Sports hall at the Primary School in Kostrzyn as an opportunity for the versatile development of her students (Q137163)

From EU Knowledge Graph
Revision as of 22:04, 2 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr: translated_label)
Jump to navigation Jump to search
Project Q137163 in Poland
Language Label Description Also known as
English
Sports hall at the Primary School in Kostrzyn as an opportunity for the versatile development of her students
Project Q137163 in Poland

    Statements

    0 references
    3,907,656.45 zloty
    0 references
    937,837.55 Euro
    13 January 2020
    0 references
    9,166,447.25 zloty
    0 references
    2,199,947.34 Euro
    13 January 2020
    0 references
    42.63 percent
    0 references
    16 August 2016
    0 references
    20 December 2018
    0 references
    GMINA KOSTRZYN
    0 references
    0 references
    Projekt pn. "Sala sportowa przy Szkole Podstawowej w Kostrzynie szansą wszechstronnego rozwoju jej uczniów" będzie polegał na rozbudowie placówki o salę sportową. Sala zostanie dobudowana do budynku szkoły od strony południowej. Elementem łączącym budynek szkoły oraz salę będzie parterowy łącznik, zaprojektowany w ramach adaptacji. Inwestycja zostanie zlokalizowana na działce ewid. nr 1162/5 obręb Kostrzyn. Sala sportowa będzie pełnić funkcję przyszkolnej sali sportowej. Na parterze budynek podzielony będzie na dwie części: salę sportową, oraz zaplecze socjalno-techniczne, w którym zlokalizowane będą hol wejściowy wraz z szatnią, szatnie i łazienki dla sportowców, pokój nauczyciela (trenera) – pomieszczenie 1-szej pomocy, magazyn na sprzęt sportowy, toaleta dla osób niepełnosprawnych, pomieszczenie gospodarcze, kotłownia oraz wentylatornia. Na I piętrze znajdzie się widownia oraz zespół szatniowy i pomieszczenie pomocnicze. W części zaplecza zlokalizowane będą pomieszczenia techniczne: centrala wentylacyjna oraz kotłownia. Dane techniczne: - powierzchnia zabudowy: 1 708,50 m2, - powierzchnia całkowita: 1 973,31 m2, - kubatura: 18 971,46 m3, - długość budynku projektowanej sali: 45,26 m, - szerokość budynku projektowanej sali: 36,16 m, - wysokość budynku projektowanego: 12,51 m, - ilość kondygnacji budynku projektowanego: 2. Bezpośrednią grupę odbiorców niniejszej inwestycji stanowić będą uczniowie Szkoły Podstawowej w Kostrzynie. W roku szkolnym 2015/2016 do placówki oświatowej uczęszczało 800 osób., dla porównania w roku 2012/2013 – 665 osób. Prognozuje się, iż w roku szkolnym 2018/2019 liczba uczniów SP w Kostrzynie wyniesie 875 osób. Istniejąca infrastruktura sportowa szkoły nie zaspokaja aktualnych potrzeb uczniów. Wsparciem zostanie objęty 1 obiekt infrastruktury edukacji ogólnej, a potencjał objętej wsparciem placówki wyniesie docelowo 70 osób. (Polish)
    0 references
    Project Mon. “The sports hall at the Kostrzyn Primary School in Kostrzyn will be an opportunity for the comprehensive development of its students” will consist of expanding the facility with a sports hall. The hall will be added to the school building on the south side. The element connecting the school building and the hall will be a one-storey connector, designed as part of the adaptation. The investment will be located on the plot no. 1162/5 of Kostrzyn. The sports hall will serve as a school sports hall. On the ground floor the building will be divided into two parts: sports hall, as well as social and technical facilities, in which the entrance hall will be located together with the locker room, lockers and bathrooms for athletes, teacher’s room (trainer) – room for 1st aid, a warehouse for sports equipment, toilet for disabled people, economic room, boiler room and Ventilatornia. On the first floor there will be an auditorium and a locker room and an auxiliary room. Technical rooms will be located in the part of the facilities: the ventilation unit and the boiler room. Technical data: — area of construction: 1708,50 m², – total area: 1973,31 m², – cubicure: 18971.46 m³, – length of the building of the designed hall: 45.26 m, – width of the building of the designed hall: 36,16 m, – height of the designed building: 12,51 m, – the number of floors of the designed building: 2. The direct group of recipients of this investment will be students of the Primary School in Kostrzyn. In the 2015/2016 school year, 800 people attended the educational institution, compared to 2012/2013-665 people. It is forecast that in the school year 2018/2019 the number of students in Kostrzyn will be 875 people. The existing sports infrastructure of the school does not meet the current needs of pupils. 1 general education infrastructure facility will be supported and the potential of the supported institution will reach 70 people. (English)
    21 October 2020
    0 references

    Identifiers

    RPWP.09.03.03-30-0046/16
    0 references