Construction of composting plant and pretreatment plant for municipal waste for the needs of RSUO-Region Botevgrad (Q3884181)

From EU Knowledge Graph
Revision as of 22:45, 2 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en, and other parts: Adding en translations)
Jump to navigation Jump to search
Project Q3884181 in Bulgaria
Language Label Description Also known as
English
Construction of composting plant and pretreatment plant for municipal waste for the needs of RSUO-Region Botevgrad
Project Q3884181 in Bulgaria

    Statements

    0 references
    6,154,024.14 Bulgarian lev
    0 references
    3,138,552.31 Euro
    1 December 2021
    0 references
    8,048,947.64 Bulgarian lev
    0 references
    4,104,963.3 Euro
    1 December 2021
    0 references
    0.76 percent
    0 references
    12 April 2018
    0 references
    12 March 2021
    0 references
    0 references
    Общата цел на настоящото проектно предложение е намаляване на количеството депонирани БО от членовете на РСУО – регион Ботевград, чрез осигуряване на допълнителен капацитет за предварително третиране на смесено събрани БО и за разделно събиране и рециклиране чрез компостиране на зелени и биоразградими отпадъци. В рамките на проекта се предвижда изготвяне, съгласуване и одобрение на инвестиционен проект и изпълнение на дейности по изграждане на инсталации за компостиране на зелени и биоразградими отпадъци и за предварително третиране на смесено събраните БО. Инсталациите ще бъдат разположени на терен, публична общинска собственост в местността „Темуша“. Капацитетът на инсталацията за компостиране е 2770 т/год. като е избран технологичен процес с аеробно разграждане в двустранно обслужваеми открити компостни купове без принудителна аерация. Каптацитетът на инсталацията за предварително третиране на смесени БО е до 9000 т/год, включваща сортиране и отделяне на рециклируемите фракции и модул за стабилизиране на подситовата фракция. Настоящото проектно предложение отчита нагласите на населението от общините – Ботевград, Правец, Етрополе, към разделното събиране на зелени и биоразградимите отпадъци, към употреба на компост от отпадъци, както и степента на осведоменост на населението за нуждите от осигуряване на необходимите количества зелени и биоразградими БО. За осигуряване на законосъобразното изпълнение на строителството ще бъдат изпълнени дейности по оценка на съответствието на инвестиционния проект и строителен надзор по време на строителството. За информиране на обществеността относно финансовия принос на ЕС за изпълнение на проекта ще бъдат изпълнени дейности за информация и комуникация. В резултат от изпълнението на проекта ще се намали въздействието върху околната среда, причинено от образуваните отпадъци, ще се подобри ефективността на използване на ресурсите и ще се стимулират инвестициите в областта на управление на отпадъците. (Bulgarian)
    0 references
    The overall objective of this project proposal is to reduce the amount of BO landfilled by the members of the RSPO — Botevgrad region, by providing additional capacity for pre-treatment of mixed collected BOs and for separate collection and recycling through composting of green and biodegradable waste. The project envisages the preparation, coordination and approval of investment project and implementation of activities for the construction of installations for composting green and biodegradable waste and for the pre-treatment of mixed collected BOs. The installations will be located on a public municipal property in Temusha locality. The capacity of the composting plant is 2 770 t/year and aerobic digestion process has been selected in double-sided serviceable open compost clusters without forced aeration. The capacity of the pre-treatment plant for mixed BOs is up to 9000 tonnes/year, including sorting and separation of the recyclable fraction and a module for stabilising the saturated fraction. This project proposal takes into account the attitudes of the population from the municipalities — Botevgrad, Pravets, Etropole, towards the separate collection of green and biodegradable waste, towards the use of compost from waste, as well as the level of awareness of the population about the needs of providing the necessary quantities of green and biodegradable waste. To ensure the lawful execution of the construction will be carried out conformity assessment activities of the investment project and construction supervision during the construction. Information and communication activities will be implemented to inform the public about the EU contribution to the implementation of the project. The implementation of the project will reduce the environmental impact caused by the generated waste, improve resource efficiency and stimulate investment in waste management. (English)
    2 December 2021
    0 references
    БотевградЕтрополеПравец
    0 references

    Identifiers

    BG16M1OP002-2.002-0016
    0 references