Research on glued wood construction elements made in new technology for the construction of wood objects by Konsbud in Stobno (Q137245)
Jump to navigation
Jump to search
Project Q137245 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Research on glued wood construction elements made in new technology for the construction of wood objects by Konsbud in Stobno |
Project Q137245 in Poland |
Statements
258,327.94 zloty
0 references
437,170.36 zloty
0 references
59.09 percent
0 references
1 November 2018
0 references
31 December 2019
0 references
"KONSBUD" PROJEKTOWANIE I REALIZACJA KONSTRUKCJI BUDOWLANYCH PRZEMYSŁAW ŻUROWSKI
0 references
Projekt będzie realizowany w siedzibie wnioskodawcy - hali produkcyjnej w Stobnie nr 55A, gmina Kołbaskowo, powiat policki. Przedmiotem projektu jest przeprowadzenie prac badawczo – rozwojowych nad opracowaniem nowej technologii łączenia drewnianych paneli w całe ściany/stropy/stropodachy, które będą łączone ze sobą na pióro-wpust oraz za pomocą dodatkowych łączników wprowadzonych w każde połączenie na etapie produkcji, a następnie, w ciągu 2 lat od zakończenia projektu, wdrożenie ich do produkcji. Realizacja projektu będzie trwać 9 m-cy (02.10.2017-29.06.2018), a jego realizacja zakłada realizację jednego zadania: Zad:1. Eksperymentalne prace rozwojowe – IV kwartał 2017–II kwartał 2018 Projekt jest na VII poziomie gotowości technologicznej. Jego realizacja zakłada dojście do pełnej gotowości (etap IX) i wiąże się z opracowaniem i wdrożeniem innowacji produktowej na skalę międzynarodową i procesowej na skalę krajową. Etapy realizacji projektu: • Projektowanie oraz badania modelowe; • Opracowanie prototypów; • Badania prototypów; • Stworzenie instrukcji technologicznych i procesowych do produkcji. Wnioskodawca dysponuje oraz będzie dysponował w oparciu o zasoby podwykonawcy odpowiednimi zasobami technicznymi i kadrowymi, zapewniającymi terminową realizacją projektu zgodnie z zaplanowanym zakresem rzeczowym. Wnioskodawca gwarantuje również zdolności organizacyjne do realizacji projektu zgodnie z jego celem. (Polish)
0 references
The project will be carried out at the premises of the applicant – production hall in Stobno no.55A, Kołbaskowo commune, police district. The subject of the project is to carry out research and development work on the development of a new technology of combining wooden panels into whole walls/tropes/stropods, which will be combined into a feather-inlet and by means of additional connectors introduced into each connection at the production stage, and then, within 2 years of the completion of the project, their implementation into production. The implementation of the project will last 9 months (02.10.2017-29.06.2018) and its implementation assumes a single task: Ass:1. Experimental development work – IV quarter 2017–II quarter 2018 The project is at the seventh level of technological readiness. Its implementation assumes full readiness (stage IX) and involves the development and implementation of product innovation on an international and process scale on a national scale. Stages of project implementation: • Design and model studies; • Development of prototypes; • Testing prototypes; • Creation of technological and process instructions for production. The applicant shall have at its disposal and shall have, on the basis of the subcontractor’s resources, adequate technical and personnel resources to ensure the timely implementation of the project in accordance with the planned material scope. The applicant shall also guarantee the organisational capacity to carry out the project in accordance with its purpose. (English)
21 October 2020
0 references
Le projet sera mis en œuvre dans les locaux de la requérante — le hall de production de Stobno no 55A, la commune de Kołbaskowo, le district de Policki. L’objet du projet est de mener des travaux de recherche et de développement sur le développement d’une nouvelle technologie de raccordement des panneaux de bois à des murs entiers/stropes/stropodes, qui seront reliés ensemble à une entrée de stylo et au moyen de connecteurs supplémentaires introduits dans chaque branchement au stade de la production, puis, dans un délai de 2 ans à compter de la fin du projet, leur mise en œuvre dans la production. La mise en œuvre du projet durera 9 mois (02.10.2017-29.06.2018) et sa mise en œuvre assumera une tâche: RAD:1. Développement expérimental — T4 2017 — T2 2018 Le projet est au 7e niveau de préparation technologique. Sa mise en œuvre implique une préparation complète (étape IX) et implique l’élaboration et la mise en œuvre d’innovations de produits à l’échelle internationale et à l’échelle nationale. Étapes de la mise en œuvre du projet: • Recherche sur la conception et les modèles; • Développement de prototypes; • Essais de prototypes; • Créer des instructions technologiques et de processus pour la production. Le demandeur dispose et disposera, sur la base des ressources du sous-traitant, de ressources techniques et humaines suffisantes pour assurer la mise en œuvre en temps utile du projet conformément au champ d’application matériel prévu. Le demandeur garantit également la capacité organisationnelle à mener à bien le projet conformément à son objectif. (French)
3 December 2021
0 references
Identifiers
RPZP.01.01.00-32-0018/17
0 references