Thermomodernisation of the building of the Guardian of the TSO in Ochojno (Q2708757)

From EU Knowledge Graph
Revision as of 11:10, 4 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q2708757 in Poland
Language Label Description Also known as
English
Thermomodernisation of the building of the Guardian of the TSO in Ochojno
Project Q2708757 in Poland

    Statements

    Q2524466 (Deleted Item)
    0 references
    0 references
    239,311.57 zloty
    0 references
    53,198.96 Euro
    0.2223 Euro
    0 references
    398,852.63 zloty
    0 references
    88,664.94 Euro
    0.2223 Euro
    0 references
    60.0 percent
    0 references
    1 April 2019
    0 references
    31 October 2020
    0 references
    GMINA ŚWIĄTNIKI GÓRNE
    0 references

    49°56'4.6"N, 19°57'9.0"E
    0 references
    Przedmiotem niniejszego projektu jest termomodernizacja obiektu pełniącego znaczącą funkcję społeczną na terenie Gminy Świątniki Górne jakim jest Strażnica OSP w miejscowości Ochojno. Zakres rzeczowy projektu obejmuje jeden budynek użyteczności publicznej przeznaczonych do termomodernizacji, w którym planuje się : Ocieplenie stropodachu płytami z wełny skalnej oraz wykonanie nowego pokrycia membrany PCV, remont instalacji odgromowej na połaci dachu, montaż nowych rynien i remont rur spustowych. Wykonanie ocieplenia ścian fundamentowych do głębokości 1 m ppt. styropianem XPS wraz z zabezpieczeniem folią kubełkową. Wymiana bram garażowych, stolarki okiennej przyziemia, drzwi wejściowych oraz okna nad drzwiami, ocieplenie ścian zewnętrznych budynku oraz wykonanie elewacji metodą lekką mokrą. Wykończenie płytkami gresowymi schodów zewnętrznych i istniejącego tarasu, wykonanie nowych balustrad i poręczy, wykonanie nowego frontu ogrodzenia oraz bramy i furtki, wykonanie nowej nawierzchni z kostki brukowej na placu przed budynkiem, montażem nowych opraw oświetleniowych na elewacji budynku, wykończeniem tynkiem murków betonowych, ociepleniem kominów wykonaniem nowych ich okuć.Szczegółowy zakres rzeczowoilościowy robót koniecznych do wykonania w celu zwiększenia efektywności energetycznej obiektów i osiągnięcia jak najlepszych wskaźników określony został w audycie energetycznym budynku. (Polish)
    0 references
    The subject of this project is the thermomodernisation of the facility which performs a significant social function in the commune of the Upper Shrine, which is the Guardian of the TSO in Ochojno. The material scope of the project consists of one public utility building for thermal renovation, in which it is planned to: Warming of the terrain with rock wool panels and the implementation of a new PVC membrane covering, renovation of lightning system on the roof, installation of new gutters and renovation of drain pipes. Insulation of foundation walls up to a depth of 1 m ppt. with XPS styrofoam together with a bucket film protection. Replacement of garage doors, ground window joinery, entrance doors and windows above the door, warming the exterior walls of the building and making the facade using light wet method. Finishing with tiles of exterior stairs and existing terrace, making new railings and handrails, making a new front fence and gates and gates, making a new pavement of pavement on the square in front of the building, installation of new lighting fixtures on the facade of the building, finishing with plaster of concrete walls, warming of chimneys with new fittings. Detailed quantitative scope of works necessary to increase the energy efficiency of the buildings and achieve the best indicators are defined in the energy audit of the building. (English)
    7 July 2021
    0 references
    L’objet de ce projet est la thermomodernisation de l’installation qui remplit une fonction sociale importante dans la commune du sanctuaire supérieur, qui est le gardien du GRT à Ochojno. Le champ d’application matériel du projet consiste en un bâtiment d’utilité publique pour la rénovation thermique, dans lequel il est prévu: Le réchauffement du terrain avec des panneaux de laine de roche et la mise en œuvre d’un nouveau revêtement de membrane en PVC, la rénovation du système de foudre sur le toit, l’installation de nouvelles gouttières et la rénovation des tuyaux de drainage. Isolation des murs de fondation jusqu’à une profondeur de 1 m ppt. avec styrofoam XPS ainsi qu’une protection contre le film de seau. Remplacement des portes de garage, menuiserie des fenêtres au sol, portes d’entrée et fenêtres au-dessus de la porte, chauffage des murs extérieurs du bâtiment et réalisation de la façade par voie humide. Finition avec des tuiles d’escaliers extérieurs et terrasse existante, faire de nouvelles garde-corps et mains courantes, faire une nouvelle clôture avant et des portes et portails, faire un nouveau trottoir de chaussée sur le carré devant le bâtiment, installation de nouveaux luminaires sur la façade du bâtiment, finition avec plâtre de murs en béton, chauffage des cheminées avec de nouveaux raccords. (French)
    4 December 2021
    0 references

    Identifiers

    RPMP.04.03.01-12-0191/19
    0 references