Elimination of territorial disparities in high-speed broadband access in the Leszno subregion, ID: 3.4.30.59 (Q86892)
Jump to navigation
Jump to search
Project Q86892 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Elimination of territorial disparities in high-speed broadband access in the Leszno subregion, ID: 3.4.30.59 |
Project Q86892 in Poland |
Statements
40,613,312.96 zloty
0 references
47,780,368.19 zloty
0 references
85.0 percent
0 references
17 February 2017
0 references
30 September 2020
0 references
INEA S.A.
0 references
Projekt dotyczy budowy na terenie NUTS-3 – podregionie leszczyński, ID: 3.4.30.59. w powiatach: gostyńskim, grodziskim, kościańskim, leszczyńskim, Leszno, międzychodzkim, nowotomyskim, rawickim i wolsztyńskim (zwanym dalej Obszarem Interwencji) sieci szerokopasmowej w technologii kablowej (dla gospodarstw domowych oraz jednostek oświatowych bez litery A oraz części z literą A ) i bezprzewodowej (dla wybranych placówek oświatowych z literką A) o łącznej długości 2 318,78 km. W wyniku realizacji projektu 40 272 gospodarstw domowych oraz 155 placówek oświatowych uzyskają dostęp do Internetu. 40 272 gospodarstw uzyska dostęp do sieci o parametrach co najmniej 100 Mb/s,. Wszystkie placówki oświatowe wskazane do podłączenia uzyskają przepustowość min. 100Mb/s (symetryczne). Głównym celem projektu jest realizacja sieci dostępowych, które będą wykorzystane przez INEA S.A. do świadczenia usług detalicznych oraz zostaną udostępnione wszystkim zainteresowanym operatorom detalicznym (operatorom korzystającym) na zasadach dostępu hurtowego. W ramach projektu zakłada się zaprojektowanie oraz wybudowanie na Obszarze Interwencji sieci szerokopasmowego Internetu, doprowadzając w efekcie do maksymalizacji pokrycia kraju nowoczesnymi sieciami dostępowymi NGA. (Polish)
0 references
The project concerns construction in NUTS-3 – Leszczyński subregion, ID: 3.4.30.59. in powiats: Gostyn, Grodziski, Kościan, Leszczyński, Leszno, inter-original, Novotomskie, Rawicki and Wolsztyn (hereinafter referred to as the Intervention Area) broadband network in cable technology (for households and educational units without A, and parts with A) and wireless (for selected educational establishments with letter A) with a total length of 2318.78 km. As a result of the project, 40,272 households and 155 educational establishments will have access to the Internet. 40 272 farms will have access to a network of at least 100 Mbps. All educational establishments indicated for connection will have a capacity of at least 100Mb/s (symmetrical). The main objective of the project is to implement access networks, which will be used by INEA S.A. to provide retail services and will be made available to all interested retail operators (using operators) on the basis of wholesale access. The project assumes the design and construction of broadband Internet network in the Intervention Area, resulting in the maximisation of coverage of the country with modern NGA access networks. (English)
14 October 2020
0 references
Le projet concerne la construction dans la sous-région NUTS-3 — Leszczyński, ID: 3.4.30.59. dans les comtés: Gostyń, Grodziski, Kościanski, Leszno, interphone, Nowytomyski, Rawice et Volsztyn (ci-après dénommé «zone d’intervention») réseau à large bande en technologie câblée (pour les ménages et les unités éducatives sans lettre A et parties avec la lettre A) et sans fil (pour certains établissements d’enseignement ayant la lettre A) d’une longueur totale de 2 318,78 km. Grâce à ce projet, 40 272 ménages et 155 établissements d ' enseignement auront accès à Internet. 40 272 exploitations bénéficient d’un accès à des réseaux d’au moins 100 Mbps. Tous les établissements d’enseignement indiqués pour la connexion auront une capacité d’au moins 100 Mbps (symétrique). L’objectif principal du projet est la mise en place de réseaux d’accès, qui seront utilisés par INEA S.A. pour fournir des services de détail et seront mis à la disposition de tous les opérateurs de détail (utilisateurs) intéressés sur la base de l’accès de gros. Le projet comprend la conception et la construction d’un réseau Internet à large bande dans la zone d’intervention, ce qui a permis d’optimiser la couverture du pays avec des réseaux d’accès NGA modernes. (French)
30 November 2021
0 references
Identifiers
POPC.01.01.00-30-0143/17
0 references