“Improving the energy efficiency of kindergarten buildings 1 and 2 in Węgorzewo” (Q2717330)

From EU Knowledge Graph
Revision as of 12:27, 4 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q2717330 in Poland
Language Label Description Also known as
English
“Improving the energy efficiency of kindergarten buildings 1 and 2 in Węgorzewo”
Project Q2717330 in Poland

    Statements

    0 references
    0 references
    2,518,819.91 zloty
    0 references
    559,933.67 Euro
    0.2223 Euro
    0 references
    3,110,038.16 zloty
    0 references
    691,361.48 Euro
    0.2223 Euro
    0 references
    80.99 percent
    0 references
    4 February 2020
    0 references
    31 May 2022
    0 references
    GMINA WĘGORZEWO
    0 references

    54°12'49.7"N, 21°44'30.1"E
    0 references
    Projekt pt. "Zwiększenie efektywności energetycznej budynków przedszkoli nr 1 i nr 2 w Węgorzewie" polega na kompleksowej modernizacji dwóch obiektów zlokalizowanych przy ul. Portowej i ul. Jasnej w Węgorzewie. Prace polegały będą na: 1. ul. Portowa: • Docieplenie stropodachu • Docieplenie ścian zewnętrznych, • Wymiana okien i drzwi na nowe z nawiewnikami, • Docieplenie podłogi na gruncie • Wymiana instalacji co i cwu wraz z wymianą kotła węglowego na pompę ciepła • Montaż instalacji PV o mocy zainstalowanej 12,35 kW. 2. ul. Jasna: • Docieplenie stropodachu stromego • Docieplenie stropodachu płaskiego; • Docieplenie ścian zewnętrznych, • Wymiana okien i drzwi na nowe z nawiewnikami, • Docieplenie podłogi na gruncie • Wymiana instalacji co i cwu wraz z wymianą kotła gazowego na nowy kondensacyjny • Montaż instalacji PV o mocy zainstalowanej 12,35 kW. Projekt realizowany będzie przez firmę wyłonioną zgodnie z PZP przez Wnioskodawcę. Projekt wpisuje się w założenia SzOOP RPO WiM poprzez spełnienie limitów i ograniczeń w realizacji projektów, w szczególności: - dobór działań i ich zakres oraz kwalifikowalność wydatków przeprowadzono na podstawie audytu energetycznego, - poziom efektywności energetycznej projektu mierzony spadkiem zapotrzebowania na energię na podstawie obliczeń ujętych w audycie energetycznym spadł o ponad 60%, - redukcja CO2 na skutek termomodernizacji oraz wymiany źródła ciepła wynosi 100%, - wspierane urządzenia do ogrzewania charakteryzują się minimalnym poziomem efektywności energetycznej i normami emisji zanieczyszczeń, które zostały określone w środkach wykonawczych do dyrektywy 2009/125/WE z dnia 21 października 2009 r. ustanawiającej ogólne zasady ustalania wymogów dotyczących ekoprojektu dla produktów związanych z energią. (Polish)
    0 references
    Project: ‘Increasing the energy efficiency of the buildings of kindergarten No 1 and No 2 in Węgorzewo’ consists of a comprehensive modernisation of two buildings located at ul. Port and st. It’s clear in the Welds. The work will consist of: 1. st. Port: • Floor warming • Outside wall warming, • Replacement of windows and doors with new diffusers, • Floor warming on the ground • Replacement of the co- and thrust system together with the replacement of the coal boiler for a heat pump • Installation of the PV installation with an installed power of 12.35 kW. 2. st. Clear: • The warming of the steep terrain • The warming of the flat terrain; • Insulation of external walls, • Window and door replacement with new vents, • Floor warming on the ground • Replacement of the co- and thrust system together with the replacement of the gas boiler with a new condensation • Installation of the PV installation with an installed power of 12.35 kW. The project will be implemented by a company selected in accordance with the PZP by the Applicant. The project is in line with the assumptions of the SzOOP ROP WiM by meeting the limits and limitations in the implementation of projects, in particular: — the selection of measures and their scope and eligibility of expenditure were carried out on the basis of an energy audit, – the level of energy efficiency of the project as measured by the decrease in energy demand based on the calculations included in the energy audit decreased by more than 60 %, – the CO2 reduction due to thermal modernisation and heat generator exchange is 100 %, – the supported heating equipment has a minimum level of energy efficiency and emission standards, which are laid down in the implementing measures for Directive 2009/125/EC of 21 October 2009 establishing a framework for the setting of ecodesign requirements for energy-related products. (English)
    8 July 2021
    0 references
    Projet: «L’amélioration de l’efficacité énergétique des bâtiments de la maternelle no 1 et no 2 à Węgorzewo» consiste en une modernisation complète de deux bâtiments situés à ul. Bâbord et st. C’est clair dans les soudures. Les travaux comprendront: 1. m. Port: • Réchauffement du sol • Réchauffement extérieur des murs, • Remplacement des fenêtres et des portes par de nouveaux diffuseurs, • Réchauffage du sol au sol • Remplacement du système de co- et de poussée ainsi que remplacement de la chaudière au charbon pour une pompe à chaleur • Installation de l’installation PV d’une puissance installée de 12,35 kW. 2. m. Clair: • Le réchauffement du terrain escarpé • Le réchauffement du terrain plat; • Isolation des parois extérieures, • Remplacement des fenêtres et des portes par de nouvelles évents, • Réchauffement du sol au sol • Remplacement du système de co- et de poussée ainsi que remplacement de la chaudière à gaz par une nouvelle condensation • Installation de l’installation PV avec une puissance installée de 12,35 kW. Le projet sera mis en œuvre par une société sélectionnée conformément au PZP par la requérante. Le projet est conforme aux hypothèses du SzOOP ROP WiM en respectant les limites et les limites de la mise en œuvre des projets, en particulier: — la sélection des mesures ainsi que leur champ d’application et leur éligibilité des dépenses ont été effectuées sur la base d’un audit énergétique, — le niveau d’efficacité énergétique du projet, mesuré par la diminution de la demande d’énergie sur la base des calculs inclus dans l’audit énergétique, a diminué de plus de 60 %, — la réduction des émissions de CO2 due à la modernisation thermique et à l’échange de générateurs de chaleur est de 100 %, — les équipements de chauffage bénéficiant d’un soutien présentent un niveau minimal de normes en matière d’efficacité énergétique et d’émissions, qui sont fixées dans les mesures d’exécution de la directive 2009/125/CE du 21 octobre 2009 établissant un cadre pour la fixation d’exigences en matière d’écoconception applicables aux produits liés à l’énergie. (French)
    4 December 2021
    0 references

    Identifiers

    RPWM.04.03.01-28-0043/20
    0 references