“Renewal and implementation of energy efficiency measures in the building of the District Office "Fire Safety and Protection of the Population" in Kozloduy (Q3885499)

From EU Knowledge Graph
Revision as of 17:07, 3 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q3885499 in Bulgaria
Language Label Description Also known as
English
“Renewal and implementation of energy efficiency measures in the building of the District Office "Fire Safety and Protection of the Population" in Kozloduy
Project Q3885499 in Bulgaria

    Statements

    0 references
    145,248.35 Bulgarian lev
    0 references
    74,076.66 Euro
    1 December 2021
    0 references
    170,880.41 Bulgarian lev
    0 references
    87,149.01 Euro
    1 December 2021
    0 references
    0.85 percent
    0 references
    21 September 2016
    0 references
    4 June 2019
    0 references
    Q3885492 (Deleted Item)
    0 references

    43°46'21.83"N, 23°43'41.74"E
    0 references
    Проектът предвижда прилагане на мерки за енергийна ефективност на сграда общинска собственост, предоставена за безвъзмездно ползване на Районна служба "Пожарна безопасност и защита на населението" (РСПБЗН), гр. Козлодуй - териториална структура на Министерството на вътрешните работи. Състоянието, в което е сградата не съответства на изискванията за енергийна ефективност съгласно Наредба 7 от 2004 г. за енергийна ефективност на сгради, тъй като сградата би следвало да притежава най-малко клас на енергопотребление „С”, а към момента на обследване тя притежава клас „Е”.Целева група по проекта са 10 човека - служители на РСПБЗН.С реализирането на проекта се цели повишаването на енергийната ефективност на обществените сгради; премахването на загубите на електроенергия; намаляване на вредните емисии в атмосферата.Очаквани резултати от изпълнението на проекта: - Подобряване комфорта на обитаване в обществените сгради и постигане на нормативно определените параметри на средата за отопление и осветление; - Оптимизиране на бюджетните разходи, в резултат на постигнатите икономии на енергия от изпълнените енергоефективни мерки, спрямо нормативно определените за предходни периоди; - Удължен експлоатационен срок на публичната инфраструктура и на техните инсталации и съоръжения; - Намаляване на въглеродните емисии от публичната инфраструктура.Основните дейности по проекта са: Инженеринг (проектиране, заедно с авторски надзор и строителство); Строителен надзор; Организация и управление на проекта; Публичност и визуализация; Одит. (Bulgarian)
    0 references
    The project provides for the implementation of energy efficiency measures for the municipal property building, granted for free use to the District Office “Fire Safety and Protection of the Population” (RSPBZN), Kozloduy — a territorial structure of the Ministry of Interior. The condition in which the building is not in conformity with the requirements for energy efficiency under Ordinance 7 of 2004 on energy efficiency of buildings, as the building should have at least the energy consumption class “C” and at the time of the audit it has class “E”. The target group of the project is 10 people — employees of the RSPBZN. The implementation of the project aims to improve the energy efficiency of public buildings; the elimination of electricity losses; reduction of harmful emissions into the atmosphere.Expected results of the implementation of the project: — Improving the comfort of living in public buildings and achieving the statutory parameters of the environment for heating and lighting; — Optimisation of the budgetary costs resulting from the energy savings achieved by the implemented energy efficiency measures compared to those laid down for previous periods; — Extended service life of the public infrastructure and their installations and facilities; — Reduction of carbon emissions from public infrastructure.The main activities of the project are: Engineering (design, together with author’s supervision and construction); Construction supervision; Organisation and management of the project; Publicity and visualisation; Audit. (English)
    2 December 2021
    0 references
    Le projet prévoit la mise en œuvre de mesures d’efficacité énergétique pour le bâtiment municipal, accordées gratuitement au bureau de district «Sécurité incendie et protection de la population» (RSPBZN), Kozloduy — une structure territoriale du Ministère de l’intérieur. La condition dans laquelle le bâtiment n’est pas conforme aux exigences en matière d’efficacité énergétique prévues par l’ordonnance no 7 de 2004 sur l’efficacité énergétique des bâtiments, étant donné que le bâtiment doit avoir au moins la classe de consommation d’énergie «C» et, au moment de l’audit, il a la classe «E». Le groupe cible du projet est de 10 personnes — employés du RSPBZN. La mise en œuvre du projet vise à améliorer l’efficacité énergétique des bâtiments publics; l’élimination des pertes d’électricité; réduction des émissions nocives dans l’atmosphère.Résultats attendus de la mise en œuvre du projet: — L’amélioration du confort de vie dans les bâtiments publics et la réalisation des paramètres réglementaires de l’environnement pour le chauffage et l’éclairage; — Optimisation des coûts budgétaires résultant des économies d’énergie réalisées par les mesures d’efficacité énergétique mises en œuvre par rapport à celles prévues pour les périodes précédentes; — L’allongement de la durée de vie des infrastructures publiques et de leurs installations et installations; — Réduction des émissions de carbone provenant des infrastructures publiques.Les principales activités du projet sont les suivantes: Ingénierie (conception, avec la supervision et la construction de l’auteur); La supervision de la construction; Organisation et gestion du projet; Publicité et visualisation; Audit. (French)
    3 December 2021
    0 references
    Козлодуй
    0 references

    Identifiers

    BG16RFOP001-2.001-0082
    0 references