Implementation of energy efficiency measures for multi-apartment buildings in Lovech — stage 3 (Q3885796)

From EU Knowledge Graph
Revision as of 22:42, 2 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en, and other parts: Adding en translations)
Jump to navigation Jump to search
Project Q3885796 in Bulgaria
Language Label Description Also known as
English
Implementation of energy efficiency measures for multi-apartment buildings in Lovech — stage 3
Project Q3885796 in Bulgaria

    Statements

    0 references
    747,621.02 Bulgarian lev
    0 references
    381,286.72 Euro
    1 December 2021
    0 references
    879,554.14 Bulgarian lev
    0 references
    448,572.61 Euro
    1 December 2021
    0 references
    0.85 percent
    0 references
    21 August 2019
    0 references
    10 November 2021
    0 references
    Q3885780 (Deleted Item)
    0 references
    В Инвестиционната програма за изпълнение на ИПГВР на гр. Ловеч са включени проекти за прилагане на мерки за енeргийна ефективност (ЕЕ) върху многофамилни жилищни сгради (МЖС). С реализирането на настоящия проект ще се приложат мерки за ЕЕ по отношение на 5 МЖС, разположени в строителните граници на Ловеч, отговарящи на критериите за допустимост по процедурата:-МЖС на ул. "Иларион Ловчански" №34-МЖС на бул. "България" №48, вх.А-МЖС на ул. "Оборище" №1-МЖС на ул. "Петко Р. Славейков" №7А-МЖС на ул. "Търговска" №54, бл. "Надежда"Потребността, която ще бъде удовлетворена чрез изпълнението на проекта е: осигуряване на по-добри условия на живот за живущите в МЖС, подобрен топлинен комфорт и осигуряване на по-високо качество на жизнената среда.Целеви групи са сдруженията на собствениците (СС) в МЖС в които членуват собствениците на самостоятелни обекти в МЖС и по-конкретно собствениците на самостоятелни обекти в 5-те МЖС, в т.ч. собственици на жилища и стопански обекти, както и лицата посещаващи жилищата и стопанските обекти.Конкретната цел на проектното предложение (ПП) е повишаване на енергийната ефективност в жилищния сектор в гр.Ловеч. Очакваните резултати от изпълнението на проекта са:-по-високо ниво на ЕЕ на МЖС и намаляване разходите за енергия;-подобряване на експлоатационните характеристики за удължаване на жизнения цикъл на сградите; -осигуряване на адекватна с критериите за устойчиво развитие, достъпна жизнена среда.Основните дейности, които ще се изпълнят по време на проекта са: организация и управление на проекта, мерки за информиране и публичност, инженеринг (проектиране, извършване на строително-монтажни работи и авторски надзор), оценка на съответствието на инвестиционни проекти и осъществяване на строителен надзор, въвеждане на обектите в експлоатация и извършване на одит. (Bulgarian)
    0 references
    Projects for the implementation of energy efficiency measures (EE) on multi-apartment residential buildings (MZS) are included in the Investment Programme for the implementation of the ILUCF of Lovech. With the implementation of this project, measures for EE will be implemented in relation to 5 MZhS located within the construction borders of Lovech, meeting the eligibility criteria under the procedure:-MZhS at 34 Ilarion Lovchanski Str., 48 Bulgaria Blvd., ent.A-MZhS on 1 Oborishte Street at 7A-MZhS, Petko R. Slaveykov Street, 54, Targovska Street, Nadezhda blvd. The need to be satisfied through the implementation of the project is: providing better living conditions for the residents of the Ministry of Railways, improved thermal comfort and ensuring a higher quality of the living environment.The target groups are the owners’ associations (CC) of the Ministry of Railways in which the owners of independent sites in the Ministry of Railways are members, in particular the owners of independent sites in the 5 MZhM, including owners of homes and businesses, as well as persons visiting the homes and businesses. The specific objective of the project proposal (PP) is to increase the energy efficiency in the residential sector in Lovech. The expected results of the implementation of the project are: — a higher EE level of the LGE and the reduction of energy costs;-improvement of performance to extend the life cycle of buildings; —providing adequate sustainable development criteria, accessible living environment.The main activities to be implemented during the project are: organisation and management of the project, information and publicity measures, engineering (design, execution of construction and installation works and author’s supervision), assessment of the conformity of investment projects and execution of construction supervision, commissioning of the sites and auditing. (English)
    2 December 2021
    0 references
    Ловеч
    0 references

    Identifiers

    BG16RFOP001-1.020-0007
    0 references