130,843,908.92 zloty
0 references
153,934,010.5 zloty
0 references
85.0 percent
0 references
1 February 2017
0 references
31 March 2023
0 references
PAŃSTWOWE GOSPODARSTWO WODNE WODY POLSKIE
0 references
Przedmiotowy projekt zakłada modernizację trzech jazów zlokalizowanych na Odrze: Krępa, Dobrzeń, Groszowice w celu przystosowania Odry do III klasy drogi wodnej. Inwestycja przyczyni się do poprawy warunków eksploatacji obiektów w aspekcie ich bezawaryjności, a tym samym sprawności sterowania procesem przepuszczania wód przez analizowane jazy, które w obecnym stanie technicznym nastręczają wielu problemów eksploatacyjnych wynikających z częstych awarii, z którymi wiąże się brak możliwości właściwego manewrowania zamknięciami i utrzymania właściwego poziomu wody żeglownej. Przebudowa obiektów ma także na celu poprawę stanu urządzeń i elementów wyposażenia technologicznego w aspekcie ich użyteczności eksploatacyjnej, sterowania i komunikacyjnej, zabezpieczenia przed kradzieżą i aktami wandalizmu, jak również udrożnienie odcinka rzeki dla potrzeb ryb tzw. dwuśrodowiskowych, przy jednoczesnym zapewnieniu należytych parametrów i stanu technicznego obiektów. (Polish)
0 references
The project involves the modernisation of three weirs located on the Oder: Tight, Well, Groszowice to adapt the Oder to the third class of the waterway. The investment will contribute to improving the operating conditions of the facilities in terms of their failure-freeness, and thus the efficiency of controlling the process of passing water through the analysed weirs, which, in the current technical condition, present many operational problems resulting from frequent failures, which result in the impossibility of properly manoeuvring closures and maintaining an appropriate level of navigable water. The reconstruction of the facilities also aims at improving the condition of equipment and technological equipment in terms of their operational, control and communication usability, protection against theft and vandalism, as well as the opening of a river section for so-called two-environment fish, while ensuring proper parameters and technical condition of the facilities. (English)
7 July 2021
0 references
Le projet prévoit la modernisation de trois déversoirs situés sur l’Oder: Serré, Eh bien, Groszowice pour adapter l’Oder à la troisième classe de la voie navigable. L’investissement contribuera à améliorer les conditions d’exploitation des installations en termes de non-défaillance, et donc l’efficacité du contrôle du processus de passage de l’eau à travers les déversoirs analysés, qui, dans l’état technique actuel, présentent de nombreux problèmes opérationnels résultant de défaillances fréquentes, qui se traduisent par l’impossibilité de manœuvrer correctement les fermetures et de maintenir un niveau approprié d’eau navigable. La reconstruction des installations vise également à améliorer l’état des équipements et des équipements technologiques en termes de facilité d’exploitation, de contrôle et de communication, de protection contre le vol et le vandalisme, ainsi que d’ouverture d’un tronçon fluvial pour les poissons dits deux environnements, tout en garantissant des paramètres appropriés et l’état technique des installations. (French)
3 December 2021
0 references
Identifiers
POIS.03.02.00-00-0073/19
0 references