New hall construction and purchase of a special pallet plant and construction of a drying chamber (Q3061072)
Jump to navigation
Jump to search
Project Q3061072 in Austria
Language | Label | Description | Also known as |
---|---|---|---|
English | New hall construction and purchase of a special pallet plant and construction of a drying chamber |
Project Q3061072 in Austria |
Statements
2,156,927.75 Euro
0 references
4 May 2015
0 references
31 August 2016
0 references
Josef Speckner GmbH
0 references
40442
0 references
A plant for the production of large pallets will be installed in the newly built hall. At the same time as the capacity expansion, another drying chamber with heat recovery and a paved storage site will be built. (English)
20 July 2021
0 references
Dans le hall nouvellement construit, une installation de production de grandes palettes est installée, parallèlement à l’extension de la capacité, une autre chambre sèche avec récupération de chaleur et un espace de stockage goudronné sont construits. (French)
27 November 2021
0 references
In de nieuw gebouwde hal wordt een fabriek voor de productie van grote pallets geïnstalleerd. Tegelijkertijd wordt met de capaciteitsuitbreiding een verdere droogkamer met warmteterugwinning en een geasfalteerde opslagruimte gebouwd. (Dutch)
29 November 2021
0 references
Schwand im Innkreis
0 references
Identifiers
AUST-784
0 references