Construction of environmental infrastructure for Rila Eco RSU (Q3885736)

From EU Knowledge Graph
Revision as of 22:37, 2 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en, and other parts: Adding en translations)
Jump to navigation Jump to search
Project Q3885736 in Bulgaria
Language Label Description Also known as
English
Construction of environmental infrastructure for Rila Eco RSU
Project Q3885736 in Bulgaria

    Statements

    0 references
    5,955,969.72 Bulgarian lev
    0 references
    3,037,544.56 Euro
    1 December 2021
    0 references
    7,833,452.42 Bulgarian lev
    0 references
    3,995,060.73 Euro
    1 December 2021
    0 references
    0.76 percent
    0 references
    10 April 2019
    0 references
    27 October 2023
    0 references
    Q3885732 (Deleted Item)
    0 references
    Проектното предложение обхваща общините Кюстендил, Невестино и Трекляно, които са включени в РСУО „РИЛА ЕКО“, регион за управление на отпадъците Дупница. То цели да се намали количеството на смесени отпадъци за депониране, чрез предварителното им третиране, както и осигуряване на разделно събиране и рециклиране на битови, биоразградими и зелени отпадъци. За тази цел се предвижда проектиране и изграждане на инсталация за предварително третиране на смесено събрани битови отпадъци с капацитет 15 500 т/год, както и разделно събиране и оползотворяване на зелени и/или биоразградими отпадъци, чрез проектиране и изграждане на инсталация за компостиране с капацитет 3 000 т/год. Инсталациите ще бъдат разположени на площадка в м. „Гладни рид“, с. Радиловци, общ. Кюстендил, ПИ-000132, ЕКАТТЕ 61457, с площ 24,08 дка, . Инсталацията за предварително третиране ще обслужва 52 702 жители на общините Кюстендил, Невестино и Трекляно. Предвижда се тя да прилага метода ръчно сортиране и аеробно стабилизиране на органичната фракция и да има модул за предварително третиране (сепариране и стабилизиране). Компостиращата инсталация ще обслужва 52 158 жители на общините Кюстендил и Невестино. Тя ще прилага метода на компостиране с открити боксове под навес и представлява инсталация за открито компостиране с механично разбъркване за аериране на компостираните материали и автоматизирана система за разбъркване и аериране на компоста.В резултат на реализацията на проекта трите общини ще изпълнят задълженията си по отношение на организацията на управлението на битовите отпадъци - в т. ч. тяхното събиране и предварително третиране за намаляване на обема на тези за депониране. От своя страна това ще допринесе за постигане на целите на ПО 2 „Отпадъци“ на ОПОС за осигуряване на допълнителни капацитети за рециклиране и намаляване количеството депонираните отпадъци. (Bulgarian)
    0 references
    The project proposal covers the municipalities of Kyustendil, Nevestino and Treklyano, which are included in the RSW “RILA ECO”, waste management region Dupnitsa. It aims to reduce the amount of mixed waste for landfilling by pre-treatment, as well as to ensure separate collection and recycling of municipal, biodegradable and green waste. To this end, the design and construction of a pre-treatment plant for mixed collected municipal waste with a capacity of 15 500 t/year, as well as separate collection and recovery of green and/or biodegradable waste, through the design and construction of a composting plant with a capacity of 3 000 tonnes/year. The installations will be located on a site in Gladni Rid, village of Radilovtsi, municipality. Kyustendil, PI-000132, ECATTE 61457, area 24.08 decares. The pretreatment plant will serve 52 702 inhabitants of the municipalities of Kyustendil, Nevestino and Treklyano. It is intended to apply the method of manual sorting and aerobic stabilisation of the organic fraction and to have a pretreatment module (separation and stabilisation). The composting plant will serve 52 158 inhabitants of the municipalities of Kyustendil and Nevestino. It will apply the method of composting with open pens under the shed and is an open composting plant with mechanical stirring to aerate composted materials and an automated system for stirring and aeration of compost. As a result of the implementation of the project, the three municipalities will fulfil their obligations regarding the organisation of the management of municipal waste — including their collection and pre-treatment to reduce the volume of landfills. In turn, this will contribute to achieving the objectives of PO 2 “Waste” of the OPE to provide additional recycling capacities and reduce the amount of waste landfilled. (English)
    2 December 2021
    0 references
    Кюстендил
    0 references

    Identifiers

    BG16M1OP002-2.002-0002
    0 references