Continuation of thermomodernisation works with installation of the RES system in Pizzeria “Italian Smak” Maria Kozaczek (Q2709497)

From EU Knowledge Graph
Revision as of 10:59, 4 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q2709497 in Poland
Language Label Description Also known as
English
Continuation of thermomodernisation works with installation of the RES system in Pizzeria “Italian Smak” Maria Kozaczek
Project Q2709497 in Poland

    Statements

    0 references
    0 references
    213,693.03 zloty
    0 references
    47,503.96 Euro
    0.2223 Euro
    0 references
    475,931.07 zloty
    0 references
    105,799.48 Euro
    0.2223 Euro
    0 references
    44.9 percent
    0 references
    1 October 2020
    0 references
    31 December 2022
    0 references
    KOZACZEK MARIA PIZZERIA "WŁOSKI SMAK"
    0 references
    0 references

    50°19'1.6"N, 17°23'0.2"E
    0 references
    Przedmiotem projektu jest termomodernizacja budynku restauracji wraz z zastosowaniem instalacji fotowoltaicznej do produkcji energii elektrycznej na potrzeby własne przedsiębiorstwa Wnioskodawcy. Zgodnie z audytem energetycznym na podstawie dokonanej oceny jako optymalny wariant przedsięwzięcia termomodernizacyjnego w rozpatrywanym budynku ocenia się wariant obejmujący usprawnienia: modernizacje układu wytwarzania CO, modernizacje układu wytwarzania c.w.u., docieplenie ścian zewnętrznych warstwą wełny, docieplenie stropodachów warstwą wełny,wymianę stolarki okiennej,wymianę stolarki drzwiowej. W ramach projektu zgodnie z audytem energetycznym przewiduje się zastosowanie instalacji fotowoltaicznej do produkcji energii elektrycznej. Energia elektryczna z odnawialnych źródeł energii będzie służyła na bieżące potrzeby restauracji. Wnioskodawca zaplanował na zakończenie przedmiotowego projektu wykonanie audytu energetycznego ex post, stanowiącego ocenę zgodności stanu osiągniętego w wyniku realizacji projektu ze stanem przedstawiony w audycie energetycznym ex ante, stanowiącym załącznik do przedmiotowego wniosku o dofinansowanie. Bezpośrednimi produktami realizowanego projektu będą: Liczba przedsiębiorstw, które w wyniku wsparcia poprawiły efektywność energetyczną – 1 szt.; Liczba zmodernizowanych energetycznie budynków – 1 szt.; Liczba wybudowanych jednostek wytwarzania energii elektrycznej z OZE – 1 szt.; Liczba wybudowanych jednostek wytwarzania energii cieplnej z OZE – 1 szt.; Powierzchnia użytkowa budynków poddanych termomodernizacji – 484,39 m2. Pozostałe niewykazane wskaźniki obligatoryjne przyjmują wartość równą zero. (Polish)
    0 references
    The object of the project is the thermomodernisation of the restaurant building with the use of photovoltaic installations for the production of electricity for the Applicant’s own needs. According to the energy audit, on the basis of the assessment made as an optimal option for the thermal modernisation project in the building concerned, the option including improvements is assessed: modernisation of the CO production system, modernisation of the production system of hot water, warming of external walls with a layer of wool, warming of the reeds with a layer of wool,replacement of window joinery,replacement of door joinery. In accordance with the energy audit, the project envisages the use of photovoltaic installations for the production of electricity. Electricity from renewable energy sources will serve the current needs of the restaurant. At the end of the project, the applicant planned to carry out an ex-post energy audit, assessing the compliance of the state achieved as a result of the project’s implementation with the state set out in the ex ante energy audit annexed to the application for funding in question. The direct products of the project will be: Number of companies that have improved energy efficiency as a result of the support – 1 item; Number of energy-modified buildings – 1; Number of RES-generating units built – 1 unit; Number of RES heat generation units built – 1 unit; Usable area of buildings subjected to thermal modernisation – 484,39 m². Other mandatory indices not reported are equal to zero. (English)
    7 July 2021
    0 references
    L’objet du projet est la thermomodernisation du bâtiment de restauration avec l’utilisation d’installations photovoltaïques pour la production d’électricité pour les besoins propres de la requérante. Selon l’audit énergétique, sur la base de l’évaluation effectuée en tant qu’option optimale pour le projet de modernisation thermique dans le bâtiment concerné, l’option, y compris les améliorations, est évaluée: modernisation du système de production de CO, modernisation du système de production d’eau chaude, réchauffement des murs extérieurs avec une couche de laine, réchauffement des roseaux avec une couche de laine, remplacement de la menuiserie des fenêtres, remplacement de la menuiserie de porte. Conformément à l’audit énergétique, le projet envisage l’utilisation d’installations photovoltaïques pour la production d’électricité. L’électricité produite à partir de sources d’énergie renouvelables répondra aux besoins actuels du restaurant. À la fin du projet, la requérante envisageait d’effectuer un audit énergétique ex post, en évaluant la conformité de l’état obtenu à la suite de la mise en œuvre du projet avec l’état indiqué dans l’audit énergétique ex ante annexé à la demande de financement en question. Les produits directs du projet seront les suivants: Nombre d’entreprises ayant amélioré l’efficacité énergétique grâce au soutien — 1 poste; Nombre de bâtiments modifiés par l’énergie — 1; Nombre d’unités génératrices de SER construites — 1 unité; Nombre d’unités de production de chaleur SER construites — 1 unité; Surface utilisable des bâtiments soumis à la modernisation thermique — 484,39 m². Les autres indices obligatoires non déclarés sont égaux à zéro. (French)
    4 December 2021
    0 references

    Identifiers

    RPOP.03.04.00-16-0005/20
    0 references