104,884.6 zloty
0 references
131,105.75 zloty
0 references
80.0 percent
0 references
7 May 2019
0 references
24 September 2020
0 references
MIASTO SEJNY
0 references
Przedmiotem opracowania jest budowa instalacji fotowoltaicznej (PV) on-grid o mocy min. 27,54 kWp, służącej do produkcji energii elektrycznej z promieniowania słonecznego na potrzeby Szkoły Podstawowej im. Mjr. Henryka Dobrzańskiego "Hubala" w Sejnach. Zakres planowanych prac obejmuje: - montaż systemowej konstrukcji mocującej na dachu skośnym pod panele fotowoltaiczne; - montaż modułów fotowoltaicznych monokrystalicznych – maksymalnie 81 sztuk; - montaż inwertera fotowoltaicznego w optymalnym miejscu - 1 sztuka; - montaż optymalizatorów mocy – 81 szt; - podłączenie strony DC do inwertera fotowoltaicznego oraz przeprowadzenie odpowiednich pomiarów elektrycznych stringów; - podłączenie strony AC do istniejącej rozdzielni w obiekcie. Ponadto w ramach projektu założono wydatki na promocję projektu (koszt niekwalifikowany), nadzór inwestorski oraz opracowanie dokumentacji technicznej. Celem projektu jest zwiększenie ilości energii z odnawialnych źródeł oraz rozproszenie produkcji energii na terenie Miasta Sejny. Planowana inwestycja umożliwi: - pozytywne oddziaływanie na środowisko na skutek ograniczenia emisji zanieczyszczeń do atmosfery związanych z tworzeniem energii elektrycznej w elektrowni; - zmniejszenie kosztów rachunków za energię elektryczną; - rozproszenie produkcji energii; - zwiększenie ilości wyprodukowanej energii z odnawialnych źródeł. Inwestycja przyczynia się do osiągnięcia następujących wskaźników: 1) produktu: -Liczba wybudowanych jednostek wytwarzania energii elektrycznej z OZE – 1 szt. -Dodatkowa zdolność wytwarzania energii ze źródeł odnawialnych - 0,03 MWe; -Szacowany roczny spadek emisji gazów cieplarnianych – 21,24 ton równoważnika CO2; 2) rezultatu: -Produkcja energii elektrycznej z nowo wybudowanych instalacji wykorzystujących OZE – 26,163 MWhe. Energia z OZE wyprodukowana w ramach projektu będzie wykorzystywana głównie na własne potrzeby. (Polish)
0 references
The subject of the study is the construction of an on-grid photovoltaic (PV) installation with a capacity of at least 27.54 kWp, for the production of electricity from solar radiation for the purposes of the Mjr Primary School. Henryk Dobrzański “Hubala” in Sejny. The scope of the planned work includes: — installation of a system mounting structure on the slanted roof for photovoltaic panels; — installation of monocrystalline photovoltaic modules – maximum 81 pieces; — installation of photovoltaic inverter in an optimal place – 1 piece; — installation of power optimisers – 81 pcs; — connecting the DC page to the photovoltaic inverter and carrying out appropriate measurements of electric thongs; — connect the AC page to the existing switchboard in the object. In addition, the project assumed expenditure for the promotion of the project (ineligible cost), investor supervision and the preparation of technical documentation. The aim of the project is to increase the amount of energy from renewable sources and to disperse energy production in the City of Sejny. The planned investment will enable: — the positive impact on the environment as a result of reducing emissions of pollutants into the atmosphere associated with the generation of electricity in the power plant; — reducing the cost of electricity bills; — dispersal of energy production; — increase the amount of energy produced from renewable sources. The investment shall contribute to the achievement of the following indicators: 1)Product: —Number of built units for generating electricity from RES – 1 pcs. —Additional renewable energy generation capacity – 0.03 MWe; —Estimated annual reduction in greenhouse gas emissions – 21.24 tonnes of CO2 equivalent; 2) result: Production of electricity from newly built RES installations – 26,163 MWhe. Energy from RES produced under the project will be used mainly for own use. (English)
8 July 2021
0 references
L’étude porte sur la construction d’une installation photovoltaïque sur réseau d’une capacité d’au moins 27,54 kWc, pour la production d’électricité à partir du rayonnement solaire aux fins de l’école primaire Mjr. Henryk Dobrzański «Hubala» à Sejny. La portée des travaux prévus comprend: — installation d’une structure de montage du système sur le toit incliné pour les panneaux photovoltaïques; — installation de modules photovoltaïques monocristallins — au maximum 81 pièces; — installation de l’onduleur photovoltaïque dans un endroit optimal — 1 pièce; — installation d’optimiseurs de puissance — 81 PCs; — connecter la page DC à l’onduleur photovoltaïque et effectuer les mesures appropriées des strings électriques; — connectez la page AC au standard existant dans l’objet. En outre, le projet a pris en charge des dépenses pour la promotion du projet (coût non éligible), la supervision des investisseurs et la préparation de la documentation technique. L’objectif du projet est d’augmenter la quantité d’énergie produite à partir de sources renouvelables et de disperser la production d’énergie dans la ville de Sejny. L’investissement prévu permettra: — l’impact positif sur l’environnement résultant de la réduction des émissions de polluants dans l’atmosphère associées à la production d’électricité dans la centrale électrique; — réduire le coût des factures d’électricité; — dispersion de la production d’énergie; — augmenter la quantité d’énergie produite à partir de sources renouvelables. L’investissement contribue à la réalisation des indicateurs suivants: 1) Produit: —Nombre d’unités construites pour produire de l’électricité à partir de SER — 1 pcs. —Capacité supplémentaire de production d’énergie renouvelable — 0,03 MWe; —Réduction annuelle estimée des émissions de gaz à effet de serre — 21,24 tonnes d’équivalent CO2; 2) résultat: Production d’électricité à partir d’installations SER nouvellement construites — 26 163 MWhe. L’énergie produite à partir des sources d’énergie renouvelables produites dans le cadre du projet sera principalement utilisée à des fins propres. (French)
4 December 2021
0 references
Identifiers
RPPD.05.01.00-20-0574/19
0 references