Thermomodernisation of public utilities in Biała Municipality (Q2702321)

From EU Knowledge Graph
Revision as of 09:14, 4 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q2702321 in Poland
Language Label Description Also known as
English
Thermomodernisation of public utilities in Biała Municipality
Project Q2702321 in Poland

    Statements

    0 references
    1,669,027.62 zloty
    0 references
    371,024.84 Euro
    0.2223 Euro
    0 references
    1,963,561.9 zloty
    0 references
    436,499.81 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    27 August 2019
    0 references
    31 December 2021
    0 references
    GMINA BIAŁA
    0 references
    0 references

    51°14'39.8"N, 18°32'48.1"E
    0 references
    Celem głównym projektu jest: Poprawa jakości powietrza w Gminie Biała poprzez termomodernizację i zwiększenie efektywności energetycznej budynków użyteczności publicznej Zadania i zakres rzeczowy projektu obejmuje prace służące głębokiej modernizacji energetycznej budynków użyteczności publicznej - budynku Strażnicy OSP ze świetlicą w Białej Rządowej oraz budynku Urzędu Gminy Biała z Gminnym Ośrodkiem Kultury i Sportu w Białej Drugiej wraz z wymianą wyposażenia tych obiektów na energooszczędne (w szczególności oświetlenia i źródła ciepła). Grupę docelową stanowią zarówno użytkownicy budynków (interesanci, pracownicy administracyjni) jak i mieszkańcy Gminy Biała oraz terenów pobliskich woj. łódzkiego. Efekty realizacji projektu: Produkty: - Liczba zmodernizowanych energetycznie budynków: 2 szt. - Powierzchnia użytkowa budynków poddanych termomodernizacji: 2 800,34 m2 - Liczba zmodernizowanych źródeł ciepła: 2 szt. Rezultaty: - Szacowany roczny spadek emisji gazów cieplarnianych (CI34): 292,98 t równoważnika CO2/rok - Zmniejszenie rocznego zużycia energii pierwotnej w budynkach publicznych (CI32): 925 201,20 kWh/rok - Zmniejszenie zużycia energii końcowej w wyniku realizacji projektów: 1 658,32 [GJ/rok] - ilość zaoszczędzonej energii cieplnej: 1 537,03 [GJ/rok] - ilość zaoszczędzonej energii elektrycznej: 33,69 [MWh/rok] Zastosowano mechanizmy uwzględniające wszystkich użytkowników zgodnie z zasadami projektowania uniwersalnego. (Polish)
    0 references
    The main objective of the project is: Improvement of air quality in the municipality of Biała through thermomodernisation and energy efficiency of public buildings The tasks and material scope of the project include works aimed at deep energy modernisation of public buildings – the OSP Guard building with a day-care centre in White Government and the building of the Biała Municipality Office with the Municipal Centre for Culture and Sport in Biała Second, together with the replacement of the equipment of these facilities with energy-efficient (in particular lighting and heat sources). The target group consists of both users of buildings (interests, administrative staff) as well as residents of the municipality of Biała and the surrounding areas of the Łódź Voivodeship. Project results: Products: — Number of energy-modified buildings: 2 pcs. — Usable area of buildings which have undergone thermomodernisation: 2800,34 m² – Number of modernised heat generators: 2 pcs. Results: — Estimated annual decrease in greenhouse gas emissions (CI34): 292,98 t CO2-equivalent/year – Reduction of annual primary energy consumption in public buildings (CI32): 925201,20 kWh/year – Reduction of final energy consumption as a result of projects: 1 658,32 [GJ/year] – amount of thermal energy saved: 1 537,03 [GJ/year] – amount of electricity saved: 33,69 [MWh/year] Mechanisms have been applied that include all users in accordance with the principles of universal design. (English)
    7 July 2021
    0 references
    L’objectif principal du projet est de: Amélioration de la qualité de l’air dans la municipalité de Biała grâce à la thermomodernisation et à l’efficacité énergétique des bâtiments publics Les tâches et le champ d’application matériel du projet comprennent des travaux visant la modernisation énergétique profonde des bâtiments publics — le bâtiment OSP Guard avec une garderie dans le gouvernement blanc et la construction du bureau de la municipalité de Biała avec le centre municipal de la culture et du sport à Biała Deuxièmement, ainsi que le remplacement de l’équipement de ces installations par une efficacité énergétique (en particulier l’éclairage et les sources de chaleur). Le groupe cible est composé à la fois d’utilisateurs de bâtiments (intérêts, personnel administratif) ainsi que de résidents de la commune de Biała et des environs de la voïvodie de Łódź. Résultats du projet: Produits: — Nombre de bâtiments modifiés par l’énergie: 2 pièces. — Surface utilisable des bâtiments ayant fait l’objet d’une thermomodernisation: 2 800,34 m² — Nombre de générateurs de chaleur modernisés: 2 pièces. Résultats: — Diminution annuelle estimée des émissions de gaz à effet de serre (CI34): 292,98 t équivalent CO2/an — Réduction de la consommation annuelle d’énergie primaire dans les bâtiments publics (CI32): 925 201,20 kWh/an — Réduction de la consommation finale d’énergie à la suite de projets: 1 658,32 [GJ/an] — quantité d’énergie thermique économisée: 1 537,03 [GJ/an] — quantité d’électricité économisée: 33,69 [MWh/an] Des mécanismes ont été appliqués à tous les utilisateurs conformément aux principes de la conception universelle. (French)
    4 December 2021
    0 references

    Identifiers

    RPLD.04.02.02-10-0047/19
    0 references