Preparation and implementation of a project for the development of the waste water infrastructure in the agglomeration of Golden Sands resort, Varna Municipality (Q3884364)

From EU Knowledge Graph
Revision as of 22:28, 2 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en, and other parts: Adding en translations)
Jump to navigation Jump to search
Project Q3884364 in Bulgaria
Language Label Description Also known as
English
Preparation and implementation of a project for the development of the waste water infrastructure in the agglomeration of Golden Sands resort, Varna Municipality
Project Q3884364 in Bulgaria

    Statements

    0 references
    24,360,056.55 Bulgarian lev
    0 references
    12,423,628.84 Euro
    1 December 2021
    0 references
    30,504,406.66 Bulgarian lev
    0 references
    15,557,247.4 Euro
    1 December 2021
    0 references
    0.8 percent
    0 references
    26 July 2016
    0 references
    30 June 2024
    0 references
    0 references
    0 references
    Изпълнението на настоящия проект ще осигури постигане на целите на проект DIR-51011119-18-37„Подготовка и изпълнение на проект за развитие на инфраструктурата за отпадъчни води в агломерация к.к. ”Златни пясъци”, Община Варна” чието изпълнение започна по ОП „Околна среда 2007-2013“. В резултат на изпълнение на предвиденото в Споразумението за подготовка и Допълнително споразумение за първа фаза на втори етап от реализацията на проекта, беше постигната пълна проектна готовност за изпълнение на инвестиционния проект. Настоящото проектно предложение включва два обекта: 1) Реконструкция и модернизация на ПСОВ – Златни пясъци. Предвидена е за бъдещо натоварване от 72 122 е.ж. през летните месеци и 18 000 е.ж. през зимния период. Територията, която се обслужва от пречиствателната станция е със значителен обхват и включва: СО „Ален мак“, к.к. “Чайка“, ВК „Ревиера“, к.к. “Златни пясъци“. С проекта в рамките на процедура BG161M10P002-1.005 се предвижда ПСОВ да осигури необходимото пречистване на отпадъчните води, чрез отстраняване и на общ азот и общ фосфор. Предвид на това в технологичната схема на ПСОВ по пътя на водата са включени: груби решетки, входна ПС, механично пречистване в комбинирано съоръжение, биологично пречистване в SB-реактори, UV дезинфекция. По пътя на утайката ще бъдат изградени аеробен стабилизатор с уплътняване, механично обезводняване с центрофуга и поствакумиране на кека. 2) Частично изграждане, реконструкция/рехабилитация на канализационната мрежа в СО „Ален мак“. Селищното образувание е в близост до к.к. “Чайка” и това обуславя активното му усвояване за вилни и курортни цели с почивни домове. Общо изградената към момента канализационна система на територията е около 20 %. По проекта се предвижда изграждане на 4 главни гравитачни битови канализационни клона с обща дължина 4795 м и на 265 сградни отклонения. Клоновете се заустват в съществуващия горен битов колектор „Чайка“, преминаващ през територията и заустващ в ПСОВ-Златни пясъци. (Bulgarian)
    0 references
    The implementation of this project will ensure the achievement of the objectives of project DIR-51011119-18-37 “Preparation and implementation of a project for the development of waste water infrastructure in the agglomeration of Golden Sands resort, Varna Municipality”, the implementation of which started under OP “Environment 2007-2013”. As a result of the implementation of the Preparation Agreement and the Supplementary Agreement for the first phase of the project, full project readiness for the implementation of the investment project was achieved. This project proposal includes two sites: 1) Reconstruction and modernisation of WWTP — Golden Sands. It is planned for a future load of 72 122 p.e. during the summer months and 18 000 p.e. during the winter period. The area served by the treatment plant is of significant scope and comprises: Sa “Alen poppy”, Chaika resort, Reviera VK, Golden Sands resort. The project under procedure BG161M10P002-1.005 provides for the WWTP to ensure the necessary treatment of waste water by also removing total nitrogen and total phosphorus. In view of this, the following are included in the water-road WWTP process scheme: coarse gratings, input PS, mechanical purification in combined facility, biological treatment in SB-reactors, UV disinfection. Aerobic stabiliser with sealing, mechanical centrifuge dehydration and post-coaching of the cake will be built along the path of the sludge. 2) Partial construction, reconstruction/rehabilitation of the sewerage network in “Allen Mak” SO. The settlement is close to Chaika resort and this determines its active absorption for villas and resorts with holiday homes. The total current sewerage system in the territory is about 20 %. The project envisages the construction of 4 main gravitational household sewerage branches with a total length of 4 795 m and 265 building deviations. The branches are discharged into the existing upper household collector “Tchaika” passing through the territory and discharged into the WWTP-Golden Sands. (English)
    2 December 2021
    0 references
    Варна
    0 references

    Identifiers

    BG16M1OP002-1.005-0006
    0 references