Construction of the Niemodlin bypass within dk 46 (Q2693027)
Jump to navigation
Jump to search
Project Q2693027 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of the Niemodlin bypass within dk 46 |
Project Q2693027 in Poland |
Statements
241,571,834.11 zloty
0 references
284,202,157.79 zloty
0 references
85.0 percent
0 references
1 January 2014
0 references
31 December 2022
0 references
GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD
0 references
Przedsięwzięcie polega na budowie obwodnicy Niemodlina w ciągu drogi krajowej nr 46 o parametrach drogi klasy GP o długości 11,49 km, realizowanej w trybie projektuj i buduj. (Polish)
0 references
The project consists of the construction of the Niemodlina ring road along national road No 46 with the parameters of the PG class road with a length of 11.49 km, carried out in the design and construction mode. (English)
7 July 2021
0 references
Le projet consiste en la construction du périphérique Niemodlina le long de la route nationale no 46 avec les paramètres de la route de classe PG d’une longueur de 11,49 km, réalisée en mode conception et construction. (French)
3 December 2021
0 references
Identifiers
POIS.04.02.00-00-0056/20
0 references