Change of conventional heat and electricity supply to a unit working in high-efficiency cogeneration -trigeneration using innovative control methods to increase the safety in the continuity of electricity and thermal power in the Hospital (Q2699868)
Jump to navigation
Jump to search
Project Q2699868 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Change of conventional heat and electricity supply to a unit working in high-efficiency cogeneration -trigeneration using innovative control methods to increase the safety in the continuity of electricity and thermal power in the Hospital |
Project Q2699868 in Poland |
Statements
2,569,640.5 zloty
0 references
4,139,680.0 zloty
0 references
62.07 percent
0 references
15 July 2019
0 references
31 May 2021
0 references
WIELOSPECJALISTYCZNY SZPITAL WOJEWÓDZKI W GORZOWIE WLKP. SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
Beneficjentem projektu jest Wielospecjalistyczny Szpital Wojewódzki w Gorzowie Wielkopolskim, woj. Lubuskie. Geneza projektu jest ściśle związana z działalnością zdrowotną Wnioskodawcy w ramach zaspokajania potrzeb świadczenia usług związanych z opieką zdrowotną i szpitalną na terenie docelowym. Głównym celem projektu jest - Zmiana konwencjonalnego zasilania w ciepło i energię elektryczną na jednostką kogeneracyjną, z wykorzystaniem innowacyjnego sposobu sterowania przy dynamicznie zmiennym poborze energii elektrycznej. Zakres projektu obejmuje kompleksową realizację zadania polegającego na instalacji kogeneratora gazowego wraz z infrastrukturą. Beneficjent zaplanował inwestycję w formule ZAPROJEKTUJ I WYBUDUJ. Zakres rzeczowy przedsięwzięcia obejmuje dostawę i montaż agregatu kogeneracyjnego , czterociągowego kotła parowego oraz wykonanie instalacji technologicznej pod potrzeby szpitala. W zakresie rzeczowym jest demontaż jednego kotła parowego i wodnego . W ich miejsce należy zabudować układ silnika gazowego z osprzętem, oraz przygotować miejsce na wytwornice wody lodowej, która zostanie wykonana w drugim etapie. Pozostałe dwa kotły (parowy i wodny) należy wprowadzić w układ sterowania i automatyki nowego systemu silnika jako zabezpieczenie rezerwowe przy ewentualnej awarii nowego układu. Produktami projektu będzie: ? Dodatkowa zdolność wytwarzania energii cieplnej w warunkach wysokosprawnej kogeneracji – 0,87 MWht ? Dodatkowa zdolność wytwarzania energii elektrycznej w warunkach wysokosprawnej kogeneracji – 0,80 MWhe ? Liczba przedsiębiorstw otrzymujących wsparcie (CI 1)– 1 szt. ? Liczba wybudowanych jednostek wytwarzania energii elektrycznej i cieplnej w ramach kogeneracji – 1 szt. Odbiorcami projektu będą: pacjenci oraz personel Szpitala – wszyscy korzystający z zasobów energii elektrycznej i cieplnej na terenie szpitala. Poziom redukcji CO2 wynosi 32,6% Emisja CO2 przed wynosi 7256 ton/rok Emisja CO2 po wynosi 2367 ton /rok Co daje 32 (Polish)
0 references
The beneficiary of the project is the Multi-Specialist Voivodship Hospital in Gorzów Wielkopolski, voivodship. Lubuskie. The origin of the project is closely linked to the Applicant’s health activities in order to meet the needs of healthcare and hospital services in the target area. The main goal of the project is – Changing conventional heat and electricity supply to a cogeneration unit, using an innovative method of control with dynamically variable electricity consumption. The scope of the project includes a comprehensive implementation of the task consisting of installing a gas cogeneration unit with infrastructure. The Beneficiary has planned an investment in the formula APROJECTIVE and Build. The material scope of the project includes the supply and assembly of a cogeneration unit, a four-string steam boiler and the execution of a technological installation for the needs of the hospital. The material scope is the dismantling of one steam and water boiler. In their place, you need to build a gas engine system with accessories, and prepare a space for ice water generators, which will be made in the second stage. The other two boilers (steam and water) shall be introduced into the control and automation system of the new engine system as a back-up protection in the event of a failure of the new system. The products of the project will be: Additional heat generation capacity in high-efficiency cogeneration – 0.87 MWht? Additional electricity generation capacity under high-efficiency cogeneration – 0.80 MWhe? Number of enterprises receiving support (CI 1) – 1 Number of electricity and heat generation units built in cogeneration – 1 piece The recipients of the project will be: patients and staff of the Hospital – all using electricity and heat resources on the premises of the hospital. The CO2 reduction level is 32.6 % CO2 emissions before is 7256 tonnes/year CO2 emissions after 2367 tonnes/year (English)
7 July 2021
0 references
Le bénéficiaire du projet est l’hôpital de voïvodie multispécialiste de Gorzów Wielkopolski, voïvodie. Lubuskie. L’origine du projet est étroitement liée aux activités de santé de la requérante afin de répondre aux besoins des soins de santé et des services hospitaliers dans la zone cible. L’objectif principal du projet est de modifier l’alimentation en chaleur et en électricité conventionnelle d’une unité de cogénération, en utilisant une méthode innovante de contrôle avec une consommation d’électricité dynamiquement variable. Le champ d’application du projet comprend une mise en œuvre complète de la tâche consistant à installer une unité de cogénération gazière dotée d’infrastructures. Le bénéficiaire a prévu un investissement dans la formule APROJECTIVE et Build. Le champ d’application matériel du projet comprend la fourniture et l’assemblage d’une unité de cogénération, une chaudière à vapeur à quatre cordes et l’exécution d’une installation technologique pour les besoins de l’hôpital. Le champ d’application matériel est le démontage d’une chaudière à vapeur et à eau. À leur place, vous devez construire un système de moteur à gaz avec des accessoires, et préparer un espace pour les générateurs d’eau glacée, qui sera fait dans la deuxième étape. Les deux autres chaudières (vapeur et eau) doivent être introduites dans le système de commande et d’automatisation du nouveau système moteur à titre de protection de secours en cas de défaillance du nouveau système. Les produits du projet seront les suivants: Capacité de production de chaleur supplémentaire en cogénération à haut rendement — 0,87 MWht? Capacité supplémentaire de production d’électricité dans le cadre de la cogénération à haut rendement — 0,80 MWhe? Nombre d’entreprises bénéficiant d’un soutien (IC 1) — 1 Nombre d’unités de production d’électricité et de chaleur construites en cogénération — 1 pièce Les bénéficiaires du projet seront: les patients et le personnel de l’hôpital — tous utilisant l’électricité et la chaleur dans les locaux de l’hôpital. Le niveau de réduction des émissions de CO2 est de 32,6 % d’émissions de CO2 avant 7256 tonnes/an d’émissions de CO2 après 2367 tonnes/an (French)
4 December 2021
0 references
Identifiers
RPLB.03.04.00-08-0001/19
0 references