Investments in RES in WARMIA – PLUS (Q2717206)

From EU Knowledge Graph
Revision as of 12:26, 4 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q2717206 in Poland
Language Label Description Also known as
English
Investments in RES in WARMIA – PLUS
Project Q2717206 in Poland

    Statements

    0 references
    700,795.25 zloty
    0 references
    155,786.78 Euro
    0.2223 Euro
    0 references
    824,465.0 zloty
    0 references
    183,278.57 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    27 November 2018
    0 references
    31 December 2020
    0 references
    FIRMA HANDLOWO - USŁUGOWA WARMIA - PLUS TOMASZ CHOJECKI
    0 references
    0 references

    54°4'51.2"N, 19°54'11.5"E
    0 references
    Wybrany wariant dotyczy budowy SYSTEMÓW FOTOWOLTAICZNYCH Z TOWARZYSZĄCĄ INFRASTRUKTURĄ NA POWIERZCHNI TERENU 0,5ha – TEREN ZABUDOWY PRZEMYSŁOWEJ Adres inwestycji: STOJPY, GM. GODKOWO, dz. nr 1/19 obr. 10 KARWITY. Moc znamionowa 133,80 kWp, Ilość modułów fotowoltaicznych 446 Ilość inwerterów DC/AC 4, powierzchnia zajmowana 729,21 m2. Na działce projektuje się: budowę wolnostojącego słupa rozłącznikowego SN 15kV budowę podziemnej linii kablowej SN 15kV budowę wolnostojącej kontenerowej stacji transf. SN/nN budowę podziemnej linii kablowej nN 0,4kV YAKXS 4x185mm2 budowę wolnostojącego złącza rozdzielczego budowę podziemnych linii kablowych budowę naziemnej katalogowej konstrukcji wsporczej pod panele fotowoltaiczne montaż 446szt. paneli fotowoltaicznych (moc pojedynczego panela 300W) montaż 4kpl. inwerterów AC/DC budowę podziemnych kabli solarnych 1x6mm2 budowę 5kpl. katalogowych masztów odgromowych o wys. 13,5m ponad gruntem, budowę podziemnej bednarki FeZn 30x4mm ilość inwerterów 4 Moc jednostkowa inwertera - 27,6 kW Etapy realizacji projektu: - złożenie wniosku o dofinansowanie - podpisanie umowy o dofinansowanie - wybór wykonawcy zgodnie z zasadą konkurencyjności - zawarcie umowy z wykonawcą i rozpoczęcie prac - realizacja prac zgodnie z założonym harmonogramem - zakończenie projektu i podpisanie protokołu końcowego - końcowe rozliczenie projektu Projekt wpisuje się w założenia wpisane w SzOOP RPOWiM realizując założony cel: Zwiększony udział OZE w ogólnym bilansie energetycznym regionu. Realizacja poddziałania pozwoli na zwiększenie udziału energii odnawialnej w bilansie energ. przedsiębiorstwa, co wpłynie na zwiększenie udziału energii odnawialnej w bilansie energ. Regionu. Wpłynie to na ograniczenie emisji szkodliwych gazów i pyłów do atmosfery oraz dzięki wykorzystaniu lokalnych źródeł energii odnawialnej zwiększy konkurencyjność firmy. W wyniku realizacji inwestycji spadną koszty związane z zużyciem energii. (Polish)
    0 references
    The selected option concerns the construction of photovoltaic systems with accompanying INFRASTRUCTURE FOR THE AIR TEREN 0.5 ha – INDUSTRIAL TEREN TEREN Investment address: STOJPY, GM. Godkowo, d. No. 1/19 r. 10 KARWITY. Rated power 133.80 kWp, Number of photovoltaic modules 446 Number of DC/AC inverters 4, occupied area 729.21 m². The plot shall be designed for: construction of the SN 15 kV freestanding disconnection pole construction of an underground cable line SN 15 kV construction of a freestanding transf container station. SN/nN construction of an underground cable line nN 0.4 kV YAKXS 4x185 mm² construction of a freestanding distribution connector construction of underground cable lines construction of a ground-based supporting structure for photovoltaic panels assembling 446pcs photovoltaic panels (power of a single panel 300 W) installation of 4kpl. AC/DC inverters construction of underground solar cables 1x6 mm² construction of 5kpl. catalogue lightning masts of height. 13.5 m above ground, construction of FeZn underground cooper 30x4 mm number of inverters 4 Inverter power – 27.6 kW Stages of project implementation: — submission of the application for funding – signature of the grant agreement – selection of the contractor in accordance with the principle of competitiveness – conclusion of the contract with the contractor and commencement of works – implementation of the works in accordance with the planned timetable – completion of the project and signing of the final protocol – final settlement of the project The project is in line with the assumptions entered in the SzOOP RPOW for the purpose of: Increased share of RES in the region’s overall energy balance. The implementation of the sub-measure will increase the share of renewable energy in the balance sheet of the company, which will increase the share of renewable energy in the energy balance sheet. The region. This will reduce emissions of harmful gases and dusts into the atmosphere and increase the competitiveness of the company through the use of local renewable energy sources. As a result of the investment, the costs associated with energy consumption will decrease. (English)
    8 July 2021
    0 references
    L’option retenue concerne la construction de systèmes photovoltaïques accompagnés d’INFRASTRUCTURE FOR THE AIR TEREN 0,5 ha — INDUSTRIAL TEREN TEREN Adresse d’investissement: STOJPY, GM. Godkowo, d. No 1/19 r. 10 KARWITY. Puissance nominale 133,80 kWp, nombre de modules photovoltaïques 446 Nombre d’onduleurs DC/AC 4, superficie occupée 729,21 m². La parcelle doit être conçue pour: construction d’un poteau de déconnexion autoportant SN 15 kV d’une ligne de câble souterraine SN 15 kV construction d’une station de conteneurs transf autoportants. SN/nN construction d’une ligne de câble souterrain nN 0,4 kV YAKXS 4x185 mm² construction d’un connecteur de distribution autonome construction de lignes de câbles souterrains construction d’une structure de support au sol pour panneaux photovoltaïques assemblant 446pcs panneaux photovoltaïques (puissance d’un seul panneau 300 W) installation d’onduleurs AC/DC 4kpl. construction de câbles solaires souterrains 1x6 mm² construction de mâts de foudre catalogue 5 kpl de hauteur. 13,5 m au-dessus du sol, construction d’une coopératrice souterraine FeZn 30x4 mm nombre d’onduleurs 4 Puissance de l’onduleur — 27,6 kW Étapes de mise en œuvre du projet: — présentation de la demande de financement — signature de la convention de subvention — sélection du contractant selon le principe de compétitivité — conclusion du contrat avec le contractant et début des travaux — exécution des travaux selon le calendrier prévu — achèvement du projet et signature du protocole final — règlement final du projet Le projet est conforme aux hypothèses figurant dans le RPOW SzOOP aux fins: Augmentation de la part des SER dans le bilan énergétique global de la région. La mise en œuvre de la sous-mesure augmentera la part des énergies renouvelables dans le bilan de l’entreprise, ce qui augmentera la part des énergies renouvelables dans le bilan énergétique. La région. Cela permettra de réduire les émissions de gaz et de poussières nocifs dans l’atmosphère et d’accroître la compétitivité de l’entreprise grâce à l’utilisation de sources d’énergie renouvelables locales. À la suite de l’investissement, les coûts associés à la consommation d’énergie diminueront. (French)
    4 December 2021
    0 references

    Identifiers

    RPWM.04.01.00-28-0142/18
    0 references