Construction of a distribution water supply network on the Jasnopole-Suchowo section, Kalisz Pomorski Municipality (Q137899)
Jump to navigation
Jump to search
Project Q137899 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a distribution water supply network on the Jasnopole-Suchowo section, Kalisz Pomorski Municipality |
Project Q137899 in Poland |
Statements
194,689.28 zloty
0 references
229,046.22 zloty
0 references
85.0 percent
0 references
6 October 2015
0 references
7 May 2019
0 references
GMINA KALISZ POMORSKI
0 references
Realizacja niniejszego projektu będzie miała miejsce na terenie Aglomeracji Kalisz Pomorski (ID PLZA046), która została wyznaczona Rozporządzeniem Wojewody nr 50/2006 z dnia 14 marca 2006r. poz. 730. Aglomeracja Kalisz Pomorski liczy 6 027 RLM. Zakres rzeczowy projektu obejmuje: I. Opracowanie dokumentacji aplikacyjnej, co ma na celu umożliwienia pozyskania na jego realizację środków UE w ramach Działania 3.5 RPO WZP na lata 2014-2020 (koszt kwalifikowany w zakresie Studium Wykonalności, koszt niekwalifikowany w zakresie wniosku o dofinansowanie). II. Roboty budowlane związane z budową sieci wodociągowej rozdzielczej na odcinku Jasnopole-Suchowo w gminie Kalisz Pomorski (koszt kwalifikowany). III. Przeprowadzenie nadzoru inwestorskiego, co ma na celu zapewnienie kontroli nad prawidłowym wykonaniem wszystkich zaplanowanych w projektowanym przedsięwzięciu prac (koszt kwalifikowany). IV. Promocja projektu, która będzie polegała na właściwym oznaczeniu miejsca realizacji projektu (za pomocą 2,00 szt. tablic informacyjno-pamiątkowych) oraz dokumentów i materiałów, które powstaną w związku z jego realizacją, informacją o współfinansowaniu projektu przez UE, a także umieszczeniu opisu wdrażanego projektu na stronie WWW Gminy Kalisz Pomorski (koszt kwalifikowany w zakresie zakupu tablic, pozostałe działania promocyjne bezkosztowe). Efektem ekologicznym budowy projektowanego odcinka sieci wodociągowej o długości 2 097,63 m (tj. 2,1 km) będzie m.in. stworzenie możliwości zwiększenia ilości osób korzystających z ulepszonego zaopatrzenia w wodę o kolejne 263 osoby (tj. o mieszkańców Suchowa). Projekt realizowany będzie przez Gminę Kalisz Pomorski, na rzecz Przedsiębiorstwa Gospodarki Komunalnej i Mieszkaniowej w Kaliszu Pomorskim, które będzie zarządzało powstałą w efekcie realizacji niniejszego przedsięwzięcia infrastrukturą. właścicielem powstałej infrastruktury pozostanie niezmiennie Gmina Kalisz Pomorski. Realizacja projektu ma charakter stacjonarny (Polish)
0 references
The implementation of this project will take place in the Kalisz Pomorski Agglomeration (ID PLZA046), which was designated by the Provincial Regulation No. 50/2006 of 14 March 2006 item. 730. Kalisz Pomorski counts 6 027 RLM. The project’s material scope includes: I. elaboration of application documentation, which aims to enable EU funds to be mobilised for its implementation under Measure 3.5 of the ROP of the JPA for the years 2014-2020 (qualified cost in the scope of the feasibility study, cost ineligible for the application for funding). II. Construction works related to the construction of a distribution water supply network on the Jasnopole-Suchowo section in the municipality of Kalisz Pomorski (qualified cost). III. Carrying out investor supervision, which aims to ensure control over the proper execution of all planned works planned in the project (qualified cost). IV. Promotion of the project, which will consist of a proper designation of the place of implementation of the project (with the help of 2,00 pieces of information and commemorative boards) and documents and materials which will be created in connection with its implementation, information on the EU co-financing of the project, as well as the inclusion of a description of the implemented project on the website of Kalisz Pomorski Municipality (qualified cost-free cost). The ecological effect of the construction of a 2097.63 m long section of the water supply network (i.e. 2.1 km) will include the possibility of increasing the number of people using improved water supply by another 263 people (i.e. the inhabitants of Suchów). The project will be implemented by Kalisz Pomorski Municipality, in favour of the Municipal Economy and Housing Enterprise in Kalisz Pomorskie, which will manage the infrastructure created as a result of this project. The implementation of the project is stationary (English)
21 October 2020
0 references
La mise en œuvre de ce projet aura lieu dans les locaux de l’agglomération de Kalisz Pomorski (ID PLZA046), désignée par le décret no 50/2006 du gouverneur du 14 mars 2006. 730. L’agglomération de Kalisz Pomorski a 6 027 EH. Le champ d’application du projet comprend: I. Élaboration d’une documentation relative aux demandes, destinée à permettre l’obtention de fonds de l’UE pour sa mise en œuvre au titre de la mesure 3.5 de l’APP ROP 2014-2020 (coût éligible dans le domaine de l’étude de faisabilité, coût inéligible dans le champ d’application de la demande de cofinancement). II. Travaux de construction liés à la construction d’un réseau de distribution d’eau sur le tronçon Jasnopole-dryowo dans la municipalité de Kalisz Pomorski (coût éligible). III. Assurer la surveillance des investisseurs afin d’assurer le contrôle de l’exécution correcte de tous les travaux prévus (coût éligible). IV. La promotion du projet, qui consistera en une indication correcte du lieu de mise en œuvre du projet (à l’aide de 2,00 pièces d’information et de tableaux commémoratifs) et des documents et matériels qui seront créés dans le cadre de sa mise en œuvre, des informations sur le cofinancement du projet par l’UE, ainsi qu’une description du projet mis en œuvre sur le site web de la municipalité de Kalisz Pomorski (coût éligible pour l’achat de conseils, autres activités promotionnelles gratuites). L’effet écologique de la construction du tronçon prévu du réseau d’approvisionnement en eau d’une longueur de 2 097,63 m (c.-à-d. 2,1 km) créera, entre autres, la possibilité d’augmenter le nombre de personnes utilisant un approvisionnement en eau amélioré par 263 personnes supplémentaires (c’est-à-dire les habitants de Suchowa). Le projet sera mis en œuvre par la municipalité de Kalisz Pomorski, pour la société municipale et de logement de Kalisz Pomorski, qui gérera l’infrastructure créée à la suite de la mise en œuvre de ce projet. La mise en œuvre du projet est stationnaire (French)
2 December 2021
0 references
Identifiers
RPZP.03.05.00-32-C013/18
0 references