Reconstruction of rainwater drainage and associated infrastructure in Nowogrodziec (Q2698561)

From EU Knowledge Graph
Revision as of 08:49, 4 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q2698561 in Poland
Language Label Description Also known as
English
Reconstruction of rainwater drainage and associated infrastructure in Nowogrodziec
Project Q2698561 in Poland

    Statements

    0 references
    1,770,591.2 zloty
    0 references
    393,602.42 Euro
    0.2223 Euro
    0 references
    2,083,048.46 zloty
    0 references
    463,061.67 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    21 November 2014
    0 references
    30 November 2020
    0 references
    GMINA NOWOGRODZIEC
    0 references
    0 references

    51°11'49.6"N, 15°23'55.3"E
    0 references
    Projekt polega na poprawie bezpieczeństwa przeciwpowodziowego mieszkańców Nowogrodźca przez dostosowanie infrastruktury odbierającej i służącej zagospodarowaniu wód opadowych. W ramach projektu przewiduje się dostosowanie istniejącej infrastruktury do wymogów technicznych oraz do coraz częściej odnotowywanych negatywnych skutków ekstremalnych warunków pogodowych (gwałtowne opady i nawałnice). W ramach działań w projekcie przewidziano: •przygotowanie dokumentacji projektowej, •wykonanie prac w zakresie robót budowlanych - przebudowa starego odcinka sieci kanalizacyjnej, budowa nowego odcinka kanalizacji deszczowej, budowa zbiornika retencyjnego, przełączenie istniejących kolektorów kanalizacyjnych, W projekcie wystąpią koszty pośrednie. Inwestycje objęte projektem stanowią element szerszej koncepcji związanej z polityką ochrony środowiska i bezpieczeństwa przeciwpowodziowego Gminy Nowogrodziec. Obejmują bowiem działania infrastrukturalne, które stanowić będą ważny element w poprawie bezpieczeństwa w Nowogrodźcu – przyczynią się do ograniczenia sytuacji kryzysowych związanych z brakiem możliwości właściwego odbioru wód opadowych. Wyboru wariantu dokonano na podstawie analizy strategicznej oraz analizy rozwiązań technologicznych (analiza efektywności kosztowej). Projekt realizowany będzie przez Gminę Nowogrodziec. Pracownicy Gminy Nowogrodziec posiadają wieloletnie doświadczenie w realizacji projektów współfinansowanych ze środków zewnętrznych krajowych i zagranicznych, co zagwarantuje sprawne przeprowadzenie wszystkich procedur zgodnie z przepisami. Ponadto uczestniczyli oni w szkoleniach, dotyczących przygotowywania, wdrażania i rozliczania projektów w ramach RPO WD 2014-2020, a ich wiedza teoretyczna poparta jest długoletnia praktyką zawodową. Operatorem infrastruktury będzie Urząd Miejski w Nowogrodźcu. (Polish)
    0 references
    The project consists of improving the flood safety of the inhabitants of Nowogrodź by adapting the receiving infrastructure and for the management of rainwater. The project envisages adapting the existing infrastructure to technical requirements and to the increasingly frequent negative effects of extreme weather conditions (severe rainfall and storms). As part of the project’s activities, the project foresees: •preparation of project documentation, •execution of works in the field of construction works – reconstruction of an old section of the sewerage network, construction of a new section of the sewage system, construction of a retention tank, switchover of existing sewerage collectors. In the project there will be indirect costs. The investments covered by the project are part of a broader concept related to environmental protection and flood safety policy of the Municipality of Nowogrodziec. They include infrastructure activities, which will be an important element in improving safety in Nowogrodziec – they will contribute to reducing the crisis situations linked to the inability to properly receive rainwater. The option was selected on the basis of a strategic analysis and an analysis of technological solutions (cost efficiency analysis). The project will be implemented by the Municipality of Nowogrodziec. The employees of the Municipality of Nowogrodziec have many years of experience in the implementation of projects co-financed by domestic and foreign funds, which will ensure that all procedures are carried out efficiently in accordance with the regulations. In addition, they participated in training courses on the preparation, implementation and accounting of projects under the ROP PP 2014-2020, and their theoretical knowledge is supported by long-standing professional practice. The infrastructure operator will be the Municipal Office in Nowogrodziec. (English)
    7 July 2021
    0 references
    Le projet consiste à améliorer la sécurité des inondations des habitants de Nowogrodź en adaptant les infrastructures de réception et pour la gestion des eaux de pluie. Le projet prévoit d’adapter l’infrastructure existante aux exigences techniques et aux effets négatifs de plus en plus fréquents des conditions météorologiques extrêmes (précipitations et tempêtes sévères). Dans le cadre des activités du projet, le projet prévoit: •la préparation de la documentation du projet, •l’exécution des travaux dans le domaine des travaux de construction — reconstruction d’un ancien tronçon du réseau d’assainissement, construction d’une nouvelle section du réseau d’égouts, construction d’un réservoir de rétention, passage des collecteurs d’égouts existants. Les investissements visés par le projet s’inscrivent dans un concept plus large lié à la politique de protection de l’environnement et de sécurité contre les inondations de la municipalité de Nowogrodziec. Elles comprennent des activités d’infrastructure, qui constitueront un élément important pour améliorer la sécurité à Nowogrodziec — elles contribueront à réduire les situations de crise liées à l’incapacité de recevoir correctement l’eau de pluie. L’option a été choisie sur la base d’une analyse stratégique et d’une analyse des solutions technologiques (analyse coût-efficacité). Le projet sera mis en œuvre par la municipalité de Nowogrodziec. Les employés de la municipalité de Nowogrodziec ont de nombreuses années d’expérience dans la mise en œuvre de projets cofinancés par des fonds nationaux et étrangers, qui garantiront que toutes les procédures sont menées efficacement conformément à la réglementation. En outre, ils ont participé à des cours de formation sur la préparation, la mise en œuvre et la comptabilité des projets relevant du PP ROP 2014-2020, et leurs connaissances théoriques sont soutenues par une pratique professionnelle de longue date. L’exploitant de l’infrastructure sera le bureau municipal de Nowogrodziec. (French)
    4 December 2021
    0 references

    Identifiers

    RPDS.04.05.01-02-0003/19
    0 references