Construction of WSS infrastructure in the separate area served by Water Supply and Sewerage EOOD, Vidin (Q3832241)
Jump to navigation
Jump to search
Project Q3832241 in Bulgaria
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of WSS infrastructure in the separate area served by Water Supply and Sewerage EOOD, Vidin |
Project Q3832241 in Bulgaria |
Statements
15,246,929.81 Bulgarian lev
0 references
19,722,445.83 Bulgarian lev
0 references
0.77 percent
0 references
5 September 2019
0 references
5 March 2024
0 references
0 references
Общо, за Агломерация Видин, се предвиждат следните мерки:-по компонент Водоснабдяване:•подмяна на съществуващия довеждащ водопровод ф900мм стомана с PVC_O тръби с диаметър Ф630mm, L = 10, 372 km с PN 12,5 atm;•подмяна на съществуващите две етернитови тръби ф536 mm и на съществуващите две стоманени тръби ф630 mm с ф500mm PVC_O тръби с PN 12,5 atm и обща дължина L = 4,149 km; L обща=14,521km.-по компонент Събиране на отпадъчни води се предвижда:•реконструкция на част от Главен Колектор II с яйцевиден профил 1520/2400 mm и 1120/2150 mm. Той ще бъде подменен с канал от GRP с ф1800mm с дължина L = 1,356km и участък с РР тръби 2xф1000mm с L =94m при преминаване под ж.п. линията; L обща=1,450 km.-по компонент Пречистване на отпадъчни води не са предвидени инвестиционни мерки. ПСОВ е в процес на изграждане. (Bulgarian)
0 references
In total, for the Vidin agglomeration, the following measures are foreseen:-by component Water supply: •replacement of the existing lead pipe ph900 mm with PVC_O pipes with diameter F630mm, L = 10.372 km with PN 12.5 atm;•replacement of the existing two etherite pipes f536 mm and of the existing two steel pipes f630 mm by f500 mm PVC_O pipes with PN 12.5 atm and total length L = 4.149 km; L total=14.521 km.-by component Wastewater collection is foreseen: •Reconstruction of a part of Master Collector II with an egg profile of 1520/2400 mm and 1120/2150 mm. It will be replaced by a GRP channel with f1800 mm with length L = 1.356 km and PP section 2x1000 mm with L =94 m when crossing the line; L total = 1.450 km.- by component Wastewater treatment no investment measures are foreseen. The WWTP is under construction. (English)
2 December 2021
0 references
Au total, pour l’agglomération de Vidin, les mesures suivantes sont prévues:-par composant Approvisionnement en eau: • remplacement du tuyau de plomb existant ph900 mm par des tuyaux PVC_O de diamètre F630mm, L = 10,372 km par PN 12,5 atm;• remplacement des deux tuyaux en éthrite existants f536 mm et des deux tubes en acier f630 mm par f500 mm PVC_O avec PN 12,5 atm et longueur totale L = 4,149 km; L=14,521 km.-par composant La collecte des eaux usées est prévue: •Reconstruction d’une partie du Maître collecteur II avec un profil d’œuf de 1520/2400 mm et 1120/2150 mm. Il sera remplacé par un chenal GRP avec f1800 mm avec une longueur L = 1,356 km et une section PP 2x1000 mm avec L =94 m lors du franchissement de la ligne; L total = 1,450 km.- par composante Traitement des eaux usées Aucune mesure d’investissement n’est prévue. La station d’épuration est en cours de construction. (French)
3 December 2021
0 references
Видин
0 references
Identifiers
BG16M1OP002-1.016-0006
0 references