Elimination of territorial differences in high-speed broadband coverage in the Boleslawiet district POPC01 (Q86772)
Jump to navigation
Jump to search
Project Q86772 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Elimination of territorial differences in high-speed broadband coverage in the Boleslawiet district POPC01 |
Project Q86772 in Poland |
Statements
4,065,796.13 zloty
0 references
6,665,239.63 zloty
0 references
61.0 percent
0 references
29 February 2016
0 references
31 July 2018
0 references
ALIAS SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
Projekt dotyczy budowy na terenie powiatu bolesławieckiego (POPC01_020329) sieci szerokopasmowej o łącznej długości 56,18 km. Zakres przedsięwzięcia obejmuje budowę sieci szerokopasmowego Internetu o wysokich przepustowościach na obszarze powiatu bolesławieckiego, która obejmie zasięgiem 1474 gospodarstw domowych oraz 2 placówki edukacyjne i placówki służby zdrowia oraz budowę 2 węzłów dostępowych. Projekt realizowany będzie w ramach zadań: zaprojektowanie sieci zapewniającej możliwość dostępu do szerokopasmowego Internetu o wysokich przepustowościach w powiecie bolesławieckim; budowa pasywnej infrastruktury szerokopasmowej wraz z dostawą i montażem pasywnych elementów infrastruktury szerokopasmowej w powiecie bolesławieckim; dostawa i montaż urządzeń telekomunikacyjnych stanowiących infrastrukturę aktywną sieci NGA w powiecie bolesławieckim; opracowanie dokumentacji powykonawczej dla prac przeprowadzonych w ramach projektu realizowanego w powiecie bolesławieckim. W wyniku realizacji projektu Wnioskodawca planuje stworzyć kompletną infrastrukturę Internetu szerokopasmowego i rozpocząć oferowanie świadczenia usług hurtowego dostępu do szerokopasmowego Internetu o wysokich przepustowościach na wskazanym we wniosku terenie projektu, co przyczyni się do wyeliminowania terytorialnych różnic na terenie Polski w możliwości dostępu do Internetu szerokopasmowego, o wysokich przepustowościach. Sieć telekomunikacyjna została zaplanowana z uwzględnieniem wykorzystania nowoczesnych technologii budowy sieci szerokopasmowych, zoptymalizowanych pod kątem budowy sieci światłowodowej FTTH (Fiber to the Home). FTTH to koncepcja zakładająca dostarczenie przewodów światłowodowych do każdego domu z osobna, gwarantując najwyższą możliwą do osiągnięcia obecnie prędkość przesyłu danych. Tym samym realizowany będzie cel ogólny I osi POPC oraz cele działania 1.1.Okres realizacji: 01.07.2016 r. – 30.06.2018 r. (Polish)
0 references
The project concerns the construction of a broadband network with a total length of 56.18 km (POPC01_020329) in the Boleslawieckie district. The scope of the project includes the construction of high-capacity broadband Internet network in the Boleslawieckie district, which will cover 1474 households and 2 educational and health care establishments and the construction of 2 access nodes. The project will be implemented as part of the following tasks: designing a high-speed broadband network in the Boleslawiet district; the construction of passive broadband infrastructure together with the delivery and assembly of passive broadband infrastructure elements in the Boleslawiet district; supply and assembly of telecommunications equipment which is an active infrastructure of the NGA network in the Boleslawiet district; preparation of post-executive documentation for works carried out within the framework of the project carried out in the Bolesławiec district. As a result of the project, the applicant plans to create a complete broadband infrastructure and start offering wholesale high-speed broadband access services on the project indicated in the proposal, which will help to eliminate territorial differences in the high-speed broadband access possibilities in Poland. The telecommunications network was planned to take into account the use of modern broadband technologies, optimised for the construction of the FTTH (Fiber to the Home) fibre network. FTTH is the concept of providing fiber optic cables to each house separately, guaranteeing the highest speed of data transmission currently possible. The general objective of the POPC axis I and the objectives of Action 1.1 will be pursued. 01.07.2016-30.06.2018 (English)
14 October 2020
0 references
Le projet concerne la construction d’un réseau à large bande d’une longueur totale de 56,18 km dans le district de Boleslawiecki (POPC01_020329). Le projet comprend la construction d’un réseau Internet haut débit à haut débit dans le district de Boleslawieckie, qui couvrira l’éventail de 1474 ménages et de 2 établissements d’enseignement et de santé, ainsi que la construction de 2 nœuds d’accès. Le projet sera réalisé dans le cadre des tâches suivantes: la conception d’un réseau permettant l’accès à l’internet à haut débit dans le comté de Boleslawieckie; la construction d’infrastructures passives à haut débit ainsi que la fourniture et l’installation d’éléments d’infrastructure passive à haut débit dans le comté de Boleslawiecki; fourniture et installation d’équipements de télécommunications constituant une infrastructure active de réseaux NGA dans le comté de Boleslawiecki; préparation de la documentation as-construite pour les travaux réalisés dans le cadre d’un projet réalisé dans le comté de Boleslawieckie. À la suite du projet, la requérante prévoit de créer une infrastructure Internet à large bande complète et de commencer à offrir des services d’accès à l’internet haut débit à haut débit de gros sur le site du projet indiqué dans la demande, ce qui contribuera à éliminer les différences territoriales en Pologne en ce qui concerne la possibilité d’accès à haut débit. Le réseau de télécommunications a été planifié en tenant compte de l’utilisation des technologies modernes pour la construction de réseaux à large bande, optimisés pour la construction de fibre optique FTTH (Fiber to the Home). FTTH est le concept de fournir des câbles à fibre optique à chaque maison individuellement, garantissant la vitesse de transfert de données la plus élevée qui peut actuellement être atteinte. Ce faisant, l’objectif général de l’axe I du OPPC et les objectifs de l’action 1.1.Durée: 01/07/2016-30/06/2018 (French)
30 November 2021
0 references
Identifiers
POPC.01.01.00-02-0326/16
0 references