4,091,418.9 zloty
0 references
6,819,031.54 zloty
0 references
60.0 percent
0 references
1 October 2020
0 references
31 October 2021
0 references
GMINA WOJNICZ
0 references
Zakresem projektu objęto trzy obiekty tj.:1.Szkoła Podstawowa w Wojniczu: powierzchnia użytkowa budynku 9870,50 m2 wniosek obejmuje pełny zakres wynikający z audytu: ocieplenie ścian zewnętrznych, izolacja stropu poddasza budynku, przewiązki, ścian piwnic, wymiana okien z nawiewnikami, wymiana drzwi, wykonanie centralnej instalacji grzewczej w budynkach C,D,S, w tym grzejniki, rurociągi; kotły gazowe we wszystkich budynkach; montaż 5 zasobników do podgrzania wody. Ponadto przewidziano prace niewynikające z audytu tj. malowanie ścian i sufitów wewnętrznych 2.Zespół SzkolnoPrzedszkolny w Wielkiej Wsi: powierzchnia użytkowa budynku 1465,50 m2 wniosek obejmuje pełny zakres wynikający z audytu: ocieplenie ścian zewnętrznych, stropu piwnic, szatni, pietra i pomieszczenia intendenta, wymiana części okien i wymiana drzwi wejściowych, modernizację kotłowni i wymianę zasobnika c.w.u. Ponadto zaplanowano prace niewynikające z audytu tj. renowację krat, położenie kabla elektrycznego, renowację schodów niebędących częścią elewacji, rozbiórka wjazdu do garażu i wykonanie dodatkowych schodów zewnętrznych, malowanie podbitki 3.Wiejski Dom Kultury z pomieszczeniami OSP w Wielkiej Wsi :powierzchnia użytkowa budynku 535,65 m2 wniosek obejmuje pełny zakres wynikający z audytu: ocieplenie ścian, ocieplenie stropu pod nieogrzewanym poddaszem, wymianę dwóch bram garażowych. Warunki specyficzne opisano w części Q. (Polish)
0 references
The scope of the project covered three sites, i.e.: 1.The Primary School in Wojnicz: the usable area of the building 9870.50 m² the application covers the full range resulting from the audit: insulation of external walls, insulation of the attic ceiling of the building, harnesses, basement walls, replacement of windows with diffusers, replacement of doors, execution of a central heating system in buildings C,D,S, including radiators, pipelines; gas boilers in all buildings; installation of 5 storage tanks for heating water. In addition, works not resulting from the audit, i.e. painting of internal walls and ceilings, are foreseen for 2.The School Team in the Great Village: the usable area of the building 1465.50 m² the application covers the full range resulting from the audit: insulation of external walls, basement ceiling, cloakroom, floor and authorising officer’s rooms, replacement of window parts and replacement of entrance doors, modernisation of boiler room and replacement of the hot water storage tank. In addition, works not resulting from the audit have been planned, i.e. renovation of gratings, location of electric cable, renovation of stairs not part of the facade, demolition of the entrance to the garage and execution of additional external stairs, painting of the 3. Village Culture House with OSP premises in the Great Wsi:powierzchnia usable building 535.65 m² the application covers the full range resulting from the audit: insulation of the walls, warming of the ceiling under the unheated attic, replacement of two garage doors. The specific conditions are described in Part Q. (English)
7 July 2021
0 references
Le projet a porté sur trois sites, à savoir: 1.L’école primaire de Wojnicz: la surface utilisable du bâtiment 9 870,50 m² de la demande couvre toute la gamme résultant de l’audit: isolation des murs extérieurs, isolation du plafond grenier du bâtiment, harnais, murs de sous-sol, remplacement des fenêtres par des diffuseurs, remplacement des portes, exécution d’un système de chauffage central dans les bâtiments C,D,S, y compris radiateurs, pipelines; chaudières à gaz dans tous les bâtiments; installation de 5 réservoirs de stockage pour le chauffage de l’eau. En outre, les travaux qui ne résultent pas de l’audit, c’est-à-dire la peinture de murs et de plafonds intérieurs, sont prévus pour 2.L’équipe scolaire du Grand Village: la surface utilisable du bâtiment 1 465,50 m² de la demande couvre toute la gamme résultant de l’audit: isolation des murs extérieurs, plafond sous-sol, vestiaire, étage et locaux de l’ordonnateur, remplacement des parties de fenêtres et remplacement des portes d’entrée, modernisation de la chaufferie et remplacement du réservoir de stockage d’eau chaude. En outre, des travaux non issus de l’audit ont été planifiés, c’est-à-dire la rénovation des grilles, l’emplacement du câble électrique, la rénovation des escaliers ne faisant pas partie de la façade, la démolition de l’entrée du garage et l’exécution d’escaliers extérieurs supplémentaires, la peinture de la 3. Maison de Culture de Village avec locaux OSP dans le Grand Wsi:powierzchnia bâtiment utilisable 535,65 m² l’application couvre toute la gamme résultant de l’audit: isolation des murs, réchauffement du plafond sous le grenier non chauffé, remplacement de deux portes de garage. Les conditions particulières sont décrites dans la partie Q. (French)
4 December 2021
0 references
Identifiers
RPMP.04.03.02-12-0008/20
0 references