Construction of photovoltaic installations for own needs of municipal facilities in Radziów Municipality (Q2711184)
Jump to navigation
Jump to search
Project Q2711184 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of photovoltaic installations for own needs of municipal facilities in Radziów Municipality |
Project Q2711184 in Poland |
Statements
608,194.02 zloty
0 references
810,925.39 zloty
0 references
75.0 percent
0 references
27 May 2019
0 references
30 June 2021
0 references
GMINA RADZIŁÓW
0 references
Projekt dotyczy montażu instalacji fotowoltaicznych na budynkach stacji uzdatniania wody, oczyszczali ścieków i domu pomocy w gminie Radziłów. Projekt zakłada dostawę i montaż kompletnych zestawów fotowoltaicznych oraz wpięcie ich w istniejące systemy instalacji. Założeniem jest, aby urządzenia spełniały wszystkie normy jakościowe oraz stanowiły instalacje długotrwałe, bezpieczne i bezawaryjne. Wytworzona energia elektryczna z nowych instalacji OZE, w całości będzie przeznaczona na potrzeby własne. Projekt posiada dwie grupy celów: kwantyfikowane cele bezpośrednie i cele o wymiarze społecznym, gospodarczym i środowiskowym (trudne do kwantyfikacji). Celami bezpośrednimi projektu są: wzrost produkcji energii z OZE i redukcja emisji CO2. Projekt obejmuje zadania: Zadanie 1. Zakup i montaż 5 instalacji fotowoltaicznych (Zakup i montaż 5 instalacji fotowoltaicznych na potrzeby: oczyszczalni ścieków Klimaszewnica, oczyszczalnii Łoje Awissa, stacji uzdatniania wody Radziłów, Hydroforni Łoje Awissa, Domu Pomocy Spolecznej w Mścichach). Zadanie 2. Nadzór inwestorski. Beneficjentem Projektu i Wnioskodawcą jest Gmina Radziłów, która jako jednostka samorządu terytorialnego jest kwalifikowana do wsparcia w ramach Działania 5.1. RPO WP. Beneficjenci ostateczni projektu to mieszkańcy gminy, użytkownicy obiektów w których zostaną zainstalowane urządzenia. Wskaźniki projektu: - Liczba wybudowanych jednostek wytwarzania energii elektrycznej z OZE – 5 szt. - Dodatkowa zdolność wytwarzania energii ze źródeł odnawialnych – 0,08 MW - Szacowany roczny spadek emisji gazów cieplarnianych - 61,72 Mg/ rok. CO2/rok - Produkcja energii elektrycznej z nowo wybudowanych instalacji wykorzystujących OZE – 76,00 MWh/rok (Polish)
0 references
The project concerns the installation of photovoltaic installations on the buildings of water treatment stations, wastewater treatment and a help house in the municipality of Radziów. The project involves the delivery and assembly of complete photovoltaic kits and their integration into existing systems of installation. The premise is that the equipment meets all quality standards and constitutes long-lasting, safe and trouble-free installations. The electricity generated from new RES installations will be entirely dedicated to own consumption. The project has two objectives: quantified direct and social, economic and environmental objectives (difficult to quantify). The direct objectives of the project are: increase of energy production from RES and reduction of CO2 emissions. The project includes the following tasks: Activity 1. Purchase and installation of 5 photovoltaic installations (Purchase and installation of 5 photovoltaic installations for: wastewater treatment plant Klimaszewnica, wastewater treatment plant Awissa, Radziów water treatment plant, hydrophore sews Awissa, Societal Aid House in Mścichy). Task 2. Investor supervision. The beneficiary of the Project and the Applicant is the Municipality of Radziów, which, as a local authority, is eligible for support under Measure 5.1. ROP PP The final beneficiaries of the project are residents of the municipality, users of the facilities where the equipment will be installed. Project indicators: — Number of RES electricity generation units built – 5 pcs. — Additional renewable energy generation capacity – 0.08 MW – Estimated annual reduction in greenhouse gas emissions – 61.72 Mg/year. CO2/year – Electricity production from newly built RES installations – 76,00 MWh/year (English)
8 July 2021
0 references
Le projet concerne l’installation d’installations photovoltaïques sur les bâtiments de stations d’épuration des eaux usées, de traitement des eaux usées et d’une maison d’assistance dans la municipalité de Radziów. Le projet comprend la livraison et l’assemblage de kits photovoltaïques complets et leur intégration dans les systèmes d’installation existants. La prémisse est que l’équipement répond à toutes les normes de qualité et constitue des installations durables, sûres et sans problèmes. L’électricité produite à partir des nouvelles installations SER sera entièrement consacrée à l’autoconsommation. Le projet poursuit deux objectifs: objectifs chiffrés directs et sociaux, économiques et environnementaux (difficile à quantifier). Les objectifs directs du projet sont les suivants: augmentation de la production d’énergie à partir des sources d’énergie renouvelables et réduction des émissions de CO2. Le projet comprend les tâches suivantes: Activité 1. Achat et installation de 5 installations photovoltaïques (Achat et installation de 5 installations photovoltaïques pour: station d’épuration des eaux usées Klimaszewnica, station d’épuration des eaux usées Awissa, station de traitement des eaux de Radziów, hydrophore sews Awissa, Societal Aid House à Mścichy). Tâche 2. Surveillance des investisseurs. Le bénéficiaire du projet et la requérante sont la municipalité de Radziów, qui, en tant qu’autorité locale, peut bénéficier d’un soutien au titre de la mesure 5.1. ROP PP Les bénéficiaires finaux du projet sont les résidents de la municipalité, les utilisateurs des installations où l’équipement sera installé. Indicateurs de projet: — Nombre d’unités de production d’électricité SER construites — 5 pièces. — Capacité supplémentaire de production d’énergie renouvelable — 0,08 MW — Réduction annuelle estimée des émissions de gaz à effet de serre — 61,72 Mg/an. CO2/an — Production d’électricité provenant d’installations SER nouvellement construites — 76,00 MWh/an (French)
4 December 2021
0 references
Identifiers
RPPD.05.01.00-20-0590/19
0 references