Lot 31 “Road II-53 Polykraishte — Elena — Sliven from km 34+ 400 to km 46+ 290 and km 72+ 200 to km 87+ 301, with a total length of 26.991 km, districts of Sliven and Veliko Tarnovo” (Q3835721)

From EU Knowledge Graph
Revision as of 09:30, 3 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q3835721 in Bulgaria
Language Label Description Also known as
English
Lot 31 “Road II-53 Polykraishte — Elena — Sliven from km 34+ 400 to km 46+ 290 and km 72+ 200 to km 87+ 301, with a total length of 26.991 km, districts of Sliven and Veliko Tarnovo”
Project Q3835721 in Bulgaria

    Statements

    0 references
    12,825,126.35 Bulgarian lev
    0 references
    6,540,814.44 Euro
    1 December 2021
    0 references
    28,393,079.88 Bulgarian lev
    0 references
    14,480,470.74 Euro
    1 December 2021
    0 references
    0.45 percent
    0 references
    2 October 2020
    0 references
    2 October 2022
    0 references
    0 references
    Основна цел на настоящото проектно предложение е рехабилитация на Път II-53 Поликраище - Елена - Сливен от км 34+400 до км 46+290 и от км 72+200 до км 87+301, подобряване и модернизация на технико-експлоатационните характеристики на отсечката и постигане на еднородност на пътната настилка. Реализацията на проекта ще доведе до: повишаване на мобилността на населението, увеличаване на инвестициите в региона, създаване на нови работни места, подобряване на състоянието на околната среда чрез намаляване на отделянето на вредни емисии на парникови газове и възможност за по-голям избор до здравни и образователни услуги на местното население, както и стимулиране развитието на туризъм. Чрез реализацията на рехабилитация на път II-53 ще бъдат удовлетворени потребностите на населението на Югоизточен и Северен централен район на България, най-вече на жителите на области Сливен и Велико Търново, както и транзитно преминаващите през региона.Основните дейности, които са заложени за успешната реализацията по проекта са:- Сформиране на екип за управление на проекта, които да управлява и координира всички дейности и участници в реализацията на инвестиционното предложение;- Избор на Изпълнител за извършване на строително монтажни работи, подписване на договор с него и извършване на рехабилитация на обекта;- Избор на Изпълнител на строителен надзор (Консултант) на проекта, подписване на договор с него и извършване на консултантски услуги;- Осъществяване на авторски надзор на обекта;-Изпълнение на мерките по информация и публичност на проекта;- Въвеждане на обекта в експлоатация, верификация на разходите и отчитане на постигнатите резултати; (Bulgarian)
    0 references
    The main objective of this project proposal is the rehabilitation of Road II-53 Polykraishte — Elena — Sliven from km 34+ 400 to km 46+ 290 and km 72+ 200 to km 87+ 301, improvement and modernisation of the technical and operational characteristics of the section and achieving uniformity of the road surface. The implementation of the project will lead to: increasing the mobility of the population, increasing investment in the region, creating new jobs, improving the state of the environment by reducing the emission of harmful greenhouse gas emissions and allowing more choice to health and education services for the local population, as well as stimulating the development of tourism. Through the implementation of rehabilitation of road II-53 will be met the needs of the population of the South-East and North-Central region of Bulgaria, especially the residents of the districts of Sliven and Veliko Tarnovo, as well as those transiting through the region. The main activities set for the successful implementation of the project are:- Forming a project management team to manage and coordinate all activities and participants in the implementation of the investment proposal;- Selection of a contractor for carrying out construction works, signing a contract with it and carrying out rehabilitation of the site;- Choosing the contractor of construction supervision (Consultant) of the project, signing a contract with it and carrying out consulting services;- Implementation of the measures on information and publicity of the project;- Introduction of the site into operation, verification of costs and reporting of the results achieved; (English)
    2 December 2021
    0 references
    L’objectif principal de cette proposition de projet est la réhabilitation de la route II-53 Polykraishte — Elena — Sliven du km 34+ 400 au km 46+ 290 et du km 72+ 200 au km 87+ 301, l’amélioration et la modernisation des caractéristiques techniques et opérationnelles du tronçon et l’uniformité du revêtement de la route. La mise en œuvre du projet permettra: accroître la mobilité de la population, accroître les investissements dans la région, créer de nouveaux emplois, améliorer l’état de l’environnement en réduisant les émissions de gaz à effet de serre nocifs et en permettant un plus grand choix de services de santé et d’éducation pour la population locale, ainsi qu’en stimulant le développement du tourisme. Grâce à la remise en état de la route II-53, il sera satisfait aux besoins de la population de la région du Sud-Est et du Centre-Nord de la Bulgarie, en particulier des habitants des districts de Sliven et Veliko Tarnovo, ainsi que de ceux qui transitent par la région. Les principales activités prévues pour la mise en œuvre réussie du projet sont les suivantes:- Mise en place d’une équipe de gestion de projet chargée de gérer et de coordonner toutes les activités et les participants à la mise en œuvre de la proposition d’investissement;- la sélection d’un entrepreneur pour la réalisation des travaux de construction, la signature d’un contrat avec lui et la remise en état du site;- le choix de l’entrepreneur chargé de la supervision de la construction (conseiller) du projet, la signature d’un contrat avec celui-ci et la prestation de services de conseil;- la mise en œuvre des mesures d’information et de publicité du projet;- l’introduction du chantier en exploitation, la vérification des coûts et la communication des résultats obtenus;— (French)
    3 December 2021
    0 references
    Северна и югоизточна България
    0 references

    Identifiers

    BG16RFOP001-7.001-0031
    0 references