Increasing the energy efficiency of the building of the District Office “Fire Safety and Protection of the Population” (RSBZN) — Elhovo (Q3885157)

From EU Knowledge Graph
Revision as of 22:45, 2 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en, and other parts: Adding en translations)
Jump to navigation Jump to search
Project Q3885157 in Bulgaria
Language Label Description Also known as
English
Increasing the energy efficiency of the building of the District Office “Fire Safety and Protection of the Population” (RSBZN) — Elhovo
Project Q3885157 in Bulgaria

    Statements

    0 references
    182,118.42 Bulgarian lev
    0 references
    92,880.39 Euro
    1 December 2021
    0 references
    214,256.95 Bulgarian lev
    0 references
    109,271.04 Euro
    1 December 2021
    0 references
    0.85 percent
    0 references
    8 March 2019
    0 references
    14 August 2020
    0 references
    Q3885143 (Deleted Item)
    0 references
    Проектното предложение е насочено към Повишаване на енергийна ефективност на сградата на Районна служба „Пожарна безопасност и защита на населението“ (РСПБ) - Елхово. Основната сграда е завършена и въведена в експлоатация през 1958 година, като в последствие към основната сграда са изградени два гаража, единият от които е изпълнен монолитно, а другият е от сглобяема стоманобетонна конструкция, с ограждане и покритие от панели. Във функционално отношение, представлява масивна двуетажна административна сграда и два гаража за противопожарна техника. Мерките за енергийна ефективност на сградата ще се изпълняват въз основа на извършено обследване за енергийна ефективност, придружени от валиден сертификат за енергийна характеристика по съответната сграда, и обследване за установяване на техническите характеристики на сградата с изготвен технически паспорт. На етап кандидатстване е изработен инвестиционен проект във фаза "технически проект", съгласно ЗУТ и Наредба 4 от 2001 г. за обхвата и съдържанието на инвестиционните проекти. В инвестиционния проект са включени всички задължителни енергоспестяващи мерки, предписани в обследването за енергийна ефективност, в т.ч. мерки за оползотворяване на възобновяеми енергийни източници и всички задължителни мерки, предписани в техническото обследване. Изпълнението на заложените в проектното предложение дейности в aдминистративната сграда ще допринесат за достигане клас на енергопотребление „В“. Предвидените по проекта енергоспестяващи мерки и задължителните мерки от обследването на техническите характеристики ще се изпълняват въз основа на направените обследвания за административната сграда.В резултат от изпълнението им ще се повиши енергийната ефективност на сградата, ще бъдат намалени разходите за електроенергия, което ще доведе до освобождаване на ресурси, които да бъдат пренасочени за други дейности и ще стимулират хората да останат да живеят в малките населени места. (Bulgarian)
    0 references
    The project proposal is aimed at increasing the energy efficiency of the building of the District Office “Fire Safety and Protection of the Population” (RSPB) — Elhovo. The main building was completed and put into operation in 1958, and subsequently two garages were built to the main building, one of which was constructed monolithically and the other was of prefabricated reinforced concrete structure, with fencing and covering of panels. Functionally, it is a massive two-storey administrative building and two garages for fire-fighting equipment. The energy efficiency measures of the building will be implemented on the basis of an energy efficiency audit accompanied by a valid energy performance certificate for the building concerned and an audit to establish the technical characteristics of the building with a technical passport. At the application stage, an investment project in the “technical project” phase has been drawn up in accordance with the ZUT and Ordinance 4 of 2001 on the scope and content of investment projects. The investment project includes all mandatory energy saving measures prescribed in the energy efficiency audit, including measures for the utilisation of renewable energy sources and all mandatory measures prescribed in the technical audit. The implementation of the activities set out in the project proposal in the administrative building will contribute to achieving the energy consumption class “B”. The planned energy-saving measures and the mandatory measures from the technical performance audit will be carried out on the basis of the audits carried out for the administrative building. As a result of their implementation, the energy efficiency of the building will be increased, the electricity costs will be reduced, which will lead to the release of resources to be redirected to other activities and will stimulate people to stay in small settlements. (English)
    2 December 2021
    0 references
    Елхово
    0 references

    Identifiers

    BG16RFOP001-2.002-0011
    0 references