Equipment of manufacturing plant for pressure vessels and metal products, and ensuring durable employment in Eco Gas Engineering Ltd. (Q3857601)
Jump to navigation
Jump to search
Project Q3857601 in Bulgaria
Language | Label | Description | Also known as |
---|---|---|---|
English | Equipment of manufacturing plant for pressure vessels and metal products, and ensuring durable employment in Eco Gas Engineering Ltd. |
Project Q3857601 in Bulgaria |
Statements
269,706.16 Bulgarian lev
0 references
634,602.73 Bulgarian lev
0 references
0.42 percent
0 references
5 October 2020
0 references
5 October 2022
0 references
ЕКО ГАЗ ИНЖЕНЕРИНГ ООД е създаденo през 2005 г. с предмет на дейност проектиране, изграждане, поддръжка и ремонт на промишлени инсталации: отоплителни инсталации с пара и гореща вода, газови инсталации, както и производство на парни и водни колектори, оборудване за дестилерии за етерични масла и цялостното им изграждане. Производствените мощности на дружеството са разположени в гр. Първомай, обл. Пловдив. За да бъде конкурентно на останалите фирми, работещи в сектора, Еко Газ Инженеринг ООД трябва да притежава сериозен профе-сионален и технологичен капацитет, за да може да поема големи обеми поръчки при кратки срокове за изпълнение и гарантирано високо качество на крайните изделия.Главните проблеми, пред които е изправена фирмата към момента са свързани с малобройният персонал, ниския производствен капацитет и невъзможност за обслужване на нарастващото търсене. Сега могат да се поемат ограничен брой големи и сложни поръчки, за да се изпълнят в исканите от клиентите срокове.Това налага сериозно инвестиране за повишаване на качеството и производствения капацитет. Изпълнението на настоящия проект, ще допринесе за разрешаване на идентифицираните проблеми чрез закупуване и внедряване на ново, модерно и високо произво-дително оборудване, с което значително ще се подобри качеството. Производствения капацитет на предприятие ще се повиши с повече от 100 %, спрямо 2017 г.Предвижда се да бъде закупено следното оборудване:Четиривалова хидравлична листоогъваща машина - 1 бр.; Заваръчна колонна машина - 1 бр.; Кран мостов едногредов 10 тона - 1 бр.; Мотокар 3,5 тона с двойна горивна система (бензин/газ) - 1 бр.Изпълнението на проекта ще доведе до успешно реализиран и финансиран инвестиционен проект, до увеличен с 10 служители персонал, както и до разширявяне капацитета на съществуващия стопански обект, намаляване на разходите за производство на единица продукция, развитие на екологично съобразено производство и подобряване на енергийната ефективност на дружеството. (Bulgarian)
0 references
Eco GAZ ENGINEERING Ltd. was established in 2005 with activity of design, construction, maintenance and repair of industrial installations: heating installations with steam and hot water, gas installations, as well as production of steam and water collectors, equipment for distilleries for essential oils and their complete construction. The production facilities of the company are located in Parvomay, region. Plovdiv. In order to be competitive with the other companies working in the sector, Eco Gas Engineering Ltd. needs to have a serious professional and technological capacity in order to be able to take large volumes of orders at short deadlines for completion and guaranteed high quality of the end products. The main problems facing the company at the moment are related to the small number of staff, low production capacity and inability to serve the growing demand. Now, a limited number of large and complex orders can be taken in order to meet the deadlines requested by customers. This requires serious investment to increase quality and production capacity. The implementation of this project will contribute to solving the identified problems through the purchase and implementation of new, modern and high production equipment, which will significantly improve the quality. The production capacity of an enterprise will increase by more than 100 % compared to 2017. The following equipment is planned to be purchased: Four hydraulic leaf bending machine — 1 pcs.; Welding column machine — 1 pcs.; Crane bridge single-gold 10 tons — 1 pcs.; Forklift 3.5 tons with dual fuel system (petrol/gas) — 1 piece.The implementation of the project will lead to a successfully implemented and funded investment project, to increased by 10 employees, as well as to expansion of the capacity of the existing establishment, reduction of unit production costs, development of environmentally friendly production and improvement of the energy efficiency of the company. (English)
2 December 2021
0 references
Първомай
0 references
Identifiers
BG06RDNP001-6.004-0117
0 references