Construction of a photovoltaic installation up to 1 MW with the necessary infrastructure in Grabów (Q2699830)

From EU Knowledge Graph
Revision as of 09:08, 4 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q2699830 in Poland
Language Label Description Also known as
English
Construction of a photovoltaic installation up to 1 MW with the necessary infrastructure in Grabów
Project Q2699830 in Poland

    Statements

    0 references
    1,870,749.99 zloty
    0 references
    415,867.72 Euro
    0.2223 Euro
    0 references
    2,337,917.42 zloty
    0 references
    519,719.04 Euro
    0.2223 Euro
    0 references
    80.02 percent
    0 references
    10 August 2017
    0 references
    30 June 2021
    0 references
    POWER SOL SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references

    51°40'28.6"N, 14°49'52.3"E
    0 references
    Inwestycja polega na budowie instalacji fotowoltaicznej o maksymalnej mocy do 1MW (998,40 kWp) wraz z infrastrukturą towarzyszącą. Wyprodukowana energia elektryczna będzie dostarczana do sieci elektroenergetycznej, zgodnie z warunkami technicznymi przyłączenia do sieci elektroenergetycznej. Podstawowym celem projektu jest zwiększenie udziału energii elektrycznej pochodzącej z OZE oraz zwiększenie bezpieczeństwa energetycznego, redukcja emisji gazów cieplarnianych. Aby tego dokonać niezbędne jest wykonanie następujących działań: Zadanie nr 1 Projekt Wykonawczy. Zadanie nr 2 Budowa instalacji fotowoltaicznej. Zadanie nr 3 Promocja projektu. Zadanie nr 4 SW. Zadanie nr 5 TIK Zadanie nr 6 Projekt Budowlany Projekt zrealizuje następujące wskaźniki: 1.Liczba wybud. jed. wytwarzania e.e. z OZE 1 szt. 2.Liczba przedsięb. otrzymujących wsparcie 1 przedsięb. 3.Dod. zdolność wytwarzania e.e. ze źródeł odnawialnych - 0,99 MWe 4.Szacowany roczny spadek emisji gazów cieplarnianych 785,87 Tony równoważnika CO2 5.Liczba podmiotów wykorzystujących TIK 1 szt. 6.Produkcja e.e.z nowo wybudowanych instalacji wykorzystujących OZE - 1007,48 MWhe/rok. 7.Wzrost zatrud. we wspieranych przedsięb. O/K/M (CI 8) - 1 ECP. 8.Wzrost zatrud. we wspieranych przedsięb. – mężczyźni 1 EPC, 9.Wzrost zatrud. we wspieranych przedsięb. – kobiety 0 EPC, 10.Długość nowo wybudowanych sieci elektroenergetycznych dla OZE - 0.17 km 11.Długość zmodernizowanych sieci elektroenergetycznych dla odnawialnych źródeł energii 0 km, Grupę odbiorców projektu stanowić będą: osoby fizyczne – ogół społeczeństwa mieszkańcy Miejscowości i Gminy, podmioty gospodarcze i instytucje oraz Wnioskodawca. Inwestycja przewiduje wybudowanie na działkach nr 80/1, 81/1, obręb 0006 znajdujących się w miejscowości Grabów w gminie Tuplice instalacji fotowoltaicznej o mocy zainstalowanej 998,4 kWp (3328 szt. paneli) wraz z niezbędną infrastrukturą. Głównym założeniem projektu jest produkcja energii elektrycznej z OZE oraz sprzedaż energii. (Polish)
    0 references
    The investment consists of the construction of a photovoltaic installation with a maximum capacity of up to 1 MW (998,40 kWp) together with accompanying infrastructure. The electricity produced will be supplied to the electricity grid, in accordance with the technical conditions for connection to the electricity grid. The main objective of the project is to increase the share of electricity from RES and to increase energy security, reduce greenhouse gas emissions. In order to do so, it is necessary to carry out the following actions: Activity 1 Executive project. Task No. 2 Construction of a photovoltaic installation. Task 3 Promotion of the project. Task 4 SW. Task no. 5 ICT Task No. 6 Construction project will implement the following indicators: 1.Number of construction of the production of e.e. from RES 1 pcs. 2.Number of enterprises receiving support from 1 enterprise. 3.Dod. e.e. renewable generation capacity – 0.99 MWe 4.Estimated annual reduction in greenhouse gas emissions 785.87 Tons of CO2 equivalent 5.Number of entities using ICT 1 pcs. 6.Production e.e. from newly built RES installations – 1007.48 MWhe/year. 7.Increase in the supported enterprise. O/K/M (CI 8) – 1 ECP. 8.Increase in the supported enterprise. — men 1 FTE, 9.Increase in the supported enterprise. — women 0 FTE, 10.Length of newly built power grids for RES – 0.17 km 11.Length of upgraded electricity grids for renewable energy sources 0 km, The group of project customers will be: individuals – the general public residents of the City and Municipality, economic operators and institutions and the Applicant. The investment provides for the construction of a photovoltaic installation with an installed capacity of 998,4 kWp (3328 panels) on plots No 80/1, 81/1 (3328 panels) in the municipality of Tuplice. The main objective of the project is the production of electricity from RES and the sale of energy. (English)
    7 July 2021
    0 references
    L’investissement consiste en la construction d’une installation photovoltaïque d’une capacité maximale de 1 MW (998,40 kWc) ainsi que des infrastructures d’accompagnement. L’électricité produite sera fournie au réseau électrique, conformément aux conditions techniques de raccordement au réseau électrique. L’objectif principal du projet est d’augmenter la part de l’électricité produite à partir de sources d’énergie renouvelables et d’accroître la sécurité énergétique et de réduire les émissions de gaz à effet de serre. Pour ce faire, il est nécessaire de mener les actions suivantes: Activité 1 Projet exécutif. Tâche no 2 Construction d’une installation photovoltaïque. Tâche 3 Promotion du projet. Tâche 4 SW. Tâche no 5 TIC Tâche no 6 Projet de construction mettra en œuvre les indicateurs suivants: 1.Nombre de construction de la production de e.e. à partir de RES 1 pcs. 2.Nombre d’entreprises recevant le soutien d’une entreprise. 3.Dod. c.-à-d. capacité de production d’énergie renouvelable — 0,99 MWe 4.Réduction annuelle estimée des émissions de gaz à effet de serre 785,87 tonnes d’équivalent CO2. Nombre d’entités utilisant les TIC 1 PC. 6.Production, par exemple, provenant d’installations SER nouvellement construites — 1007,48 MWhe/an. 7. Augmentation de l’entreprise soutenue. O/K/M (CI 8) — 1 PCE. 8. Augmentation de l’entreprise soutenue. — hommes 1 ETP, 9. Augmentation de l’entreprise soutenue. — femmes 0 ETP, 10.Longueur des réseaux électriques nouvellement construits pour les SER — 0,17 km 11.Longueur des réseaux d’électricité modernisés pour les sources d’énergie renouvelables 0 km, Le groupe de clients du projet sera: les particuliers — les résidents du grand public de la ville et de la municipalité, les opérateurs économiques et les institutions et la requérante. L’investissement prévoit la construction d’une installation photovoltaïque d’une capacité installée de 998,4 kWp (3328 panneaux) sur les parcelles nos 80/1, 81/1 (3328 panneaux) dans la commune de Tuplice. L’objectif principal du projet est la production d’électricité à partir de sources d’énergie renouvelables et la vente d’énergie. (French)
    4 December 2021
    0 references

    Identifiers

    RPLB.03.01.00-08-0139/19
    0 references