Reconstruction and rehabilitation of streets and pavements in the villages of Traykovo, Kovačitsa, Zamfir and Staliyska mahala, Lom municipality (Q3885840)
Jump to navigation
Jump to search
Project Q3885840 in Bulgaria
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction and rehabilitation of streets and pavements in the villages of Traykovo, Kovačitsa, Zamfir and Staliyska mahala, Lom municipality |
Project Q3885840 in Bulgaria |
Statements
942,155.35 Bulgarian lev
0 references
1,108,418.07 Bulgarian lev
0 references
0.85 percent
0 references
3 September 2020
0 references
3 September 2023
0 references
Q3885821 (Deleted Item)
0 references
С проектно предложение "Реконструкция и рехабилитация на улици и тротоари в селата Трайково, Ковачица, Замфир и Сталийска махала, община Лом" предвижда подобряване на транспортно-експлоатационните качества на пътните настилки на 7 улици в четири населени места в община Лом, а именно:1.Улица 9-та в с. Ковачица - от О.Т. 123 до О.Т. 195- 515 метра2.Улица 2 в с. Ковачица - от О.Т. 107 до О.Т. 181- 247,90 метра3.Улица в с. Сталийска махала- от О.Т.79 до О.Т.85 – 291,45 метра4.Улица 9 в с. Сталийска махала- от О.Т. 108 до О.Т. 68 – 306,17 метра5.Улица 11 в с. Сталийска махала- от О.Т. 239 до О.Т. 224 – 286,57 метра6.Улица в с. Трайково от О.Т. 147 до О.Т.168 – 234, 42 метра7.Улица в с. Замфир от О.Т.188 до О.Т.182 – 358,86 метраОбщата дължина на предвидените за реконструкция и рехабилитация улици е 2 240,37 метра.Цел на проекта е възстановяване и подобряване на съществуващата пътна настилка, пътното тяло и отводняването, изграждане на нова пътна конструкция поради моментната липса на такава с цел осигуряване условия за безопасност на движението, комфорт на пътуващите и удължаване на експлоатационния живот на улицата.Благоустрояването обхваща подмяна на всички участъци без носимоспособност, като се изгради нова пътна конструкция на настилката с насип от трошен камък и асфалтобетонови настилки, доставка и монтаж на нови бетонови пътни бордюри, запазване на параметрите на хоризонталните и вертикални криви и нивелетата, направа на хоризонталната маркировка и вертикалната сигнализация. Проектът е с предназначение за подобряване на пътните настилки поради липса на асфалтобетон, влошената равност, както и изграждането на нови пътни конструкции и монтиране на бетонови пътни бордюри. Настилките по улиците са силно компроментирани, а оформените неравности, затрудняват преминаването на автомобили и пешеходци. За износващ пласт на улиците е предвиден плътен асфалтобетон тип "А" и един пласт пласт неплътен асфалтобетон (биндер). (Bulgarian)
0 references
With a project proposal “Reconstruction and rehabilitation of streets and pavements in the villages of Traykovo, Kovačitsa, Zamfir and Staliyska mahala, Lom Municipality” provides for improvement of the transport-operating qualities of the road pavements on 7 streets in four settlements in Lom municipality, namely:1. 9th Street in the village of Kovačitsa — from O.T. 123 to O.T. 195-515 m². Street 2 in the village of Kovačitsa — from O.T. 107 to O.T. 181-247.90 m³. Street in the village of Staliyska mahala- from O.T.79 to O.T.85-291,45 m4. Street 9 in the village of Staliyska mahala- from O.T. 108 to O.T. 68-306.17 meters5. Street 11 in the village of Staliyska mahala — from O.T. 239 to O.T. 224-286, 57 meters6. Street in Traykovo village from O.T. 147 to O.T.168-234, 42 m7. Street in Zamfir village from O.T.188 to O.T.182-358.86 meters The total length of the streets provided for reconstruction and rehabilitation is 2 240.37 meters.The project aims to restore and improve the existing road surface, road body and drainage. construction of a new road construction due to the current lack of road construction in order to provide conditions for road safety, comfort of the occupants and extension of the service life on the street.The construction includes the replacement of all sections without bearing capacity, building a new road structure of the pavement with crushed stone and asphalt concrete pavement, delivery and installation of new concrete road curbs, preservation of the parameters of horizontal and vertical curves and levels, making the horizontal marking and vertical signalling. The project is designed to improve road surfaces due to lack of asphalt concrete, degraded equilibrium, as well as construction of new road constructions and installation of concrete road curbs. The pavements on the streets are highly compromised and the shaped bumps make it difficult to pass cars and pedestrians. A dense asphalt concrete type “A” and one layer of loose asphalt concrete (binder) are provided for the wear layer of the streets. (English)
2 December 2021
0 references
Avec une proposition de projet «Reconstruction et réhabilitation des rues et des trottoirs dans les villages de Traykovo, Kovačitsa, Zamfir et Staliyska mahala, municipalité de Lom» prévoit l’amélioration des qualités de transport des trottoirs routiers sur 7 rues dans quatre villages de la municipalité de Lom, à savoir:1. 9ème rue dans le village de Kovačitsa — de O.T. 123 à O.T. 195-515 m². Rue 2 dans le village de Kovačitsa — de O.T. 123 à O.T. 195-515 m². Rue 2 dans le village de Kovačitsa — de O.T. 123 à O.T. 195-515 m². Rue 2 dans le village de Kovačitsa — de O.T. 107 à O.T. 181-247,90 m³. Rue dans le village de Staliyska mahala- de O.T.79 à O.T.85-291,45 m4. Rue 9 dans le village de Staliyska mahala- de l’O.T. 108 à O.T. 68-306,17 mètres5. Rue 11 dans le village de Staliyska mahala — de O.T. 239 à O.T. 224-286, 57 mètres6. Rue dans le village de Traykovo de l’O.T. 147 à O.T.168-234, 42 m7. Rue dans le village de Zamfir de O.T.188 à O.T.182-358,86 mètres La longueur totale des rues prévues pour la reconstruction et la réhabilitation est de 2 240,37 mètres. Le projet vise à restaurer et à améliorer le revêtement de la route existante, le corps de la route et le drainage. construction d’une nouvelle construction routière en raison de l’absence actuelle de construction routière afin d’assurer des conditions de sécurité routière, confort des occupants et extension de la durée de vie dans la rue.La construction comprend le remplacement de tous les tronçons sans capacité portante, la construction d’une nouvelle structure routière du chaussée avec chaussée en pierre concassée et asphaltée, la livraison et l’installation de nouvelles bordures de route en béton, la préservation des paramètres des courbes et des niveaux horizontaux et verticaux, faisant le marquage horizontal et la signalisation verticale. Le projet est conçu pour améliorer les surfaces routières en raison du manque de béton bitumineux, de la dégradation de l’équilibre, ainsi que de la construction de nouvelles constructions routières et de l’installation de bordures de routes en béton. Les trottoirs dans les rues sont très compromis et les bosses de forme rendent difficile le passage des voitures et des piétons. Un béton bitumineux dense type «A» et une couche de béton bitumineux lâche (reliure) sont prévus pour la couche d’usure des rues. (French)
3 December 2021
0 references
с.Замфирс.Ковачицас.Сталийска махалас.Трайково
0 references
Identifiers
BG06RDNP001-7.001-0141
0 references