Revision as of 15:01, 3 December 2021 by DG Regio (talk | contribs) (‎Removed claim: summary (P836): Errichtung eines neuen Betriebsstandortes für die Pichler Gesellschaft m.b.H. Die Produktionskapazitäten sollen am neuen Standort um rund 50% erhöht werden, insbesondere zum Ausbau des Geschäftsfeldes industrieller Anlagenbau., Removing bad summary)
Jump to navigation Jump to search
Project Q3061374 in Austria
Language Label Description Also known as
English
Pichler works HQ: Construction of a new site
Project Q3061374 in Austria

    Statements

    0 references
    5,632,000.0 Euro
    0 references
    28 September 2020
    0 references
    28 February 2022
    0 references
    Pichler Gesellschaft m.b.H.
    0 references
    0 references

    47°13'2.71"N, 15°37'19.81"E
    0 references
    61766
    0 references
    Construction of a new operating location for Pichler Gesellschaft m.b.H. Production capacities are to be increased by around 50 % at the new site, in particular for the expansion of the business area of industrial plant engineering. (English)
    20 July 2021
    0 references
    Création d’un nouveau site d’exploitation pour Pichler Gesellschaft m.b.H. Les capacités de production seront augmentées d’environ 50 % sur le nouveau site, notamment pour l’extension de l’activité de construction d’installations industrielles. (French)
    27 November 2021
    0 references
    De bouw van een nieuwe fabriek voor Pichler Gesellschaft m.b.H. De productiecapaciteit op de nieuwe locatie moet met ongeveer 50 % worden verhoogd, met name om het bedrijfssegment van de bouw van industriële installaties uit te breiden. (Dutch)
    29 November 2021
    0 references
    Weiz
    0 references

    Identifiers

    AUST-1086