PEDESTRIANISATION. Actions covered by the programme with_x000D_ HORIZONTE C/P and M/P related to PEATONAL MOVILITY (Q3160088)

From EU Knowledge Graph
Revision as of 10:32, 4 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q3160088 in Spain
Language Label Description Also known as
English
PEDESTRIANISATION. Actions covered by the programme with_x000D_ HORIZONTE C/P and M/P related to PEATONAL MOVILITY
Project Q3160088 in Spain

    Statements

    0 references
    1,416,779.22 Euro
    0 references
    1,770,974.03 Euro
    0 references
    80.0 percent
    0 references
    1 January 2020
    0 references
    31 December 2022
    0 references
    AYUNTAMIENTO DE ALMERIA
    0 references

    36°50'29.11"N, 2°27'46.12"W
    0 references
    04013
    0 references
    El objetivo de la operación es el desarrollo del PLAN DE MOVILIDAD URBANA SOSTENIBLE_x000D_ DE ALMERÍA para el fomento de los desplazamientos a pie en el núcleo urbano, especialmente como modalidad preferente para los recorridos cortos; así como aumentar la calidad urbana y la habitabilidad del entorno, y de forma específica en la zona más central de la ciudad._x000D_ Todo ello encaminado a conseguir:_x000D_ - Mejorar la calidad urbana en las áreas más centrales_x000D_ - Mejorar la accesibilidad interna a la ciudad_x000D_ Para conseguir estos objetivos se plantea como Propuesta 1 la ampliación progresiva del_x000D_ espacio peatonal en el Centro Histórico, con tres tipos de intervenciones a corto, medio y largo plazo._x000D_ Esta operación desarrolla las exigencias que determina el PMUS de Almería para_x000D_ intervenciones a medio plazo (Spanish)
    0 references
    The objective of the operation is the development of the SUSTAINIBLE URBAN MOVILITY PLAN_x000D_ DE ALMERÍA for the promotion of walking trips in the urban centre, especially as a preferred modality for short trips; as well as increasing the urban quality and habitability of the environment, and specifically in the most central area of the city._x000D_ All this aimed at achieving:_x000D_ — Improving urban quality in the most central areas_x000D_ — Improving internal accessibility to the city_x000D_ To achieve these objectives, the progressive expansion of the_x000D_ pedestrian space in the Historic Centre is proposed as Proposal 1, with three types of interventions in the short, medium and long term._x000D_ This operation develops the requirements determined by the SUMP of Almería for_x000D_ medium term interventions (English)
    12 October 2021
    0 references
    L’objectif de l’opération est le développement de la Movility URBAN durable PLAN_x000D_ DE ALMERÍA pour la promotion des randonnées pédestres dans le centre urbain, en particulier en tant que modalité privilégiée pour les courts trajets; outre l’amélioration de la qualité urbaine et de l’habitabilité de l’environnement, et plus particulièrement dans la zone la plus centrale de la ville._x000D_ Tout cela visant à atteindre:_x000D_ — Améliorer la qualité urbaine dans les zones les plus centrales_x000D_ — Améliorer l’accessibilité interne à la ville_x000D_ Pour atteindre ces objectifs, l’extension progressive de l’espace piétonnier_x000D du centre historique est proposée en tant que proposition 1, avec trois types d’interventions à court, moyen et long terme._x000D_ Cette opération développe les exigences déterminées par le SUMP d’Almería pour_x000D_ à moyen terme (French)
    4 December 2021
    0 references
    Almería
    0 references

    Identifiers

    FDU02AN6504
    0 references