Increasing energy efficiency in Andela AD by purchasing new energy efficient equipment (Q3838974)

From EU Knowledge Graph
Revision as of 08:34, 4 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q3838974 in Bulgaria
Language Label Description Also known as
English
Increasing energy efficiency in Andela AD by purchasing new energy efficient equipment
Project Q3838974 in Bulgaria

    Statements

    0 references
    2,004,895.0 Bulgarian lev
    0 references
    1,022,496.45 Euro
    1 December 2021
    0 references
    4,717,400.0 Bulgarian lev
    0 references
    2,405,874.0 Euro
    1 December 2021
    0 references
    0.42 percent
    0 references
    3 August 2018
    0 references
    15 December 2020
    0 references
    0 references

    42°26'40.38"N, 27°12'29.74"E
    0 references
    Настоящият проект предвижда закупуване на нова високоефективна трошачно-пресевна инсталация, тип "промивна" (Мярка 1), изграждане на вентилационна инсталация в производствено помещение за оползотворяване на остатъчна топлинна енергия (Мярка 2) и доставка на автоматизирана система за мониторинг и контрол на енергопотреблението (Мярка 3). Трошачно-пресевната инсталация (ТПИ), тип "промивна" - Мярка 1 от енергийния одит, ще подмени изцяло функциониращите в момента на кариера "Горно Езерово" 2 броя стари трошачно-пресевни инсталации, също тип "промивни". Новата ТПИ, тип "промивна", е с обща инсталирана електрическа мощност 1140 kW. Средната производителност на новата инсталация е 300 т/ч. произведени фракции, а годишното потребление на енергия е 1 459 500 kWh/год.Механичната вентилационна инсталация за оползотворяване на остатъчна топлинна енергия (Мярка 2) ще замени съществуващата обикновена механична вентилация без оползотворяване на остатъчна топлинна енергия в производственото помещение, тип ремонтна работилница, на обекта Кариера “Горно Езерово”.Вентилационната инсталация ще е с ел. мощност на вентилаторите (2 бр.) 0,44 kW, мощност на ел. нагревателя 6 kW и ще осигурява средно около 900 m3/h пресен въздух.Проектът предвижда и въвеждането на автоматизирана система за мониторинг и контрол на енергопотреблението на обект Кариера "Горно Езерово" (Мярка 3). Тя ще се състои от софтуер и технически средства (измервателно табло с аксесоари). Автоматизираната система ще осигурява пълна и детайлна информация, необходима за периодичното провеждане на енергийните анализи на потреблението.В рамките на проекта ще се въведе и система за енергиен мениджмънт и сертифициране по БДС EN ISO 50001. Тези дейности ще доведат до намаляване на разходите за енергийни ресурси, ограничаване на потреблението на енергийни ресурси и по този начин – опазване на околната среда. Проектът ще е със срок за изпълнение 24 месеца и ще е на обща стойност 4 717 400.00 лв. без ДДС. (Bulgarian)
    0 references
    This project provides for the purchase of a new high-efficiency crushing-press system, type “washing” (Measure 1), construction of a ventilation system in a production room for the recovery of residual heat (Measure 2) and supply of an automated system for monitoring and control of energy consumption (Measure 3). The crushing and refreshing installation (TPI), type “washing” — Measure 1 of the energy audit, will replace the 2 old crushing and press installations, also type “washing”, which are fully operational at the moment of the Gorno Ezerovo quarry. The new “washing” type TPI has a total installed electrical power of 1 140 kW. The average output of the new installation is 300 t/h fractions produced, and the annual energy consumption is 1 459 500 kWh/year.The mechanical ventilation system for the recovery of residual heat (Measure 2) will replace the existing normal mechanical ventilation without recovery of residual heat in the production room, type of repair workshop, at the Career “Upper Lake”.The ventilation system will have an electric power output of the fans (2 pcs.) 0.44 kW, power of the heater 6 kW and will provide an average of about 900 m³/h fresh air. The project also foresees the introduction of an automated system for monitoring and control of the energy plant (Marine Facility 3). It will consist of software and technical means (measuring dashboard with accessories). The automated system will provide complete and detailed information necessary for periodic energy analysis of consumption.The project will also introduce a system for energy management and certification under BDS EN ISO 50001. These activities will reduce the cost of energy resources, limit the consumption of energy resources and thus protect the environment. The project will have a deadline of 24 months and will have a total value of BGN 4 717 400.00 excluding VAT. (English)
    2 December 2021
    0 references
    Ce projet prévoit l’achat d’un nouveau système de pressage à haute efficacité, de type «lavage» (mesure 1), la construction d’un système de ventilation dans une salle de production pour la récupération de la chaleur résiduelle (mesure 2) et la fourniture d’un système automatisé de surveillance et de contrôle de la consommation d’énergie (mesure 3). L’installation de concassage et de rafraîchissement (TPI), type «lavage» — Mesure 1 de l’audit énergétique, remplacera les 2 anciennes installations de concassage et de pressage, également de type «lavage», qui sont pleinement opérationnelles au moment de la carrière de Gorno Ezerovo. Le nouveau type «lavage» TPI a une puissance électrique installée totale de 1 140 kW. La production moyenne de la nouvelle installation est de 300 t/h de fractions, et la consommation d’énergie annuelle est de 1 459 500 kWh/an.Le système de ventilation mécanique pour la récupération de la chaleur résiduelle (mesure 2) remplacera la ventilation mécanique normale existante sans récupération de chaleur résiduelle dans la salle de production, type d’atelier de réparation, à la Career «Upper Lake».Le système de ventilation aura une puissance électrique des ventilateurs (2 PC) 0,44 kW, puissance du chauffage 6 kW et fournira une moyenne d’environ 900 m³/h d’air frais. Le projet prévoit également l’introduction d’un système automatisé de surveillance et de contrôle de la centrale énergétique (Marine Facility 3). Il se composera de logiciels et de moyens techniques (mesure du tableau de bord avec accessoires). Le système automatisé fournira des informations complètes et détaillées nécessaires à l’analyse périodique de la consommation d’énergie.Le projet introduira également un système de gestion et de certification de l’énergie dans le cadre du BDS EN ISO 50001. Ces activités permettront de réduire le coût des ressources énergétiques, de limiter la consommation des ressources énergétiques et de protéger ainsi l’environnement. Le projet aura un délai de 24 mois et aura une valeur totale de 4 717 400,00 BGN hors TVA. (French)
    3 December 2021
    0 references
    Dieses Projekt sieht den Erwerb einer neuen hocheffizienten Zerkleinerungspresse, Typ „Waschung“ (Maßnahme 1), den Bau einer Lüftungsanlage in einem Produktionsraum zur Rückgewinnung von Restwärme (Maßnahme 2) und die Lieferung eines automatisierten Systems zur Überwachung und Kontrolle des Energieverbrauchs (Maßnahme 3) vor. Die Zerkleinerung und Erfrischung (TPI), Typ „Waschen“ – Maßnahme 1 des Energieaudits, ersetzt die 2 alten Zerkleinerungs- und Pressanlagen, auch Typ „Waschen“, die zum Zeitpunkt des Steinbruchs Gorno Ezerovo voll funktionsfähig sind. Der neue „Wasch“ Typ TPI hat eine installierte Gesamtleistung von 1 140 kW. Die durchschnittliche Leistung der neuen Anlage beträgt 300 t/h Bruchteile, und der jährliche Energieverbrauch beträgt 1 459 500 kWh/Jahr.Das mechanische Lüftungssystem zur Rückgewinnung von Restwärme (Maß 2) ersetzt die bestehende normale mechanische Lüftung ohne Rückgewinnung von Restwärme im Produktionsraum, Art der Reparaturwerkstatt, am Career „Obersee“. Das Lüftungssystem wird eine elektrische Leistung der Ventilatoren (2 Stk.) 0,44 kW, Leistung des Heizgeräts 6 kW und liefern durchschnittlich ca. 900 m³/h Frischluft. Das Projekt sieht auch die Einführung eines automatisierten Systems zur Überwachung und Steuerung der Energieanlage (Marine Facility 3) vor. Es besteht aus Software und technischen Mitteln (Messen Dashboard mit Zubehör). Das automatisierte System wird vollständige und detaillierte Informationen liefern, die für die periodische Energieanalyse des Verbrauchs erforderlich sind. Das Projekt wird auch ein System für Energiemanagement und -zertifizierung nach BDS EN ISO 50001 einführen. Diese Maßnahmen werden die Kosten der Energieressourcen senken, den Verbrauch von Energieressourcen begrenzen und somit die Umwelt schützen. Das Projekt hat eine Frist von 24 Monaten und hat einen Gesamtwert von 4 717 400,00 BGN ohne Mehrwertsteuer. (German)
    4 December 2021
    0 references
    Бургас
    0 references

    Identifiers

    BG16RFOP002-3.002-0011