Construction of 1 MW RES installation in Wałcz (Q2718696)

From EU Knowledge Graph
Revision as of 12:24, 4 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q2718696 in Poland
Language Label Description Also known as
English
Construction of 1 MW RES installation in Wałcz
Project Q2718696 in Poland

    Statements

    0 references
    1,879,712.41 zloty
    0 references
    417,860.07 Euro
    0.2223 Euro
    0 references
    2,349,640.53 zloty
    0 references
    522,325.09 Euro
    0.2223 Euro
    0 references
    80.0 percent
    0 references
    1 October 2020
    0 references
    31 December 2021
    0 references
    SOLARIS SYSTEM SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references

    53°5'38.4"N, 16°7'2.3"E
    0 references
    Przedmiotem projektu będzie budowa elektrowni fotowoltaicznej o mocy do 1MW na terenie gminy wiejskiej Wałcz. Projekt zostanie zrealizowany w 1 etapie "Wybudowanie farmy fotowoltaicznej o mocy do 1MW ” Rozpoczęcie realizacji projektu: 1 października 2020r. Na zamówienie składają się następujące elementy: A. Ogrodzenie terenu (zakup materiałów wraz z wykonaniem niezbędnych robót) B. Zakup i instalacja monitoringu przemysłowego (zakup materiałów wraz z wykonaniem niezbędnych robót) C. Informacja i promocja (zakup tablicy informacyjnej i pamiątkowej) D. Zakup i instalacja konstrukcji nośnej (zakup materiałów wraz z wykonaniem niezbędnych robót) E. Zakup i instalacja kompletu modułów fotowoltaicznych (zakup materiałów wraz z wykonaniem niezbędnych robót) F. Zakup i instalacja okablowania (zakup materiałów wraz z wykonaniem niezbędnych robót) G. Zakup i instalacja stacji transformatorowej (zakup materiałów wraz z wykonaniem niezbędnych robót) H. Zakup i instalacja zestawu przyłączeniowego przetwornic (zakup materiałów wraz z wykonaniem niezbędnych robót) I. Zakup i instalacja falownika fotowoltaicznego (zakup materiałów wraz z wykonaniem niezbędnych robót) J. Wykonanie przyłącza (zakup materiałów wraz z wykonaniem niezbędnych robót) Sposób wdrożenia: Wnioskodawca zamierza samodzielnie wdrażać realizacje projektu. Wnioskodawca posiada niezbędne zasoby kadrowe do właściwej obsługi zadań w ramach projektu. Projekt ma charakter stacjonarny gdyż budowa elektrowni fotowoltaicznej będzie trwale związana z gruntem. (Polish)
    0 references
    The project will focus on the construction of a photovoltaic power plant with a capacity of up to 1 MW in the rural municipality of Wałcz. The project will be carried out in the first stage of “Construction of a photovoltaic farm with a capacity of up to 1 MW” 1 October 2020 The order consists of the following elements: A. Land fence (purchase of materials and execution of necessary works) B. Purchase and installation of industrial monitoring (purchase of materials and execution of the necessary works) C. Information and promotion (purchase of information and souvenir board) D. Purchase and installation of the supporting structure (buying materials together with execution of the necessary works) E. Purchase and installation of a set of photovoltaic modules (purchase of materials and execution of necessary works) F. Purchase and installation of wiring (buying materials together with execution of necessary works) G. Purchase and installation of a transformer station (purchase of materials including execution of the necessary works) H. Purchase and installation of a set of connection inverters (purchase of materials and execution of the necessary works) I. Purchase and installation of a photovoltaic inverter (purchase of materials and execution of the necessary works) J. Implementation of the connection (purchase of materials and execution of the necessary works) The applicant intends to implement the project itself. The applicant has the necessary human resources to properly handle the tasks within the project. The project is stationary because the construction of a photovoltaic power plant will be permanently linked to the ground. (English)
    8 July 2021
    0 references
    Le projet sera axé sur la construction d’une centrale photovoltaïque d’une capacité maximale de 1 MW dans la municipalité rurale de Wałcz. Le projet sera réalisé dans la première phase de «Construction d’une ferme photovoltaïque d’une capacité maximale de 1 MW». 1er octobre 2020 L’ordre se compose des éléments suivants: A. Clôture du terrain (achat de matériaux et exécution des travaux nécessaires) B. Achat et installation de la surveillance industrielle (achat de matériaux et exécution des travaux nécessaires) C. Informations et promotion (achat d’information et carte souvenir) D. Achat et installation de la structure de support (achat de matériaux avec exécution des travaux nécessaires) E. Achat et installation d’un ensemble de modules photovoltaïques (achat de matériaux et exécution des travaux nécessaires) F. Achat et installation de câblage (achat de matériaux avec exécution des travaux nécessaires) G. achat et installation d’une station de transformation (achat de matériaux y compris l’exécution des travaux nécessaires) H. Achat et installation d’un ensemble d’onduleurs de raccordement (achat de matériaux et exécution des travaux nécessaires) I. Achat et installation d’un onduleur photovoltaïque (achat de matériaux et exécution des travaux nécessaires) J. Mise en œuvre de la connexion (achat de matériaux et exécution des travaux nécessaires) Le demandeur a l’intention de mettre en œuvre le projet lui-même. Le demandeur dispose des ressources humaines nécessaires pour mener à bien les tâches du projet. Le projet est stationnaire car la construction d’une centrale photovoltaïque sera reliée en permanence au sol. (French)
    4 December 2021
    0 references

    Identifiers

    RPZP.02.10.00-32-C088/20
    0 references