“Providing broadband internet access in fibre technology in the Drawing County area” (Q86915)
Jump to navigation
Jump to search
Project Q86915 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | “Providing broadband internet access in fibre technology in the Drawing County area” |
Project Q86915 in Poland |
Statements
2,856,460.4 zloty
0 references
5,788,167.09 zloty
0 references
49.35 percent
0 references
1 October 2016
0 references
16 February 2019
0 references
E-CHO SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
ZAKRES PRZEDSIĘWZIĘCIA Projekt będzie realizowany na obszarze POPC01_321257 (woj. zachodniopomorskie, pow. drawski), na którym zidentyfikowano 2814 gosp. dom., które nie posiadają dostępu do Internetu NGA. Dla powyższego obszaru wyznaczono min. liczbę przyłączy jakie należy wykonać w ramach projektu na poziomie 1357 szt. Maksymalna kwota dofi. projektu wynosi 2.857.215,00 zł, a intensywność wsparcia - 55% wyd. kwalifik. W ramach planowanej inwestycji Wnioskodawca: - wybuduje sieć o długości 71 km, - obejmie zasięgiem sieci 1366 gosp. dom.HARMONOGRAM PROJEKTUProjekt będzie realizowany przez 24 miesiące – od 01.10.2016 r. do 30.09.2018 r. Zaplanowane prace podzielono na 7 zadań. Zadanie 1 i 2 będą realizowane przed rozpoczęciem projektu i obejmą: - przygot. dokument. niezbędnej do złożenia wniosku o dofin.,- wybór wykonawcy. ZASTOSOWANA TECHNOLOGIADobierając technologię budowy sieci, wykonawca brał pod uwagę:- wydajność,- niezawodność,- skalowalność i komplementarność,-koszty eksploatacji,- funkcjonalność i łatwość zarządzania.Wskazane czynniki zadecydowały o wyborze technologii FTTH, jako technologii, która zostanie wykorzystana do budowy przedmiotowej sieci.TRYB REALIZACJIProjekt będzie realizowany w trybie „zaprojektuj i wybuduj” - wszystkie prace projektowe, budowlane i instalacyjne zostaną zlecone wyłonionemu w ramach zbierania ofert wykonawcy.ZESPÓŁ PROJEKTOWYW celu prawidłowej realizacji projektu powstanie „Zespół projektowy”, którego zadaniem będzie:- monit. przebiegu realizacji inwestycji zgodnie z harmonogr.,- dokonywanie odbiorów prac,- rozliczanie projektu.W skład zespołu projektowego wejdą pracownicy:- Wnioskodawcy - 4 os.- firmy inProjects – 3 os.,- firmy ARVADO Consulting – 1 os. (Polish)
0 references
Scope OF THE PROTECTION The project will be implemented in the area of POPC01_321257 (West Pomeranian Voivodeship, drawski area), which identified 2814 housekeepers who do not have access to the NGA Internet. For the above area, min. number of connections to be made in the project at 1357 pcs. The maximum amount of the project is PLN 2,857,215.00 and the support intensity – 55 % of the qualifier. As part of the planned investment, the applicant: — will build a network with a length of 71 km, – will cover the network coverage of 1366 gosp. house.Project HARMONOGRAMThe project will be implemented for 24 months – from 01.10.2016 to 30.09.2018.The planned work has been divided into 7 tasks. Task 1 and 2 will be carried out before the start of the project and will include: — preparation. document. necessary to submit an application for dofin.,- selection of the contractor. The project is applied to the TECHNOLOGY – choosing the technology of the construction of the network, the contractor took into account:- efficiency,- reliability,- scalability and complementarity,- operating costs,- functionality and ease of management.Specified factors have decided to choose the technology FTTH, as the technology that will be used for the construction of the network. (English)
14 October 2020
0 references
Le projet sera mis en œuvre dans la zone POPC01_321257 (Voïvodie de Poméranie occidentale, région Drawski), dans laquelle 2814 maisons qui n’ont pas accès à l’Internet NGA ont été identifiées. Pour la zone ci-dessus, le nombre de connexions à effectuer dans le cadre du projet est de 1357. Le montant maximal du projet est de 2857 215,00 PLN et l’intensité de l’aide est de 55 % du montant éligible. Dans le cadre de l’investissement prévu, le demandeur doit: — va construire un réseau de 71 km, — il couvrira le réseau 1366 gosp. dom.HARMONOGRAM ProjectLe projet sera mis en œuvre pendant 24 mois — du 1.10.2016 au 30.09.2018. Les travaux prévus sont divisés en 7 tâches. Les activités 1 et 2 seront mises en œuvre avant le début du projet et comprendront: — préparation du document. nécessaire pour soumettre la demande d’amélioration.- sélection du contractant. Lors de l’utilisation de TECHNOLOGIAD, le contractant a pris en compte:- la performance,- la fiabilité,- l’évolutivité et la complémentarité,- les coûts d’exploitation,- la fonctionnalité et la facilité de gestion. Les facteurs indiqués ont décidé du choix de la technologie FTTH comme technologie à utiliser pour la construction du réseau en question. une «équipe de projet» sera créée. La tâche du projet sera:- d’accélérer la mise en œuvre de l’investissement conformément à harmonogr.,- d’effectuer l’acceptation des travaux,- de comptabiliser le projet. L’équipe de projet comprendra des employés:- les demandeurs — 4 personnes — les projets — 3 personnes,- ARVADO Consulting — 1 personne. (French)
30 November 2021
0 references
Identifiers
POPC.01.01.00-32-0284/16
0 references