Construction of a source of high-efficiency cogeneration in Dębno (Q2718711)
Jump to navigation
Jump to search
Project Q2718711 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a source of high-efficiency cogeneration in Dębno |
Project Q2718711 in Poland |
Statements
1,929,030.0 zloty
0 references
3,215,050.0 zloty
0 references
60.0 percent
0 references
29 November 2019
0 references
31 December 2021
0 references
SEC ENERGIA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
Projekt obejmuje realizację zakresu rzeczowego w terminie 29.11.2019 r. - 31.12.2021 r. i obejmuje 2 zadania: - zadanie nr 1: Realizacja inwestycji w formule "zaprojektuj i wybuduj", - zadanie nr 2: Promocja projektu. W ramach zadania nr 1 zaplanowano następujące prace: - wykonanie wielobranżowej kompletnej dokumentacji projektowej wraz z uzyskaniem wszelkich wymaganych uzgodnień i pozwoleń, w tym prawomocnego pozwolenia na budowę i innych uzgodnień niezbędnych do uzyskania pozwolenia na użytkowanie, - wykonanie specyfikacji technicznych wykonania i odbioru robót budowlanych, - wykonanie kosztorysów i przedmiarów robót budowlanych, - wykonanie robót budowlanych i technologicznych dot. budowy wysokosprawnego gazowego źródła kogeneracyjnego na bazie silnika gazowego współpracującego z istniejącym systemem ciepłowniczym w Dębnie oraz budowy przyłącza gazowego, technologicznego i elektroenergetycznego związanego z wyprowadzeniem wyprodukowanej energii elektrycznej do systemu elektroenergetycznego lokalnego OSD. W ramach zadania nr 2 przewidziano zakup i montaż tablicy informacyjnej i pamiątkowej. Projekt będzie realizowany samodzielnie przez Wnioskodawcę. W efekcie projektu Wnioskodawca wybuduje kompleksową instalację wysokosprawnej kogeneracji (instalacja będzie cechować się minimum 10% uzyskiem efektywności energetycznej) zasilaną gazem ziemnym, o mocy cieplnej 0,665 MWt i mocy elektrycznej 0,565 MWe skonstruowaną w wielkości odpowiadającej lokalnemu zapotrzebowaniu na ciepło użytkowe. W wyniku projektu zwiększona zostanie efektywność energetyczna ciepłowni w Dębnie i nastąpi redukcja emisji CO2 powstająca w wyniku jej funkcjonowania. Projekt stanowi kolejny etap realizacji planu działania SEC dot. zwiększenia efektywności energetycznej systemu ciepłowniczego w Dębnie. Korzystanie z efektów projektu będzie możliwe bezpośrednio po zakończeniu projektu bez konieczności podejmowania innych działań/projektów. (Polish)
0 references
The project covers the implementation of the material scope from 29.11.2019 to 31.12.2021 and includes 2 tasks: — task 1: Implementation of the investment in the “design and build” formula – task 2: Promotion of the project. As part of activity 1, the following works are planned: — execution of multi-discipline complete design documentation with obtaining all required arrangements and permits, including a valid building permit and other arrangements necessary to obtain a permit for use, – execution of technical specifications for the execution and acceptance of construction works, – execution of cost estimates and pre-measures of construction works, – execution of construction and technological works concerning the construction of a high-efficiency gas cogeneration source on the basis of a gas engine cooperating with the existing heating system in Dębno, and construction of a gas, technological and electricity connection related to the export of the electricity produced to the local OSD electricity system. Task No 2 provided for the purchase and installation of an information and commemorative board. The project will be carried out independently by the Applicant. As a result of the project, the Applicant will build a comprehensive high-efficiency cogeneration installation (the installation will have a minimum of 10 % energy efficiency) powered by natural gas, with a thermal input of 0.665 MWt and an electrical capacity of 0,565 MWe constructed in size corresponding to the local useful heat demand. As a result of the project, the energy efficiency of the heating plant in Dębno will be increased and CO2 emissions resulting from its operation will be reduced. The project is the next stage in the implementation of the SEC action plan for increasing the energy efficiency of the district heating system in Dębno. The use of project effects will be possible immediately after the end of the project without the need for other actions/projects. (English)
8 July 2021
0 references
Le projet couvre la mise en œuvre du champ d’application matériel du 29.11.2019 au 31.12.2021 et comprend deux tâches: tâche 1: Mise en œuvre de l’investissement dans la formule «conception et construction» — tâche 2: Promotion du projet. Dans le cadre de l’activité 1, les travaux suivants sont prévus: — exécution d’une documentation de conception complète multidisciplinaire avec l’obtention de tous les arrangements et permis requis, y compris un permis de construire en cours de validité et autres dispositions nécessaires à l’obtention d’un permis d’utilisation, — exécution des spécifications techniques pour l’exécution et la réception des travaux de construction, — exécution des estimations de coûts et des mesures préalables des travaux de construction, — exécution des travaux de construction et des travaux technologiques concernant la construction d’une source de cogénération de gaz à haut rendement sur la base d’un moteur à gaz coopérant avec le système de chauffage existant à Dębno, et construction d’un raccordement gaz, technologique et électrique lié à l’exportation de l’électricité produite vers le réseau électrique local OSD. La tâche no 2 prévoyait l’achat et l’installation d’un tableau d’information et de commémoration. Le projet sera réalisé de manière indépendante par la requérante. À la suite du projet, la requérante construira une installation complète de cogénération à haut rendement (l’installation aura une efficacité énergétique minimale de 10 %) alimentée au gaz naturel, d’une puissance thermique de 0,665 MWt et d’une capacité électrique de 0,565 MWe construite en taille correspondant à la demande locale de chaleur utile. Grâce au projet, l’efficacité énergétique de l’installation de chauffage de Dębno sera augmentée et les émissions de CO2 résultant de son exploitation seront réduites. Le projet constitue la prochaine étape de la mise en œuvre du plan d’action de la SEC visant à accroître l’efficacité énergétique du système de chauffage urbain à Dębno. L’utilisation des effets du projet sera possible immédiatement après la fin du projet, sans qu’il soit nécessaire de recourir à d’autres actions/projets. (French)
4 December 2021
0 references
Identifiers
RPZP.02.12.00-32-B006/19
0 references