Improving the energy efficiency of residential buildings in Berkovitsa — stage 3 (Q3884048)
Jump to navigation
Jump to search
Project Q3884048 in Bulgaria
Language | Label | Description | Also known as |
---|---|---|---|
English | Improving the energy efficiency of residential buildings in Berkovitsa — stage 3 |
Project Q3884048 in Bulgaria |
Statements
1,274,999.47 Bulgarian lev
0 references
1,499,999.38 Bulgarian lev
0 references
0.85 percent
0 references
9 September 2020
0 references
9 March 2023
0 references
0 references
Настоящето проектно предложение е насочено към повишаване на ЕЕ на три МЖС на територията на град Берковица, чрез осъществяване на енергоспестяващи мерки.Сградите са избрани след проведена информационна кампания.С проекта се предвижда внедряването на всички задължителни ЕСМ от енергийното обследване на жилищните сградии постигане на най-малко на енергиен клас С на всяка сграда. Едната жилищна сграда е с административен адрес гр. Берковица, Бул. „Мрамор” № 1, бл. Бор-2. Сградата е строена и въведена в експлоатация през 1965-1968 г.Другата жилищна сграда е с административен адрес гр. Берковица, ж.к. "Изгрев", бл. 74. Сградата е въведена в експлоатация през 1976 г.Третата жилищна сграда е с административен адрес гр. Берковица, ж.к. "Заряница", бл. 27, бл. 28, бл. 29 и бл. 30. Сградата е построена и въведена в експлоатация през 1979 - 1980 г.Дейностите по проекта ще спомогнат за намаляване разходите за поддръжката на материалната база и разходи за енергопотребление и отопление, като от друга страна ще се подобри комфорта и енергийните характеристики на сградите. Допълнителен ефект от мерките ще осигури рентабилната експлоатация, което ще позволи устойчивото й управление и поддръжка във времето. С настоящето проектно предложение се предвижда внедряването на следните ЕСМ и постигане на енергиен клас А, съответно клас В на трите сгради: Мярка В1 – Топлоизолация на външни стени;Мярка В2 – Топлоизолация на покрив; Мярка ВЗ - Топлоизолация на под; Мярка В4 - Подмяна на дограма; Мярка С1 – Оптимизация на осветителната система – монтаж на светодиодни осветители в общите части; При извършеното енергийно обследване се установи, че топлинните загуби през ограждащите външни елементи – стени и покрив са големи и сградата не отговаря на съвременните изисквания за енергийна ефективност. В настоящето състояние сградите попадат в клас на енергопотребление D съответно F от скала на енергопотреблението. (Bulgarian)
0 references
The present project proposal is aimed at increasing the EE of three MZH on the territory of the town of Berkovitsa by implementing energy-saving measures. The buildings are selected after an information campaign. The project envisages the implementation of all mandatory ESM from the energy audit of residential buildings and achieving at least the energy class C of each building. One residential building has an administrative address in Berkovitsa, 1, Marmor Blvd., blvd. Bor-2. The building was built and put into operation in 1965-1968. The other residential building has an administrative address in Berkovitsa, Izgrev district, bl. 74. The building was put into operation in 1976. The third residential building has an administrative address in Berkovitsa, Zaraynitsa residential district, bl. 27, bl. 28, bl. 29 and bl. 30. The building was built and put into operation in 1979-1980.The project activities will help to reduce the cost of maintenance of the facilities and costs of energy consumption and heating and on the other hand will improve the comfort and energy performance of the buildings. An additional effect of the measures will ensure cost-effective operation, allowing its sustainable management and maintenance over time. This project proposal provides for the implementation of the following EJNs and the achievement of energy class A, respectively class B, of the three buildings: Measure B1 — Heat insulation of external walls; Measure B2 — Heat insulation of the roof; Measure HZ — Heat insulation of the floor; Measure B4 — Replacement of joinery; Measure C1 — Optimisation of the lighting system — installation of LED luminaires in common areas; The energy audit found that the thermal losses through the surrounding external elements — walls and roof were large and the building did not meet modern energy efficiency requirements. In the current state, buildings fall into energy consumption class D or F on a scale of energy consumption. (English)
2 December 2021
0 references
La présente proposition de projet vise à accroître l’efficacité énergétique de trois MZH sur le territoire de la ville de Berkovitsa en mettant en œuvre des mesures d’économie d’énergie. Les bâtiments sont sélectionnés après une campagne d’information. Le projet prévoit la mise en œuvre de tous les MES obligatoires à partir de l’audit énergétique des bâtiments résidentiels et d’atteindre au moins la classe énergétique C de chaque bâtiment. Un bâtiment résidentiel a une adresse administrative à Berkovitsa, 1, boulevard Marmor, blvd. Bor-2. Le bâtiment a été construit et mis en service en 1965-1968. L’autre bâtiment résidentiel a une adresse administrative à Berkovitsa, district d’Izgrev, bl. 74. Le bâtiment a été mis en service en 1976. Le troisième bâtiment résidentiel a une adresse administrative à Berkovitsa, district résidentiel de Zaraynitsa, bl. 27, bl. 28, bl. 29 et 30. Le bâtiment a été construit et mis en service en 1979-1980. Les activités du projet contribueront à réduire les coûts d’entretien des installations et les coûts de consommation d’énergie et de chauffage et, d’autre part, amélioreront le confort et la performance énergétique des bâtiments. Un effet supplémentaire des mesures garantira un fonctionnement rentable, permettant sa gestion et son entretien durables au fil du temps. Cette proposition de projet prévoit la mise en œuvre des RJE suivants et l’obtention de la classe d’énergie A, respectivement classe B, des trois bâtiments: Mesure B1 — Isolation thermique des murs extérieurs; Mesure B2 — Isolation thermique du toit; Mesure HZ — Isolation thermique du plancher; Mesure B4 — Remplacement de la menuiserie; Mesure C1 — Optimisation du système d’éclairage — installation de luminaires LED dans les espaces communs; L’audit énergétique a permis de constater que les pertes thermiques causées par les éléments extérieurs environnants — les murs et le toit — étaient importantes et que le bâtiment ne répondait pas aux exigences modernes en matière d’efficacité énergétique. Dans l’état actuel, les bâtiments entrent dans les classes de consommation d’énergie D ou F à une échelle de consommation d’énergie. (French)
3 December 2021
0 references
Берковица
0 references
Identifiers
BG16RFOP001-2.003-0042
0 references