczniowie, studenci, pracownicy etatowi i pozostali mieszkańcy korzystający z infrastruktury drogowej, turyści oraz mieszkańcy innych regionów. Projekt wpłynie na poprawę komunikacji w Aglomeracji Kalisko-Ostrowskiej wraz z pozytywnym wpływem na przedsiębiorczość oraz rozwojem społecznym, gospodarczym i przestrzennym Kalisza. (Polish)
    0 references
    The scope of the investment includes the extension of the provincial road no. 450 along the street. The New World and the section of ul. Czestochowa (from km 0+ 000 – “Rogatka” to km 2 + 521 – area of the intersection of ul. Czestochowa from ul. Kubusia Pooh) with the necessary reconstruction and construction of technical weapons. The 2521 m long DW 450 section to be extended ends in the area of the intersection of ul. Czestochowa from ul. Winnie the Pooh. Due to the roundabout designed for construction at the intersection of Częstochowa-Budowlane streets, there is a need to adjust the link between the geometry of the new intersection and the existing geometry of ul. Czestochowa located outside the scope of the project. The project foresees the following stages of the investment:- Takeover of the land against compensation (in order to implement the project, a ZRID decision authorising the implementation of the investment was obtained, after the decision was final, the owner of the plots will be the Wielkopolska Voivodeship and the administrator of the Mayor of Kalisz);- Construction works (extension of the section of voivodship road No 450 in the zone of Nowy Świat Street and the section of ul. Czestochowa i.e. reconstruction of intersections, traffic lights, pavements, infrastructure around the road).- Implementation of investor supervision activities;- Promotion of the project.As a result of the investment activities carried out, 2521 meters of the provincial road will be expanded, increasing the efficiency of the infrastructure together with strengthening and adapting road surfaces to carry loads in accordance with Directive 96/53/EC, the so-called pressure directive, i.e. 115 kN/axis. Among the project’s recipients are all residents of the City of Kalisz, and at the same time the entire Agglomeration, students, employees and other residents using road infrastructure, tourists and residents of other regions. The project will improve communication in Kalisko-Ostrowska Agglomeration with a positive impact on entrepreneurship and the social, economic and spatial development of Kalisz. (English)
    8 July 2021
    0 references
    La portée de l’investissement comprend l’extension de la route provinciale no 450 le long de la rue. Le Nouveau Monde et la section d’ul. Czestochowa (du km 0+ 000 — «Rogatka» au km 2 + 521 — zone de l’intersection d’ul. Czestochowa d’ul. Kubusia Pooh) avec la reconstruction et la construction nécessaires d’armes techniques. La section DW 450 de 2 521 m de longueur doit être allongée dans la zone de l’intersection de l’ul. Czestochowa d’ul. Winnie le Pooh. En raison du rond-point conçu pour la construction à l’intersection des rues Częstochowa-Budowlane, il est nécessaire d’ajuster le lien entre la géométrie de la nouvelle intersection et la géométrie existante de l’ul. Czestochowa situé en dehors du cadre du projet. Le projet prévoit les étapes suivantes de l’investissement:- La reprise du terrain contre compensation (pour la mise en œuvre du projet, une décision ZRID autorisant la mise en œuvre de l’investissement a été obtenue, après la décision finale, le propriétaire des parcelles sera la voïvodie de Wielkopolska et l’administrateur du maire de Kalisz);- Travaux de construction (extension du tronçon de la route voïvodie no 450 dans la zone de la rue Nowy Świat et la section d’ul. Czestochowa, c’est-à-dire la reconstruction des intersections, des feux de circulation, des trottoirs, des infrastructures autour de la route).- Mise en œuvre des activités de surveillance des investisseurs;- Promotion du projet.A la suite des activités d’investissement menées, 2521 mètres de route provinciale seront agrandis, augmentant l’efficacité de l’infrastructure ainsi que le renforcement et l’adaptation des surfaces routières pour transporter des charges conformément à la directive 96/53/CE, dite directive pression, c’est-à-dire la reconstruction des intersections, des feux de circulation, des trottoirs, des infrastructures autour de la route).- Mise en œuvre des activités de surveillance des investisseurs;- Promotion du projet. 115 kN/axe. Parmi les bénéficiaires du projet figurent tous les résidents de la ville de Kalisz, et en même temps l’ensemble de l’agglomération, les étudiants, les employés et les autres résidents utilisant l’infrastructure routière, les touristes et les résidents d’autres régions. Le projet améliorera la communication dans l’agglomération de Kalisko-Ostrowska avec un impact positif sur l’esprit d’entreprise et le développement social, économique et spatial de Kalisz. (French)
    4 December 2021
    0 references

    Identifiers

    RPWP.05.01.04-30-0001/20
    0 references