Revitalisation of railway line 49 on the section Śniadowo – Łomża (Q2711113)

From EU Knowledge Graph
Revision as of 23:28, 3 December 2021 by DG Regio (talk | contribs) (‎Removed claim: contained in NUTS (P1845): Łomżyński (Q2577094), Removing duplicate contained in NUTS)
Jump to navigation Jump to search
Project Q2711113 in Poland
Language Label Description Also known as
English
Revitalisation of railway line 49 on the section Śniadowo – Łomża
Project Q2711113 in Poland

    Statements

    0 references
    0 references
    0 references
    4,114,974.93 zloty
    0 references
    914,758.93 Euro
    0.2223 Euro
    0 references
    4,841,146.98 zloty
    0 references
    1,076,186.97 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    29 June 2020
    0 references
    29 September 2023
    0 references
    PKP POLSKIE LINIE KOLEJOWE S.A.
    0 references

    53°10'56.6"N, 22°3'7.9"E
    0 references

    53°8'43.1"N, 22°0'17.3"E
    0 references

    53°2'19.0"N, 21°59'25.1"E
    0 references
    Celem projektu jest przygotowanie dokumentacji przedprojektowej i projektowej kolejowej infrastruktury technicznej wraz z wymaganymi prawem, pozwoleniami i uzgodnieniami niezbędnymi do zrealizowania robót budowlanych, w tym opracowanie: 1)Rezultatów studium wykonalności na potrzeby wniosku o dofinansowanie dla etapu realizacji robót budowlanych; 3)Kompletnego wniosku o wydanie decyzji OOŚ wraz z KIP dla projektu pn. Rewitalizacja linii kolejowej nr 49 na odcinku Śniadowo-Łomża (Decyzja o środowiskowych uwarunkowaniach została wydana przez RDOŚ w Białymstoku w dniu 29 grudnia 2017 r. i stała się ostateczna z dniem 3 luty 2018 r. 4) Kompletnego wniosku o wydanie zmiany decyzji o środowiskowych uwarunkowaniach, o której mowa w pkt 3, wraz z kartą informacyjną przedsięwzięcia), (opcjonalnie, jeżeli w rezultacie prowadzonych prac projektowych zajdzie potrzeba zmiany przedmiotowej decyzji); 5) Kompletnego wniosku o wydanie decyzji o środowiskowych uwarunkowaniach wraz z kartą informacyjną przedsięwzięcia, oraz (opracowanie raportu o oddziaływaniu przedsięwzięcia na środowisko i inwentaryzacji przyrodniczej – opcjonalnie jeżeli właściwy organ wyda postanowienie o konieczności przeprowadzenia oceny oddziaływania na środowisko) dla przedsięwzięcia polegającego na budowie łącznicy kolejowej pasażersko-towarowej pozwalającej na ominięcie stacji Śniadowo, umożliwiającej bezpośredni dojazd do Łomży od strony Łap/Białegostoku; 4)Koncepcji Programowo - Przestrzennej (KPP) obejmującej wykonanie dokumentacji projektowej budowlanej i wykonawczej; 5)Projektów Budowlanych, wraz z dokumentacją geotechniczną i geologiczno-inżynierską; 6)Projektów Wykonawczych wraz z przedmiarem i kosztorysem inwestorskim; 7)Kompletu materiałów niezbędnych do uzyskania PnB i zgłoszenia robót; 8)Materiałów przetargowych niezbędnych do wyłonienia wykonawców robót budowlanych. (Polish)
    0 references
    The aim of the project is to prepare the pre-design and design documentation of the railway technical infrastructure together with the required laws, permits and arrangements necessary for the execution of the construction works, including the development of: 1)Results of a feasibility study for the application for funding for the stage of construction works; 3)Complete application for an EIA decision together with the NIP for the project entitled Revitalisation of railway line No 49 on the section Śniadowo-Łomża (the decision on environmental conditions was issued by the RDOŚ in Białystok on 29 December 2017 and became final as of 3 February 2018 4) of the complete application for amendment of the environmental permit referred to in point 3, together with the information sheet of the project (optional if, as a result of the ongoing design work, there is a need to amend the decision in question); 5) A complete application for a decision on environmental conditions together with an information sheet of the project, and (elaboration of a report on the environmental impact of the project and an environmental inventory – optionally if the competent authority issues a decision on the need to carry out an environmental impact assessment) for a project consisting of the construction of a passenger-freight link allowing to bypass the Sniadowo station, allowing direct access to Łomża from Łap/Białegostok; 4) Program and Spatial Concept (KPP) including the execution of construction and executive design documentation; 5)Construction projects, together with geotechnical and geological engineering documentation; 6)Executive Projects, including an estimate of the investor and an estimate of the investor; 7)Complete of materials necessary to obtain PNB and report works; 8)Tendering materials necessary for the selection of contractors for construction works. (English)
    8 July 2021
    0 references

    Identifiers

    RPPD.04.02.00-20-0007/20
    0 references