Equipping SP ZOZ District Hospital in Pisz with tools to support the fight against COVID-19 (Q2717447)

From EU Knowledge Graph
Revision as of 12:14, 4 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q2717447 in Poland
Language Label Description Also known as
English
Equipping SP ZOZ District Hospital in Pisz with tools to support the fight against COVID-19
Project Q2717447 in Poland

    Statements

    0 references
    0 references
    996,871.75 zloty
    0 references
    221,604.59 Euro
    0.2223 Euro
    0 references
    1,203,224.8 zloty
    0 references
    267,476.87 Euro
    0.2223 Euro
    0 references
    82.85 percent
    0 references
    1 March 2020
    0 references
    31 December 2020
    0 references
    SAMODZIELNY PUBLICZNY ZAKŁAD OPIEKI ZDROWOTNEJ SZPITAL POWIATOWY W PISZU
    0 references
    0 references

    53°37'46.2"N, 21°48'35.3"E
    0 references
    SP ZOZ Szpital Powiatowy w Piszu wskazany jest jako 1 z 4 w woj. warmińsko- mazurskim do pełnienia funkcji jednoimiennego szpitala zakaźnego w walce z COVID-19. Projekt zakłada doposażenie szpitala w narzędzia służące walce z COVID-19: sprzęt medyczny, urządzenia do dezynfekcji, zakup ambulansu transportowego do przewozu osób chorych- pacjentów zakaźnych wymagających leczenia w specjalistycznym szpitalu wyższego stopnia. Doposażenie służyć będzie pracy oddziału obserw.-zakaźnego, izolatorium oraz całodobowego punktu pobrań materiału biologicznego. Planuje się, że na 31.XII.2021r. w wyniku realizacji projektu wsparciem objętych zostnie min. 456 osób z woj.warm.-mazurskiego, w tym mieszkańców powiatu piskiego. Ostateczna liczba beneficjentów objętych wsparciem wynikać będzie z rozwoju sytuacji epidemiologicznej na terytorium RP i województwa. Projekt wdrażany będzie jednoetapowo. W związku z postawieniem szpitala w stan gotowości (decyzja nr 6/2020 r. Wojewody Warm.-Mazurskiego dn. 07.04.20r.) oraz wprowadzeniem na obszarze RP stanu epidemii- rozporządzenie Ministra Zdrowia z dn. 20.03.2020 r. (Dz. U. poz. 491 z późn. zm.) dostawy realizowane będą z zastosowaniem art. 6.1. Ustawy z dnia 02.03.20r. o szczególnych rozwiązaniach związanych z zapobieganiem, przeciwdziałaniem i zwalczaniem COVID-19, innych chorób zakaźnych oraz wywołanych nimi sytuacji kryzysowych. Zakres zadania i jego cele wskazują, że projekt realizuje cele SzOOP RPO WiM Działanie 9.1.Infrastruktura ochrony zdrowia poddziałanie 9.1.1 Rozwój specjalistycznych usług medycznych CT 9. Priorytet 9a Inwestycje w infrastrukturę zdrowotną i społeczną, które przyczyniają się do rozwoju krajowego, regionalnego i lokalnego, zmniejszania nierówności w zakresie stanu zdrowia oraz przejścia z usług instytucjonalnych do usług na poziomie społeczności lokalnych, Cel szczegółowy: Podniesienie jakości i skuteczności usług zdrowotnych, typ II. Sytuacja epidemiologiczna – COVID-19, Schemat D – Frontowe podmioty lecznicze. (Polish)
    0 references
    SP ZOZ District Hospital in Pisz is indicated as 1 out of 4 in Warmińsko-Mazurskie voivodship to perform the function of a single-name infectious hospital in the fight against COVID-19. The project involves equipping the hospital with tools to fight COVID-19: medical equipment, disinfection equipment, purchase of a transport ambulance for the transport of sick people – infectious patients requiring treatment in a specialised higher-degree hospital. Retrofitting will be used for the work of the Infectious Observation Department, the isolatory and the 24-hour collection point of biological material. It is planned that on 31st February 2021, as a result of the implementation of the project, 456 people from Warm-Mazury Province, including residents of the Piski county, were supported by at least 456 people. The final number of beneficiaries supported will result from the evolution of the epidemiological situation in the territory of the Republic of Poland and the province. The project will be implemented in one step. In connection with the hospital being put on standby (Decision No 6/2020 of the Governor of Warm-Mazurskie dn. 07.04.20) and the introduction in the territory of the Republic of Poland of a state of epidemic – Ordinance of the Minister of Health of 20/03/2020 U. Item 491 as amended) deliveries will be made in application of Article 6.1. The Act of 02.03.20 on special solutions related to the prevention, prevention and control of COVID-19, other communicable diseases and crisis situations caused by them. The scope of the task and its objectives indicate that the project fulfils the objectives of the SzOOP ROP WiM Action 9.1.Health infrastructure sub-measure 9.1.1 Development of specialised medical services CT 9. Priority 9a Investments in health and social infrastructure that contribute to national, regional and local development, reducing health inequalities and the transition from institutional to community-based services, Specific objective: Improving the quality and effectiveness of health services, type II. Epidemiological situation – COVID-19, Diagram D – Front Medical Operators. (English)
    8 July 2021
    0 references
    SP ZOZ District Hospital à Pisz est indiqué comme étant 1 sur 4 dans la voïvodie de Warmińsko-Mazurskie pour remplir la fonction d’un hôpital infectieux à nom unique dans la lutte contre la COVID-19. Le projet consiste à doter l’hôpital d’outils de lutte contre la COVID-19: matériel médical, matériel de désinfection, achat d’une ambulance de transport pour le transport des malades — patients infectieux nécessitant un traitement dans un hôpital spécialisé de haut niveau. Les travaux du service d’observation infectieuse, de l’isolatoire et du point de collecte 24 heures sur 24 du matériel biologique seront utilisés. Il est prévu que le 31 février 2021, à la suite de la mise en œuvre du projet, 456 personnes de la province de Warm-Mazury, y compris des résidents du comté de Piski, ont bénéficié du soutien d’au moins 456 personnes. Le nombre final de bénéficiaires bénéficiant d’un soutien résultera de l’évolution de la situation épidémiologique sur le territoire de la République de Pologne et de la province. Le projet sera mis en œuvre en une seule étape. Dans le cadre de la mise en attente de l’hôpital (décision no 6/2020 du gouverneur de Warm-Mazurskie dn. 07.04.20) et l’introduction sur le territoire de la République de Pologne d’un état d’épidémie — Ordonnance du ministre de la Santé 20/03/2020 U. Article 491 dans sa version modifiée) les livraisons seront effectuées en application de l’article 6.1. La loi du 02.03.20 sur les solutions spéciales liées à la prévention, à la prévention et au contrôle de la COVID-19, d’autres maladies transmissibles et des situations de crise causées par celles-ci. La portée de la tâche et ses objectifs indiquent que le projet répond aux objectifs de l’action SzOOP ROP WiM Action 9.1.Infrastructures de santé sous-mesure 9.1.1 Développement de services médicaux spécialisés CT 9. Priorité 9a Investissements dans les infrastructures sanitaires et sociales qui contribuent au développement national, régional et local, à la réduction des inégalités en matière de santé et au passage des services institutionnels à des services communautaires Objectif spécifique: Améliorer la qualité et l’efficacité des services de santé de type II. Situation épidémiologique — COVID-19, Diagramme D — Opérateurs médicaux avant. (French)
    4 December 2021
    0 references

    Identifiers

    RPWM.09.01.01-28-0024/20
    0 references