Project preparation: Road I-1/E-79/“Vidin-Montana-Vratsa” (Q3835710)

From EU Knowledge Graph
Revision as of 09:30, 3 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q3835710 in Bulgaria
Language Label Description Also known as
English
Project preparation: Road I-1/E-79/“Vidin-Montana-Vratsa”
Project Q3835710 in Bulgaria

    Statements

    0 references
    1,738,014.8 Bulgarian lev
    0 references
    886,387.55 Euro
    1 December 2021
    0 references
    2,044,723.3 Bulgarian lev
    0 references
    1,042,808.88 Euro
    1 December 2021
    0 references
    0.85 percent
    0 references
    1 January 2014
    0 references
    31 December 2021
    0 references
    0 references
    Трасето „Видин–Димово–Бела–Ружинци–Монтана“, предмет на Проекта е част от Транс-европейски транспортен коридор „Ориент/Източно-средиземноморски“ съгласно Регламент /ЕС/ 1315/2013. Начало на трасето е краят на инфраструктурата на Дунав мост 2, а край - началото на обход на гр. Монтана (от страна Видин). Проектът включва модернизация на съществуващия път, изграждане на обходи на населените места, пресичания на две нива и включване и отделяне посредством пътни възли. Към настоящия момент път Е-79 е с непостоянен габарит, отсечки в различно експлоатационно състояние и трасе, преминаващо през населени места. Изброените факти водят до непостоянна ниска скорост, задръствания, ПТП, негативни екологични въздействия, което не удовлетворява изискванията за път от основната транс-европейска транспортна мрежа съгласно Регламент (ЕС) № 1315/2013 на Европейския парламент и на Съвета от 11 декември 2013 година относно насоките на Съюза за развитието на транс-европейската транспортна мрежа и за отмяна на Решение № 661/2010/ЕС (1). Предмет на настоящото проектно предложение е осигуряване на пълна проектна готовност за модернизацията на четирите участъка: Видин-Димово, Димово-Бела-Ружинци и Ружинци-Монтана с обща дължина около 95 км. Техническите параметри на пътя са следните: проектна скорост 120 км/час; пътен габарит Г-28 и товароносимост на пътната настилка 11,5 т/ос. Изпълнението на проекта включва: проектиране –идеен и технически проект, изработване на Доклад за ОВОС и ДОСВ, археологически проучвания, изработване на комплексен доклад за оценка на съответствието и технически контрол по част „Конструктивна“, изготвяне на планове за управление на околната среда и за собствен екологичен мониторинг на ОС, извършване на Одит по пътната безопасност на фаза идеен и технически проект, изготвяне на план за управление на строителните отпадъци, изпълнение на мерки за информиране и публичност и управление на проекта. Периодът на изпълнение на проекта е от 01.01.2014г. до 31.12.2021 г. (Bulgarian)
    0 references
    The Vidin-Dimovo-Beela-Ruzhintsi-Montana route is part of the Trans-European Transport Corridor “Orient/East-Mediterranean” according to Regulation/EU/1315/2013. The beginning of the route is the end of the infrastructure of Danube Bridge 2 and the end — the beginning of a bypass of the town of Montana (on the Vidin side). The project includes the modernisation of the existing road, the construction of city bypasses, two-level crossings and the inclusion and separation by means of road nodes. At present, the E-79 road has a non-permanent gauge, sections in different operating conditions and a route passing through settlements. The listed facts lead to erratic low speed, congestion, SSTBs, negative environmental impacts that do not meet the road requirements of the core trans-European transport network pursuant to Regulation (EU) No 1315/2013 of the European Parliament and of the Council of 11 December 2013 on Union guidelines for the development of the trans-European transport network and repealing Decision No 661/2010/EU (1). The subject of this project proposal is to ensure full project readiness for the modernisation of the four sections: Vidin-Dimovo, Dimovo-Beela-Ruzhintsi and Ruzhinci-Montana with a total length of about 95 km. The technical parameters of the road are as follows: design speed 120 km/h; road gauge G-28 and load capacity of road surface 11.5 t/axle. The implementation of the project includes: conceptual and technical design, preparation of EIA and SEW report, archaeological studies, preparation of a comprehensive conformity assessment report and technical control under the “Constructive part”, preparation of environmental management plans and own environmental monitoring of the AA, carrying out a road safety audit at the conceptual and technical design phase, preparation of a plan for management of construction waste, implementation of information and publicity measures and management of the project. The implementation period of the project runs from 1 January 2014 to 31 December 2021. (English)
    2 December 2021
    0 references
    La liaison Vidin-Dimovo-Beela-Ruzhintsi-Montana fait partie du corridor transeuropéen de transport «Orient/Méditerranée orientale» conformément au règlement/UE/1315/2013. Le début de la route est la fin de l’infrastructure du pont 2 du Danube et la fin — le début d’un contournement de la ville du Montana (côté Vidin). Le projet comprend la modernisation de la route existante, la construction de contournements urbains, des passages à niveau à deux niveaux et l’inclusion et la séparation au moyen de nœuds routiers. À l’heure actuelle, la route E-79 a un écartement non permanent, des tronçons dans des conditions d’exploitation différentes et une route passant par des colonies de peuplement. Les faits énumérés conduisent à une faible vitesse erratique, à des encombrements, à des TBSS, à des incidences négatives sur l’environnement qui ne répondent pas aux exigences routières du réseau transeuropéen de transport central conformément au règlement (UE) no 1315/2013 du Parlement européen et du Conseil du 11 décembre 2013 sur les orientations de l’Union pour le développement du réseau transeuropéen de transport et abrogeant la décision no 661/2010/UE (1). La présente proposition de projet a pour objet d’assurer la pleine préparation du projet à la modernisation des quatre sections: Vidin-Dimovo, Dimovo-Beela-Ruzhintsi et Ruzhinci-Montana d’une longueur totale d’environ 95 km. Les paramètres techniques de la route sont les suivants: vitesse de conception 120 km/h; écartement routier G-28 et capacité de charge du revêtement routier 11,5 t/essieu. La mise en œuvre du projet comprend: conception conceptuelle et technique, élaboration d’un rapport EIE et rapport SEW, études archéologiques, élaboration d’un rapport complet d’évaluation de la conformité et contrôle technique dans le cadre de la «partie constructive», élaboration de plans de gestion de l’environnement et propre surveillance de l’environnement de l’AA, réalisation d’un audit de la sécurité routière lors de la phase de conception conceptuelle et technique, élaboration d’un plan de gestion des déchets de construction, mise en œuvre de mesures d’information et de publicité et gestion du projet. La période de mise en œuvre du projet va du 1er janvier 2014 au 31 décembre 2021. (French)
    3 December 2021
    0 references
    ВидинВрацаМонтана
    0 references

    Identifiers

    BG16M1OP001-5.001-0009
    0 references