Construction of a photovoltaic power plant by Amper in Jerutki (Q2717159)
Jump to navigation
Jump to search
Project Q2717159 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a photovoltaic power plant by Amper in Jerutki |
Project Q2717159 in Poland |
Statements
2,485,479.66 zloty
0 references
3,106,849.58 zloty
0 references
80.0 percent
0 references
6 April 2020
0 references
30 April 2021
0 references
AMPER SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
Inwestycja objęta niniejszym projektem polega na budowie elektrowni fotowoltaicznej o mocy 0,999 MW w miejscowości Jerutki na dz.nr 145, obręb Jerutki. W ramach niniejszego projektu projektuje się: 3700 szt. paneli fotowoltaicznych polikrystalicznych o mocy 270 W. Panele zostaną zamontowane na gruncie na pod konstrukcjach ze stali ocynkowanej ogniowo lub aluminiowych. Projekt zakłada zastosowanie 50 inwerterów o mocy 20 kW, zabezpieczeń, okablowania oraz budowę stacji Trafo i przyłącza elektroenergetycznego. Projekt wpisuje się w typ projektu wymieniony w SzOOP RPO WiM 2014-2020 dla działania 4.1- instalacji wykorzystujących energię słońca (np. kolektory słoneczne, fotowoltaika)-do 2 MWe/MWth. Instalacja zgodnie z możliwością opisaną w SzOOP będzie służyła celom komercyjnym - wyprodukowana energia elektryczna będzie sprzedawana w 100% na rynku konkurencyjnym. Zgodnie ustawą z dnia 20 lutego 2015 r. o odnawialnych źródłach energii (Dz. U. 2015 poz. 478) oraz z art. 2 pkt 2 ustawy z dnia 7 czerwca 2018 r. o zmianie ustawy o odnawialnych źródłach energii oraz niektórych innych ustaw (Dz.U. 2018 poz. 1276.)pozwolenia na budowę wymaga wykonywanie robót budowlanych polegających na montażu urządzeń fotowoltaicznych o zainstalowanej mocy elektrycznej powyżej 50 kW. W związku z tym, wnioskodawca wystąpił z wnioskiem o pozwolenie na budowę. Panele fotowoltaiczne wykorzystują zjawisko fotowoltaiczne do falowników, gdzie następuje zmiana prądu stałego w prąd zmienny. Połączone między sobą tworzą łańcuchy, z których energia przekazywana jest za pomocą połączeń kablowych do falowników. Elektrownia będzie podłączona do sieci, natomiast nie będzie potrzeby instalowania akumulatorów oraz regulatorów ładowania, ponieważ siec jak w stanie przyjąć całą energię wyprodukowaną przez system fotowoltaiczny. Wyprodukowana energia elektryczna będzie sprzedawana w 100% na rynku konkurencyjnym. Projekt spełnia wszystkie warunki brzegowe określone w SzOOP RPO WiM 2014-2020. (Polish)
0 references
The investment covered by this project consists of the construction of a 0.999 MW photovoltaic power plant in Jerutki at junction No 145, Jerutka. This project is designed to: 3700 pcs of 270 W polycrystalline photovoltaic panels. Panels will be mounted on the ground under constructions of hot-dip galvanised steel or aluminium. The project involves the use of 50 inverters with a power of 20 kW, security, wiring and construction of Trafo station and power connection. The project fits into the project type listed in the SzOOP ROP WiM 2014-2020 for action 4.1- installations using solar energy (e.g. solar collectors, photovoltaics) – up to 2 MWe/MWth. According to the possibility described in SzOOP, the installation will serve commercial purposes – the electricity produced will be sold 100 % on the competitive market. Pursuant to the Act of 20 February 2015 on renewable energy sources (Dz. U. 2015, item. 478) and Article 2(2) of the Act of 7 June 2018 amending the Renewable Energy Sources Act and certain other acts (Journal of Laws 2018, item. 1276.)the construction permit requires the execution of construction works consisting of the installation of photovoltaic devices with an installed electrical power exceeding 50 kW. Therefore, the applicant applied for a building permit. Photovoltaic panels use the photovoltaic phenomenon for inverters, where there is a change of DC into alternating current. Connected to each other, they form chains from which energy is transmitted by means of cable connections to inverters. The power plant will be connected to the grid, but there will be no need to install batteries and charge regulators, because the network is able to absorb all the energy produced by the photovoltaic system. The electricity produced will be sold 100 % in a competitive market. The project meets all the boundary conditions laid down in the SzOOP ROP WiM 2014-2020. (English)
8 July 2021
0 references
L’investissement couvert par ce projet consiste en la construction d’une centrale photovoltaïque de 0,999 MW à Jerutki, à la jonction no 145, Jerutka. Ce projet est conçu pour: 3700 pièces de 270 W panneaux photovoltaïques polycristallin. Les panneaux seront montés sur le sol sous des constructions en acier galvanisé à chaud ou en aluminium. Le projet prévoit l’utilisation de 50 onduleurs d’une puissance de 20 kW, la sécurité, le câblage et la construction d’une station Trafo et d’une connexion électrique. Le projet s’inscrit dans le type de projet indiqué dans le SzOOP ROP WiM 2014-2020 pour l’action 4.1 — installations utilisant l’énergie solaire (par exemple capteurs solaires, photovoltaïques) — jusqu’à 2 MWe/MWth. Selon la possibilité décrite dans SzOOP, l’installation servira à des fins commerciales — l’électricité produite sera vendue à 100 % sur le marché concurrentiel. Conformément à la loi du 20 février 2015 sur les sources d’énergie renouvelables (Dz. U. 2015, point. 478) et l’article 2, paragraphe 2, de la loi du 7 juin 2018 modifiant la loi sur les sources d’énergie renouvelables et certaines autres lois (Journal officiel 2018, point. 1276.)le permis de construction exige l’exécution de travaux de construction consistant en l’installation de dispositifs photovoltaïques d’une puissance électrique installée supérieure à 50 kW. Par conséquent, le demandeur a demandé un permis de construire. Les panneaux photovoltaïques utilisent le phénomène photovoltaïque pour les onduleurs, où il y a un changement de courant continu en courant alternatif. Connectés les uns aux autres, ils forment des chaînes à partir desquelles l’énergie est transmise au moyen de connexions par câble aux onduleurs. La centrale électrique sera connectée au réseau, mais il n’y aura pas besoin d’installer des batteries et des régulateurs de charge, car le réseau est capable d’absorber toute l’énergie produite par le système photovoltaïque. L’électricité produite sera vendue à 100 % sur un marché concurrentiel. Le projet répond à toutes les conditions limites fixées dans le SzOOP ROP WiM 2014-2020. (French)
4 December 2021
0 references
Identifiers
RPWM.04.01.00-28-0049/18