Improvement of the energy efficiency of the company through thermomodernisation of the production and storage hall, exchange of heat sources and the use of RES. (Q2708742)
Jump to navigation
Jump to search
Project Q2708742 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Improvement of the energy efficiency of the company through thermomodernisation of the production and storage hall, exchange of heat sources and the use of RES. |
Project Q2708742 in Poland |
Statements
Q2524466 (Deleted Item)
0 references
548,074.13 zloty
0 references
685,092.66 zloty
0 references
80.0 percent
0 references
1 September 2020
0 references
31 August 2022
0 references
PRZEDSIĘBIORSTWO PRODUKCJI HANDLU I USŁUG M8
0 references
Przedmiotem projektu jest poprawa efektywności energetycznej przedsiębiorstwa. Poprawa efektywności energetycznej przedsiębiorstwa nastąpi w wyniku zrealizowania następujących działań: głębokiej termomodernizacji posiadanych budynków wymianie źródeł ciepła modernizacji oświetleniaGłęboka termomodernizacja dotyczyć będzie budynku hali produkcyjnej i magazynowej a jej zakres został określony w ramach wykonanego audytu efektywności energetycznej. W ramach tego etapu przewiduje się wykonanie robót budowlanych w zakresie docieplenia dachu, stropu wewnętrznego ścian zewnętrznych, drzwi zewnętrznych, świetlików, luksferów i okien zewnętrznych.Modernizacja źródeł ciepła polegać będzie na ich wymianę z istniejących źródeł ciepła na paliwo węglowe na źródła ciepła z wykorzystaniem paliwa płynnego w postaci gazu w celu osiągnięcia efektu prooszczędnościowego w zakresie energii finalnej i pierwotnej w przedsiębiorstwie oraz redukcji emisji zanieczyszczeń powietrza. Modernizacja oświetlenia polegać będzie na wymianie istniejących opraw i źródeł typu świetlówka na oświetlenie LED, co pozwoli także na zmniejszenie zużycia energii. Ponadto w ramach planowanego projektu wykonana zostanie instalacja paneli fotowoltaicznych co umożliwi produkcję energii elektrycznej na potrzeby przedsiębiorstwa i pozwoli na zmniejszenie zapotrzebowania na pobór mocy z sieci elektroenergetycznej. W ramach projektu wykonana zostanie także instalacja inteligentnych systemów zarządzania energią. (Polish)
0 references
The aim of the project is to improve the energy efficiency of the company. The energy efficiency of the company will be improved as a result of the following actions: deep thermomodernisation of existing buildings replacing heat sources of lighting modernisationThe deep thermomodernisation will concern the building of the production and storage hall and its scope has been defined as part of the energy efficiency audit. As part of this phase, construction works are planned for roof warming, internal ceiling of external walls, exterior doors, skylights, luxuries and external windows.Modernisation of heat sources will consist of their replacement from existing heat sources to carbon fuel to heat sources using liquid fuel in the form of gas in order to achieve a pro-efficiency effect in terms of final and primary energy in the company and to reduce emissions of air pollutants. Modernisation of lighting will consist of replacing existing luminaires and fluorescent sources with LED lighting, which will also reduce energy consumption. In addition, the planned project will install photovoltaic panels which will enable the production of electricity for the company and reduce the demand for power consumption from the electricity grid. The project will also install intelligent energy management systems. (English)
7 July 2021
0 references
L’objectif du projet est d’améliorer l’efficacité énergétique de l’entreprise. L’efficacité énergétique de l’entreprise sera améliorée grâce aux actions suivantes: thermomodernisation profonde des bâtiments existants remplaçant les sources de chaleur de modernisation de l’éclairageLa thermomodernisation profonde concernera la construction de la salle de production et de stockage et son champ d’application a été défini dans le cadre de l’audit d’efficacité énergétique. Dans le cadre de cette phase, des travaux de construction sont prévus pour le réchauffement du toit, le plafond intérieur des murs extérieurs, les portes extérieures, les puits de lumière, les luxuries et les fenêtres extérieures.La modernisation des sources de chaleur consistera en leur remplacement des sources de chaleur existantes au combustible carbone par des sources de chaleur utilisant des combustibles liquides sous forme de gaz afin d’obtenir un effet d’efficacité en termes d’énergie finale et primaire dans l’entreprise et de réduire les émissions de polluants atmosphériques. La modernisation de l’éclairage consistera à remplacer les luminaires existants et les sources fluorescentes par un éclairage LED, ce qui réduira également la consommation d’énergie. En outre, le projet prévu installera des panneaux photovoltaïques qui permettront à l’entreprise de produire de l’électricité et de réduire la demande d’électricité provenant du réseau électrique. Le projet installera également des systèmes intelligents de gestion de l’énergie. (French)
4 December 2021
0 references
Identifiers
RPMP.04.02.00-12-0465/18
0 references