Supply, installation and commissioning of port reception facilities (PSF) in Bulgarian ports for public transport of national importance (Q3856412)

From EU Knowledge Graph
Revision as of 13:55, 3 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q3856412 in Bulgaria
Language Label Description Also known as
English
Supply, installation and commissioning of port reception facilities (PSF) in Bulgarian ports for public transport of national importance
Project Q3856412 in Bulgaria

    Statements

    0 references
    10,865,365.45 Bulgarian lev
    0 references
    5,541,336.38 Euro
    1 December 2021
    0 references
    13,337,960.0 Bulgarian lev
    0 references
    6,802,359.6 Euro
    1 December 2021
    0 references
    0.81 percent
    0 references
    7 April 2020
    0 references
    30 October 2022
    0 references
    0 references
    Проектът предвижда доставка, монтаж и въвеждане в експлоатация на съоръжения за приемане на отпадъци от експлоатацията на кораби и остатъци от товари, съоръжения за превенция и реагиране при експлоатационни и аварийни замърсявания (СПРЕАЗ), както и разработване и внедряване на интегрирана информационна платформа (ИИП) за управление и осигуряване на безопасност с оглед оптимизиране и развитие на информационното обслужване на морския и речен транспорт.С качественото изпълнение на инвестиционния проект ще се постигне привеждане на българските пристанища към изискванията на Европейския съюз в областта на защита на околната среда, произтичащи от европейските политики и директиви, както и на международните конвенции и стандарти в областта на водния транспорт.В програмен период 2014-2020 г. на ОПТТИ ДППИ изпълнява проект №BG16M1OP001-4.001-0005 „Техническа помощ за подготовката и реализацията на проект „Доставка, монтаж и въвеждане в експлоатация на пристанищни приемни съоръжения (ППС) в българските пристанища за обществен транспорт с национално значение“ в рамките на който са изготвени прединвестиционни проучвания с анализ и обосновка на настоящи и бъдещи нужди и капацитети от ППС и СПРЕАЗ за петте пристанища за обществен транспорт с национално значение, прединвестиционно проучване и анализ на вариантите за внедряване на ИИП, анализ на разходите и ползите, тръжна документация за провеждане на обществени поръчки с предмет „Доставка, монтаж и въвеждане в експлоатация на пристанищни приемни съоръжения (ППС) в българските пристанища за обществен транспорт с национално значение“ и „Изпълнение и внедряване на интегрирана информационна платформа в българските пристанища“. Изготвените документи са подготвителен етап за настоящия инвестиционен проект. (Bulgarian)
    0 references
    The project provides for the supply, installation and commissioning of facilities for the reception of ship-generated waste and cargo residues, equipment for prevention and response to operational and emergency pollution (OER), as well as the development and implementation of an integrated information platform (IPP) for management and safety assurance with a view to optimising and developing the information services of maritime and river transport.The quality implementation of the investment project will bring the Bulgarian ports to the requirements of the European Union in the field of environmental protection, stemming from the European policies and directives, as well as the international conventions and standards in the field of water transport.In the programming period 2014-2020 of OPTIP, the Bulgarian ports implements the implementation of the FLAC with the implementation of the Facilities and the implementation of the Facilities in the implementation of the Facilities and the Facilities in the implementation of the Facilities and the Facilities in the field of Facilities and the implementation of the Facilities for the implementation of the Facilities and the implementation of the Facilification of the Facilities in the implementation of the Facil and the Facilification of the Facilities. The documents prepared are a preparatory stage for this investment project. (English)
    2 December 2021
    0 references
    Le projet prévoit la fourniture, l’installation et la mise en service d’installations pour la réception des déchets d’exploitation des navires et des résidus de cargaison, des équipements de prévention et d’intervention en cas de pollution opérationnelle et d’urgence (REO), ainsi que le développement et la mise en œuvre d’une plate-forme d’information intégrée (IPP) pour la gestion et l’assurance de la sécurité en vue d’optimiser et de développer les services d’information des transports maritimes et fluviaux.La mise en œuvre du projet d’investissement permettra aux ports bulgares de répondre aux exigences de l’Union européenne dans le domaine de la protection de l’environnement, découlant des politiques et directives européennes, ainsi que des conventions et normes internationales dans le domaine du transport maritime et fluvial.Dans la période de programmation 2014-2020 de l’OPTIP, les ports bulgares mettront en œuvre les facilités de mise en œuvre des facilités de mise en œuvre des facilités de mise en œuvre des facilités de mise en œuvre des facilités de mise en œuvre des facilités de mise en œuvre et des facilités de mise en œuvre des facilités de mise en œuvre des facilités de mise en œuvre des facilités de mise en œuvre des facilités de mise en œuvre et des facilités de mise en œuvre des facilités de mise en œuvre des facilités de mise en œuvre des facilités de mise en œuvre et des facilités de mise en œuvre des facilités de mise en œuvre des facilités de mise en œuvre des facilités de mise en œuvre des facilités de mise en œuvre des facilités de mise en œuvre des facilités de mise en œuvre des facilités de mise en œuvre des facilités de mise en œuvre et des facilités de mise en œuvre des facilités de mise en œuvre des facilités de mise en œuvre des facilités de mise en œuvre des facilités de mise en œuvre des facilités de mise en œuvre des facilités de mise en œuvre et des facilités de mise en œuvre des facilités de mise en œuvre des facilités de mise en œuvre et des facilités de mise en œuvre des facilités de mise en œuvre des facilités de mise en œuvre des facilités de mise en œuvre et des facilités de mise en œuvre des facilités de mise en œuvre des facilités de mise en œuvre des facilités de mise en œuvre et des facilités de mise en œuvre des facilités de mise en œuvre et des facilités de mise en œuvre des facilités de mise en œuvre des facilités de mise en œuvre et des facilités de mise en œuvre des facilités de mise en œuvre et des facilités de mise en œuvre des facilités de mise en œuvre et des facilités de mise en œuvre des facilités de mise en œuvre des facilités de mise en œuvre des facilités de mise en œuvre des facilités de mise en œuvre et des facilités de mise en œuvre des facilités d’exécution des facilités de mise en œuvre des facilités de mise en œuvre et des facilités de mise en œuvre des facilités de mise en œuvre et des facilités de mise en œuvre des facilités de mise en œuvre et des facilités de mise en œuvre des facilités de mise en œuvre des facilités de mise en œuvre des Facac Les documents préparés constituent une étape préparatoire à ce projet d’investissement. (French)
    3 December 2021
    0 references
    БургасВарнаВидинЛомРусеСилистраСофия
    0 references

    Identifiers

    BG16M1OP001-4.001-0015
    0 references