121,837.5 Bulgarian lev
0 references
180,500.0 Bulgarian lev
0 references
0.68 percent
0 references
17 December 2020
0 references
17 December 2022
0 references
Проекта предвижда създаване на високо технологичен цех за производство на мебели от масивно дърво. Цеха ще се помещава в гр. Айтос, общ. Айтос, обл. Бургас, а именно: Две помещения с площ 144 м² и 72 м² намиращи се едно до друго и свързани помежду си, имащи отделен вход васяко едно към рампа на северната едноетажна част на Главен Корпус Инв.№1 находящ се в централната част на УПИ II – 307от кв. 259, включваща едноетажна част със ЗП 6615 м² и РЗП 6615 м² и двуетажна част – хладилник със ЗП 883 м² и РЗП 1766 м² или общо ЗП 7498 м² и РЗП 8381 м²Ще бъдат закупени :-Форматен циркуляр за дървени плоскости – 1бр.;-Машина за рязане на трупи – 1бр.;-Разкрояваща цифрова машина за дървени плоскости – 1бр.;-Вентилационна филтрираща система – 1бр.;-Пелетираща машина – 1бр.;-Калибрираща машина за дървени плоскости – 1р.;-Полираща машина за дървени плоскости – 1бр.;-Ръчна преса за слепване на дървени плоскости – 1бр.;-Струг за дървени плоскости – 1бр.;Ще бъдат назначени 4 нови работници. За производството е предвидена пневмотранспортна инсталация, за улавяне на дървесните частици, отделяни при обработката на ПДЧ плоскостите. За целта ще се монтира система от въздуховоди свързваща дървообработващите машини в цеха с циклона и бункера, разположени вън от сградата.За производството е предвидена инсталация за сгъстен въздух. Изпълнението е предвидено с тръби и фитинги от полипропилен.Режим на работа на предприятието, ще, е 252 дни годишно на една работна смяна, при продължителност на работната смяна 8 часа. Избрано технологично оборудване. отговаря на съвременните норми и изисквания на предприятията от бранша. (Bulgarian)
0 references
The project provides for the creation of a high-tech workshop for the production of solid wood furniture. The workshop will be housed in the town of Aytos, municipality. Aytos, region. Burgas, namely: Two rooms with an area of 144 m² and 72 m² located side by side and connected to each other, having a separate entrance, one to the ramp of the northern one-storey part of Main Corps Inv. No. 1 located in the central part of R & D II — 307 of sq. 259, comprising a one-storey part with DF 6 615 m² and total area of 6 615 m² and a two-storey part — refrigerator with 883 m² and total area of 1 766 m² or total FD 7 498 m² and total area of 8 381 m²will be purchased:-Formal circular saw for wooden boards — 1 piece;- Log cutting machine — 1pcs.;-Decision digital wood board machine — 1pc;-Ventilation filtering system — 1pcs;-Pelting machine — 1pcs;-Calibrating machine for wooden boards — 1p.;-Polishing machine for wooden boards — 1pcs;-Manual press for gluing wooden boards — 1 piece;- Wood panel lathe — 1pcs.;-will be recruited 4 new workers. For the production, a pneumatic transport installation is provided for the capture of particles emitted during the processing of chipboards. For this purpose, a system of air ducts connecting woodworking machines will be installed in the workshop with the cyclone and the bunker located outside the building. The performance is provided with pipes and fittings of polypropylene.The working mode of the enterprise, will, is 252 days per year on one shift, with the duration of the working shift 8 hours. Selected technological equipment. meets the modern norms and requirements of the enterprises in the industry. (English)
2 December 2021
0 references
Le projet prévoit la création d’un atelier de haute technologie pour la production de meubles en bois massif. L’atelier sera logé dans la ville d’Aytos, municipalité. Aytos, région. Burgas, à savoir: Deux chambres d’une superficie de 144 m² et 72 m² situées côte à côte et reliées l’une à l’autre, ayant une entrée séparée, une à la rampe de la partie nord d’un étage du Main Corps Inv. no 1 située dans la partie centrale de R & D II — 307 de m². 259, comprenant une partie d’un étage avec 6 615 m² DF et une superficie totale de 6 615 m² et une partie de deux étages — réfrigérateur de 883 m² et d’une superficie totale de 1 766 m² ou d’une superficie totale de 7 498 m² et d’une superficie totale de 8 381 m² seront achetées:-Scie circulaire formelle pour planches en bois — 1 pièce;- Machine à découper en rondins — 1pcs;-Machine numérique de bois de décision — 1pc; système de filtrage — 1pcs;-Machine à piéger — 1pcs;-Machine de calibrage pour les planches en bois — 1p.;-Machine de polissage pour planches en bois — 1pcs;-presse manuelle pour coller des planches en bois — 1 pièce;- Tour de panneau de bois — 1pcs;- seront recrutés 4 nouveaux travailleurs. Pour la production, une installation de transport pneumatique est prévue pour le captage des particules émises lors du traitement des panneaux agglomérés. À cette fin, un système de conduits d’air reliant les machines à bois sera installé dans l’atelier avec le cyclone et le bunker situé à l’extérieur du bâtiment. La performance est fournie avec des tuyaux et des raccords en polypropylène. Le mode de travail de l’entreprise, sera, sera, 252 jours par an sur un quart, avec la durée du quart de travail 8 heures. Équipement technologique sélectionné. répond aux normes et exigences modernes des entreprises dans l’industrie. (French)
3 December 2021
0 references
Айтос
0 references
Identifiers
BG06RDNP001-19.270-0004