3,499,980.0 zloty
0 references
6,363,600.0 zloty
0 references
55.0 percent
0 references
1 January 2020
0 references
31 December 2023
0 references
"ANDRO" ANNA MARIA FIJAŁKOWSKA
0 references
Celem projektu jest wdrożenie innowacyjnej technologii wytwarzania drogowych mieszanek mineralno-asfaltowych w technologii asfaltu spienionego przez dodatek zeolitów. Wykorzystane zostaną przy tym wyniki planowanych do zakupu wyników prac badawczo – rozwojowych. W skład zespołu ciągu technologicznego wchodzić będzie wytwórnia mas bitumicznych, węzeł betoniarski które zlokalizowane będą na nowo zakupionej nieruchomości niezabudowanej (koszt niekwalifikowalny) oraz oprogramowanie do kosztorysowania. W oparciu o planowane do zakupu wyniki prac B+R Wnioskodawca wprowadzi na rynek nowy produkt - mieszankę mineralno-asfaltową które w połączeniu z betonem na podbudowę dróg zapewniają odpowiednie parametry nawierzchni drogowej pod względem nośności, odporności na koleinowanie, trwałości. Głównym celem projektu jest zwiększenie konkurencyjności przedsiębiorstwa ANDRO Anna Maria Fijałkowska w skali krajowej, oparte na wdrożeniu innowacyjnej technologii wbudowania drogowych mieszanek mineralno – asfaltowych w technologii asfaltu spienionego przez dodatek zeolitów. Technologia ta wpisuje się swym zakresem w technologie produkcji mieszanek mineralno-asfaltowych na ciepło (ang. Warm Mix Asphalt), które w stosunku do rozwiązań tradycyjnych charakteryzują się obniżoną o około 20-30°C temperaturą produkcji. Projekt wpisuje się w Regionalne Inteligentne Specjalizacje (Zaawansowane Materiały Budowlane). Projekt będzie realizowany w okresie 1 stycznia 2020 r. – 31 grudnia 2023 r. w ramach trzech zadań: 1. Zakup linii produkcyjnych: wytwórni mas bitumicznych oraz węzła betoniarskiego 2. Zakup oprogramowania i infrastruktury IT 3. Zakup gotowych wyników prac B+R (Polish)
0 references
The aim of the project is to implement an innovative technology for the production of road mineral and asphalt mixtures in the technology of asphalt foamed by the addition of zeolite. In doing so, the results of the planned research and development work will be used. The technological sequence team will include a bituminous mass plant, a concrete junction that will be located on a newly purchased unbuilt property (ineligible cost) and costing software. Based on the results of the R & D works to be purchased, the Applicant will launch a new product – mineral-asphalt mix, which, in combination with concrete for road construction, provides adequate parameters of the road surface in terms of load capacity, resistance to rubbing, durability. The main goal of the project is to increase the competitiveness of ANDRO Anna Maria Fijałkowska on a national scale, based on the implementation of innovative technology for the incorporation of road mineral and asphalt mixtures in the technology of asphalt foamed by the addition of zeolite. This technology fits into the production of mineral-asphalt mixtures for heat. Warm Mix Asphalt), which, compared to traditional solutions, are characterised by a reduced production temperature by about 20-30 °C. The project is part of the Regional Smart Specialisations (Advanced Building Materials). The project will be implemented between 1 January 2020 and 31 December 2023 under three tasks: 1. Purchase of production lines: production of bituminous masses and concrete node 2. Purchase of software and IT infrastructure 3. Purchase of ready R & D results (English)
7 July 2021
0 references
L’objectif du projet est de mettre en œuvre une technologie innovante pour la production de mélanges de minéraux et d’asphalte routiers dans la technologie de l’asphalte moussé par l’ajout de zéolite. Ce faisant, les résultats des travaux de recherche et de développement prévus seront utilisés. L’équipe de séquence technologique comprendra une usine de masse bitumineuse, une jonction en béton qui sera située sur une propriété nouvellement achetée non construite (coût non admissible) et un logiciel d’établissement des coûts. Sur la base des résultats des travaux de R & D à acheter, la requérante lancera un nouveau produit — mélange minéral-asphalte, qui, combiné avec du béton pour la construction routière, fournit des paramètres adéquats de la surface de la route en termes de capacité de charge, de résistance au frottement et de durabilité. L’objectif principal du projet est d’accroître la compétitivité de l’ANDRO Anna Maria Fijałkowska à l’échelle nationale, sur la base de la mise en œuvre d’une technologie innovante pour l’incorporation de mélanges de minéraux et d’asphalte routiers dans la technologie de l’asphalte moussé par l’ajout de zéolite. Cette technologie s’intègre dans la production de mélanges minéraux-asphaltes pour la chaleur. Mélange chaud d’asphalte), qui, par rapport aux solutions traditionnelles, se caractérise par une température de production réduite d’environ 20-30 °C. Le projet s’inscrit dans le cadre des spécialisations intelligentes régionales (Matériaux de construction avancés). Le projet sera mis en œuvre entre le 1er janvier 2020 et le 31 décembre 2023 dans le cadre de trois tâches: 1. Achat de lignes de production: production de masses bitumineuses et de nœuds en béton 2. Achat de logiciels et d’infrastructures informatiques 3. Achat de résultats de R & D prêts (French)
4 December 2021
0 references
Identifiers
RPLD.02.03.01-10-0103/19
0 references