Ramp-culture – creating a multifunctional space in the centre of Goleniów and giving it new socio-cultural functions by revitalising degraded generational infrastructure (Q139069)

From EU Knowledge Graph
Revision as of 12:29, 3 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q139069 in Poland
Language Label Description Also known as
English
Ramp-culture – creating a multifunctional space in the centre of Goleniów and giving it new socio-cultural functions by revitalising degraded generational infrastructure
Project Q139069 in Poland

    Statements

    0 references
    3,273,242.31 zloty
    0 references
    785,578.15 Euro
    13 January 2020
    0 references
    6,411,974.91 zloty
    0 references
    1,538,873.98 Euro
    13 January 2020
    0 references
    51.05 percent
    0 references
    15 May 2019
    0 references
    29 June 2020
    0 references
    GMINA GOLENIÓW
    0 references
    Celem projektu jest ożywienie społ. M. Goleniów i wparcie os. zagrożonych wykluczeniem przez rewitalizację zdegradowanego budynku Rampy i otoczenia (24 m. parking.), na obszarze rewitalizacji (LPR, projekt gł.) i nadanie mu nowych funkcji społ.-kultur. Projekt wpłynie na rozwiązanie zidentyfikowanych problemów. Obiekt zaniedbany, nieużytkowany, brak możliwości wykorzystania na c.społ., w tym aktywizację mieszkańców obsz. rewitalizacji. Nie jest dostosowany do potrzeb os. niepełnosprawnych i starszych . Inwestycja zniweluje ten problem (wejście, toalety, 2 m.parkingowe) i wprowadzi nowe usługi. Rewitalizacja stworzy obiekt kultury przeznaczony na teatr, kawiarnię, spotkania zorganiz. grup, umożliwi organizację wydarzeń kultur., aktywizację mieszkańców. Zmodernizowane pomieszczenia poprawią dostępność i zwiększą bezp. Pr. wpłynie korzystnie na środowisko-podłączenie do miejskiej sieci c.o i wod-kan, oświetlenie energooszcz., izolacja termiczna, akustyczna, p-wilgociowa, zagosp. terenu, mała archit. Inwestycja dot.rewital. obiektu-pow. uż. 1014,16m2, w tym utworzenie w dwuczęściowym budynku: sali widowiskowej i treningowej do przedstawień, zaplecza szatniowo-socjalnego, pomieszczeń biurowych, gospod. i techn.; kawiarni, magazynów. Prace–prace murarskie, renowacyjne i izolacyjne, wymiana stolarki, modernizacja dachu i instalacji (sanitarna, cieplna, elektryczna), dostawa i adapt. wagonów. Projekt nie przewiduje przeznaczenia pow. dla działalności gospod. Etapy projektu: pozw. na bud., dokumentacja (zrealizowane), procedura przetargowa, pr. budowlane i dostawa, adaptacja wagonów, promocja, inspektor nadzoru (do realizacji). Ok. 500os/m-c będzie uczestniczyło w wydarzeniach organizowanych na terenie Rampy, śr.3 wydarzenia/m-c, 1 obszar zostanie objęty rewitalizacją i dostosowany do potrzeb niepełnosprawnych. Gr. docelowa - mieszkańcy miasta, w tym obszaru rewitalizacji, turyści. Okres realizacji 30.12.18-31.12.19. Projekt wdrażany będzie przez Gm. Goleniów. (Polish)
    0 references
    The aim of the project is to revitalise the community. M. Goleniów and support people at risk of exclusion by revitalising the degraded Rampa building and surroundings (24 m. parking.), in the area of revitalisation (LPR, deep project) and giving it new functions of the community-culture. The project will help solve the identified problems. The building is neglected, unused, it is not possible to use on the C.S., including the activation of residents of the revitalisation area. It is not adapted to the needs of people with disabilities and older people. The investment will eliminate this problem (entry, toilets, 2 m.parking) and will introduce new services. Revitalisation will create a cultural object dedicated to theatre, cafe, meetings of organisations. groups, will enable the organisation of cultural events. Modernised rooms will improve accessibility and increase the security. Pr. will have a beneficial impact on the environment-connection to the city’s central heating and water-channel network, energy-saving lighting, thermal insulation, acoustic insulation, p-humid, land management, small archit. Investment for rewital. object-survey. 1014,16 m², including the creation in a two-part building: spectacle and training room for performances, locker room, office space, guest house and techn.; cafes, magazines. Works-masonry, renovation and insulating work, replacement of carpentry, modernisation of roof and installation (sanitary, heat, electrical), delivery and adaptation of wagons. The project does not provide for the use of the area for the activities of gospods. Stages of the project: lawsuit for construction, documentation (realised), tender procedure, construction and delivery procedure, wagon adaptation, promotion, supervision inspector (to be carried out). It’s okay. 500os/m-c will take part in events organised in the Ramp, wed.3 events/m-c, 1 area will be revitalised and adapted to the needs of the disabled. Target – residents of the city, including revitalisation area, tourists. Implementation period 30.12.18-31.12.19. The project will be implemented by Gm. Goleniów. (English)
    21 October 2020
    0 references
    L’objectif du projet est de revitaliser la communauté. M. Goleniów et soutien aux personnes menacées d’exclusion en revitalisant le bâtiment dégradé de Rampa et ses environs (24 m de stationnement), dans la zone de revitalisation (LPR, projet en profondeur) et en lui conférant de nouvelles fonctions socioculturelles. Le projet abordera les problèmes identifiés. L’objet est négligé, inutilisé, l’absence de possibilité d’utilisation au sein de l’équipe, y compris l’activation des résidents de la revitalisation. Il n’est pas adapté aux besoins des personnes handicapées et âgées. L’investissement permettra d’éliminer ce problème (entrée, toilettes, 2 m.parking) et d’introduire de nouveaux services. La revitalisation créera un centre culturel dédié au théâtre, au café, aux rencontres avec des organisations de groupes, qui permettra l’organisation d’événements culturels. Les chambres rénovées amélioreront l’accessibilité et la sécurité. Pr. aura un effet bénéfique sur l’environnement — raccordement au réseau central et eau-eau de la ville, éclairage energoszcz., isolation thermique, acoustique, p-humidité, terrain, petit archite. Investissement pour rewital. objet-pow. uz. 1 014,16 m², y compris la création dans un bâtiment en deux pièces: salle de spectacle et de formation pour les spectacles, vestiaire et installations sociales, salles de bureaux, chambres d’hôtes et techn.; cafés, entrepôts. Travaux — maçonnerie, travaux de rénovation et d’isolation, remplacement de menuiserie, modernisation du toit et des installations (sanitaires, thermiques, électriques), livraison et adaptation des wagons. Le projet ne prévoit pas d’espace pour les activités commerciales. Étapes du projet: poursuites en matière de construction, documentation (achevée), procédure d’appel d’offres, construction et livraison, adaptation des wagons, promotion, inspecteur de supervision (à mettre en œuvre). D’accord, d’accord. 500os/m-c participeront à des événements organisés à la Rampa, mercredi 3 événements/m-c, 1 zone sera revitalisée et adaptée aux besoins des personnes handicapées. Cible Gr. — résidents de la ville, y compris zone de revitalisation, touristes. Période de mise en œuvre 30.12.18-31.12.19. Le projet sera mis en œuvre par Goleniów. (French)
    3 December 2021
    0 references

    Identifiers

    RPZP.09.03.00-32-0040/18
    0 references