Construction of the seaside promenade along with the reconstruction of the descent to the beach and the square at the monument in Mrzeżyna (Q138005)
Jump to navigation
Jump to search
Project Q138005 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of the seaside promenade along with the reconstruction of the descent to the beach and the square at the monument in Mrzeżyna |
Project Q138005 in Poland |
Statements
1,046,059.69 zloty
0 references
2,096,438.21 zloty
0 references
49.9 percent
0 references
1 September 2017
0 references
29 June 2018
0 references
GMINA TRZEBIATÓW
0 references
Projekt ma charakter stacjonarny.W wyniku realizacji projektu na terenie nadmorskiej miejscowości Mrzeżyno stworzona zostanie wielofunkcyjna infrastruktura do uprawiania turystyki aktywnej w postaci promenady nadmorskiej wraz z zejściem na plażę oraz placu rekreacyjny przy Pomniku Zaślubin z Morzem z punktem widokowym. Po zakończeniu realizacji inwestycji powstała infrastruktura zostanie bezpłatnie udostępniona społeczności lokalnej oraz turystom. Realizację inwestycji podzielono na dwa zadania inwestycyjne: Przebudowa placu przy pomniku oraz budowę promenady nadmorskiej wraz z przebudową zejścia na plażę. Projekt podzielono na 5 działań. I DZIAŁANIE: Przygotowanie dokumentacji projektu; II DZIAŁANIE: Przebudowa placu przy pomniku; III DZIAŁANIE: Budowa promenady nadmorskiej wraz z przebudową zejścia na plażę; IV DZIAŁANIE: Usługi dotyczące kosztów nadzoru nad projektem; V DZIAŁANIE: Promocja projektu; Za realizację proj odpowiedzialna będzie Gmina Trzebiatów, która jednocześnie będzie zarządzała projektem. Zarządzanie projektem zostanie powierzone zespołowi składającemu się z pracowników obecnie zatrudnionych w Urzędzie Miejskim w Trzebiatowie. (Polish)
0 references
As a result of the project on the seaside town of Mrzeżyno, a multifunctional infrastructure for active tourism in the form of a seaside promenade will be created, along with the descent to the beach and the recreational square at the Monument Zaslubin with the Sea with a lookout point. Once the investment is completed, the infrastructure will be made available to the local community and tourists free of charge. Implementation of the investment is divided into two investment tasks: Reconstruction of the square at the monument and the construction of a seaside promenade along with the reconstruction of the descent to the beach. The project was divided into 5 actions. I ACTION: Preparation of project documentation; ACTION II: Reconstruction of the square at the monument; ACTION III: Construction of a seaside promenade with a reconstruction of the beach; ACTION IV: Services related to the cost of supervision of the project; V ACTION: Promotion of the project; The project will be carried out by the Municipality of Trzebiatów, which will simultaneously manage the project. Project management will be entrusted to a team of employees currently employed at the Municipal Office in Trzebiatow. (English)
21 October 2020
0 references
Le projet est un projet stationnaire.A la suite du projet, une infrastructure multifonctionnelle pour le tourisme actif sous la forme d’une promenade en bord de mer sera créée dans la zone côtière de Mrzeżyno, ainsi que la plage et l’aire de loisirs au Monument de Zaślubin avec la mer avec un point de vue. Une fois l’investissement terminé, l’infrastructure sera mise gratuitement à la disposition de la communauté locale et des touristes. La mise en œuvre de l’investissement a été divisée en deux tâches d’investissement: Reconstruction de la place par le monument et la construction de la promenade en bord de mer ainsi que la reconstruction de la descente à la plage. Le projet est divisé en 5 actions. ET ACTIONS: Préparation de la documentation du projet; ACTION II: Reconstruction de la place au monument; ACTION III: Construction d’une promenade en bord de mer avec reconstruction de l’entrée de la plage; ACTION IV: Les services liés aux coûts de la supervision du projet; ACTION EN V: Promotion du projet; Le projet sera mis en œuvre par la municipalité de Trzebiatów, qui gérera le projet en même temps. La gestion du projet sera confiée à une équipe composée d’employés actuellement employés à l’hôtel de ville de Trzebiatów. (French)
2 December 2021
0 references
Identifiers
RPZP.04.09.00-32-4008/17
0 references