Construction of an installation for the production of heat from biomass with a capacity of 5.1 MW in Tomaszów Mazowiecki. (Q2692716)

From EU Knowledge Graph
Revision as of 18:32, 3 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q2692716 in Poland
Language Label Description Also known as
English
Construction of an installation for the production of heat from biomass with a capacity of 5.1 MW in Tomaszów Mazowiecki.
Project Q2692716 in Poland

    Statements

    0 references
    4,660,000.0 zloty
    0 references
    1,035,918.0 Euro
    0.2223 Euro
    0 references
    10,000,000.0 zloty
    0 references
    2,223,000.0 Euro
    0.2223 Euro
    0 references
    46.6 percent
    0 references
    30 November 2020
    0 references
    31 December 2022
    0 references
    ZAKŁAD USŁUG TECHNICZNYCH SP. Z O.O.
    0 references
    0 references
    0 references

    51°31'10.2"N, 20°2'1.7"E
    0 references
    Przedmiotem studium wykonalności jest Budowa instalacji produkcji ciepła z biomasy o mocy 5,1 MW w Tomaszowie Mazowieckim. Projekt zostanie zrealizowany w oparciu o typowe, dostępne na rynku rozwiązania techniczne. Pozwoli to na utrzymanie trwałości projektu poprzez dostęp do części zamiennych i autoryzowanego serwisu, a także pozwoli na zastosowanie procedury konkurencyjnej w zakupie urządzenia wraz z instalacją bez konieczności sporządzania dokumentacji technicznej urządzenia. Wskutek realizacji przedsięwzięcia nastąpi ograniczenie emisji z instalacji ciepłowni konwencjonalnej dostarczającej dotychczas ciepło sieciowe. (Polish)
    0 references
    The subject of the feasibility study is the construction of an installation for the production of heat from biomass with a capacity of 5.1 MW in Tomaszów Mazowiecki. The project will be implemented on the basis of typical technical solutions available on the market. This will allow to maintain the durability of the project through access to spare parts and authorised service, as well as to use the competitive procedure in the purchase of the device together with the installation without the need to draw up technical documentation of the device. The implementation of the project will result in a reduction in emissions from a conventional heating plant supplying network heat to date. (English)
    7 July 2021
    0 references
    L’étude de faisabilité a pour objet la construction d’une installation de production de chaleur à partir de biomasse d’une capacité de 5,1 MW à Tomaszów Mazowiecki. Le projet sera mis en œuvre sur la base de solutions techniques typiques disponibles sur le marché. Cela permettra de maintenir la durabilité du projet grâce à l’accès aux pièces de rechange et au service autorisé, ainsi que d’utiliser la procédure concurrentielle lors de l’achat de l’appareil en même temps que l’installation sans qu’il soit nécessaire d’établir la documentation technique de l’appareil. La mise en œuvre du projet se traduira par une réduction des émissions d’une installation de chauffage classique fournissant jusqu’à présent de la chaleur du réseau. (French)