Construction of four photovoltaic installations for MWiK Sp. z o.o. in Kołobrzeg (Q137741)

From EU Knowledge Graph
Revision as of 21:51, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet envisagé appartient à un groupe de projets fixes. Le projet consiste en la construction de 4 installations photovoltaïques d’une capacité totale d’env. 340 kWh, y compris les infrastructures de raccordement nécessaires, produisant de l’énergie pour répondre aux besoins propres des municipalités d’approvisionnement en eau et d’assainissement Sp. z o.o. ayant son siège social à Kołobrzeg. Grâce à l’investissement, quatre installations ph...)
Jump to navigation Jump to search
Project Q137741 in Poland
Language Label Description Also known as
English
Construction of four photovoltaic installations for MWiK Sp. z o.o. in Kołobrzeg
Project Q137741 in Poland

    Statements

    0 references
    1,236,363.24 zloty
    0 references
    296,727.18 Euro
    13 January 2020
    0 references
    1,454,545.0 zloty
    0 references
    349,090.8 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    29 October 2018
    0 references
    30 November 2019
    0 references
    MIEJSKIE WODOCIĄGI I KANALIZACJA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references
    Planowane przedsięwzięcie należy do grupy projektów stacjonarnych. Projekt polega na budowie 4 instalacji fotowoltaicznych, o łącznej mocy ok. 340 kWh łącznie, z niezbędną infrastrukturą przyłączeniową, produkującej energię na potrzeby własne Miejskich Wodociągów i Kanalizacji Sp. z o.o z siedzibą w Kołobrzegu. W wyniku realizacji inwestycji powstaną cztery instalacje fotowoltaiczne – dwie na terenie OŚ Korzyścienko (A i B) oraz dwie na ternie Ujęcia Wody Bogucino (A i B) - każda o mocy ok. 85 kWp każda. Instalacje fotowoltaiczne zostaną posadowione na terenie: - działek nr 129, 127, 191/5 obręb 0010 Obroty (teren Ujęcia Wody Boguciono), - działka nr 314/15 obręb 0005 Korzystno (terenie Oczyszczalni Ścieków w Korzyscienku) Powierzchnia terenu przeznaczonego pod instalację, w każdej z dwóch lokalizacji, zajmie - ok. 0,49 ha. Teren stanowi własność spółki lub jest w użytkowaniu wieczystym i posiada dogodny dojazd, uzbrojenie oraz tereny komunikacyjne. W ramach projektu na gruncie zamontowane zostaną panele fotowoltaiczne na stelażu. Instalacje PV zostaną wykonane w systemie OFF GRID z zerowym eksportem energii do sieci. Produkowana energia będzie w całości wykorzystywana na potrzeby własne OŚ Korzyścienko i Ujęcia Wody w Bogucinie. Każda z czterech instalacji będzie zbudowana z 315 modułów fotowoltaicznych, 2 falowników PV, konstrukcji wsporczej, tras kablowych DC, rozdzielni pośrednich DC z zabezpieczeniami, rozdzielni pośrednich AC z zabezpieczeniami, tras kablowych AC. Dla każdego z dwóch zespołów instalacji (A i B) zostanie zamontowany wspólny układ monitorowania pracy i sterowania wraz z systemem ograniczającym wypływ energii do sieci. W wyniku realizacji projektu nastąpi również rozbudowa nastającego systemu SCADA oraz rozbudowa/modernizacja rozdzielni głównej. Powstanie również ogrodzenie i system monitoringu wizyjnego z czujkami ruchu i oświetleniem. (Polish)
    0 references
    The planned project belongs to a group of fixed projects. The project consists of the construction of 4 photovoltaic installations, with a total power of approx. 340 kWh, including the necessary connection infrastructure, producing energy for own needs of the Municipal Waterworks and Sewerage Sp. z o.o. with its registered office in Kołobrzeg. As a result of the investment, four photovoltaic installations will be created – two in the OŚ Korzyścienko (A and B) and two on the premises of the Water District Bogucino (A and B) – each with a capacity of approx. 85 kWp each. Photovoltaic installations will be planted on the premises: — plot no. 129, 127, 191/5 perimeter 0010 Turnovers (area of the Water Reception Boguciono), – plot No 314/15 perimeter 0005 Benefit (the area of sewage treatment plant in Korzyscienek) The area of the area intended for installation, in each of the two locations, will take up – approx. 0.49 ha. The area is owned by the company or is in perpetual use and has convenient access, armament and communication areas. As part of the project, photovoltaic panels on the frame will be installed on the ground. PV installations will be made in OFF GRID system with zero energy export to the grid. The energy produced will be used entirely for the OŚ Use and Water Reception in Bogucin. Each of the four installations will consist of 315 photovoltaic modules, 2 PV inverters, support structure, DC cable routes, DC intermediate switchboards with security features, AC intermediate switchboards, AC cable routes. For each of the two systems (A and B) a common monitoring and control system together with a system limiting the power outflow into the grid shall be installed. The project will also result in the expansion of the existing SCADA system and the extension/modernisation of the main switchboard. There will also be a fence and a video surveillance system with motion detectors and lighting. (English)
    21 October 2020
    0 references
    Le projet envisagé appartient à un groupe de projets fixes. Le projet consiste en la construction de 4 installations photovoltaïques d’une capacité totale d’env. 340 kWh, y compris les infrastructures de raccordement nécessaires, produisant de l’énergie pour répondre aux besoins propres des municipalités d’approvisionnement en eau et d’assainissement Sp. z o.o. ayant son siège social à Kołobrzeg. Grâce à l’investissement, quatre installations photovoltaïques seront créées — deux dans la zone de l’EIE de Korzyścienko (A et B) et deux sur la zone de l’abus d’eau de Bogucino (A et B) — chacune d’une capacité d’environ. 85 kWp chacun. Des installations photovoltaïques seront installées dans les zones suivantes: — parcelles 129, 127, 191/5 Division 0010 Chiffre d’affaires (zone de la zone de traitement de l’eau de Boguciono) — parcelle no 314/15 surface 0005 Positive (zone de station d’épuration des eaux usées à Korzyscienek) La superficie des terrains destinés à l’installation, dans chacun des deux emplacements, occupera — env. 0,49 ha. Le terrain est la propriété de l’entreprise ou est en usufruit perpétuel et a un accès pratique, des armements et des zones de transport. Dans le cadre du projet, des panneaux photovoltaïques sur le rack seront installés au sol. Les installations photovoltaïques seront réalisées dans le système OFF GRID avec des exportations d’énergie nulles vers le réseau. L’énergie produite sera entièrement utilisée pour répondre aux besoins propres de l’EIE des avantages et de la prise d’eau à Bogucin. Chacune des quatre installations sera construite avec 315 modules photovoltaïques, 2 onduleurs photovoltaïques, structure de support, voies de câbles CC, tableaux de distribution intermédiaires CC avec sécurité, tableaux alternatifs indirects avec sécurité, voies de câbles AC. Pour chacun des deux systèmes (A et B), un système commun de surveillance et de contrôle sera installé avec un système visant à limiter la production d’énergie au réseau. Le projet entraînera également une extension du système SCADA entrant et une extension/modernisation du tableau principal. Il y aura également une clôture et un système de vidéosurveillance avec détecteurs de mouvement et éclairage. (French)
    2 December 2021
    0 references

    Identifiers

    RPZP.02.10.00-32-B039/17
    0 references