Investment project for construction of UWTP and completion of sewerage network in Tutrakan (Q3888328)

From EU Knowledge Graph
Revision as of 22:50, 2 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en, and other parts: Adding en translations)
Jump to navigation Jump to search
Project Q3888328 in Bulgaria
Language Label Description Also known as
English
Investment project for construction of UWTP and completion of sewerage network in Tutrakan
Project Q3888328 in Bulgaria

    Statements

    0 references
    19,274,145.58 Bulgarian lev
    0 references
    9,829,814.25 Euro
    1 December 2021
    0 references
    26,796,815.66 Bulgarian lev
    0 references
    13,666,375.99 Euro
    1 December 2021
    0 references
    0.72 percent
    0 references
    4 April 2018
    0 references
    4 March 2022
    0 references
    0 references
    0 references
    Чрез изпълнение на проектното предложение за инженеринг ще се изгради пречиствателна станция и ще се доизгради изцяло канализационната мрежа в гр. Тутракан. Ще бъде подменена амортизиралата водопроводна мрежа по улиците, по които ще се извършва реконструкция и изграждане на канализационната мрежа. Основните дейности, включени в проекта са: изготвяне на документации за обществени поръчки за целите на проекта, в съответствие с изменената нормативна уредба в областта на обществените поръчки; осъществяване на проектантска дейност и строителство по проект: "Инвестиционен проект за изграждане на ГПСОВ и доизграждане на канализационна мрежа в гр. Тутракан"; строителен и авторски надзор, а при приключването им ще се достави оборудване за новоизградената инфраструктура. Съгласно Единен наръчник на бенефициента за прилагане на правилата за информация и комуникация на проекти, финансирани по Оперативна програма "Околна среда 2014-2020г." ще бъде проведена информационна кампания , с цел осигуряване на публичност на проекта. Цялостната организация и управление на проекта ще бъде извършена както от екип на община Тутракан, така и чрез външни експерти (процедура по ЗОП за техническа помощ). Конкретни резултати от изпълнението на проекта: - новопостроена ПСОВ - 1 бр. - рехабилитирана водопроводна мрежа - 4927 m.- рехабилитирани сградни водопроводни отклонения- 261 броя - новопостроена канализационна мрежа -2242 m.- рехабилитирана канализационна мрежа -4528 m.- нови сградни канализационни отклонения - 60 броя- рехабилитирани канализационни отклония- 176 броя- изграден довеждащ колектор до ПСОВ - 0.391 km.- Допълнителен брой жители, които ще бъдат присъединени към каналзиционната мрежа - 264 жители- Брой екв. жители, коите ще бъдат свързани към ПСОВ- 10 337 е.ж. (Bulgarian)
    0 references
    By implementing the project proposal for engineering, a treatment plant will be built and the sewerage network in Tutrakan will be completed. The depreciated water supply network will be replaced on the streets on which reconstruction and construction of the sewerage network will be carried out. The main activities included in the project are: preparation of procurement documents for the purposes of the project, in accordance with the amended public procurement regulations; implementation of design and construction activities under a project: “Investment project for construction of UWTP and completion of sewerage network in Tutrakan”; construction and author’s supervision and at their completion will be supplied equipment for the newly built infrastructure. According to the Beneficiary’s Single Manual on the application of the rules for information and communication of projects financed under Operational Programme Environment 2014-2020, an information campaign will be carried out to ensure publicity of the project. The overall organisation and management of the project will be carried out both by a team of Tutrakan Municipality and through external experts (PPA procedure for technical assistance). Concrete results of the implementation of the project: — newly built WWTP — 1 pcs. — rehabilitated water supply network — 4 927 m.- rehabilitated building plumbing deviations — 261 pieces — newly built sewerage network — 2 242 m.- rehabilitated sewerage network — 4 528 m. — new building sewerage deviations — 60 units — rehabilitated sewerage diversions — 176 pieces — built a collector to the WWTP — 0.391 km.- Additional number of inhabitants, which will be connected to the sewerage network — 264 inhabitants- Number of residents who will be connected to WWTP — 10 337 e.g. (English)
    2 December 2021
    0 references
    Тутракан
    0 references

    Identifiers

    BG16M1OP002-1.009-0002
    0 references